Forwards IE Insp Repts 50-413/79-10 & 50-414/79-10 on 790612-14.No Noncompliance Noted
ML19249E433
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19249E431 List:
References
NUDOCS 7910010379
Download: ML19249E433 (2)


See also: IR 05000413/1979010

Text

.

.

O

!p# Rf Cg

UNITED STATES

o

E'

3 ., q (' g

NUCLEAR REGULATORY COMMISSION

.

REGION 11

3 / \\ -' ~. E

i~

!

101 M ARtETT A sT., N.W., sutT E 3100

% '.b* [o

o,, (

8

AT' ANTA, GEORGIA 30303

JUL 0 319M

-

  • ..+

In Reply Refer To:

RII:CRM

50-413/79-10

50-414/79-10

.

-

Duke Power Company

Attn:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlctte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this

office on June 12-14 of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Catawba facility, Units 1 and 2, and

to the discussion of our findings held with D. L. Freeze at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items. The status of these

items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

,

Public Document Room.

oot o 37 7

,9

'a_7

m

103

.

.

.

.

JUL 0 31979

Duke Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

-

.f2

~l4

C. E. Murphy, hief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/79-10

and 50-414/79-10

cc w/ enclosures:

D. G. Beam, Project Manager

Post Office Box 223

Clover, South Carolina 29710

.