Text
.
.
O
!p# Rf Cg
UNITED STATES
o
E'
3 ., q (' g
NUCLEAR REGULATORY COMMISSION
.
REGION 11
3 / \\ -' ~. E
i~
!
101 M ARtETT A sT., N.W., sutT E 3100
% '.b* [o
o,, (
8
AT' ANTA, GEORGIA 30303
JUL 0 319M
-
- ..+
In Reply Refer To:
RII:CRM
50-413/79-10
50-414/79-10
.
-
Duke Power Company
Attn:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlctte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this
office on June 12-14 of activities authorized by NRC Construction Permit
Nos. CPPR-116 and CPPR-117 for the Catawba facility, Units 1 and 2, and
to the discussion of our findings held with D. L. Freeze at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items. The status of these
items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
,
Public Document Room.
oot o 37 7
,9
'a_7
m
103
.
.
.
.
JUL 0 31979
Duke Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
-
.f2
~l4
C. E. Murphy, hief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-413/79-10
and 50-414/79-10
cc w/ enclosures:
D. G. Beam, Project Manager
Post Office Box 223
Clover, South Carolina 29710
.