ML19249E136

From kanterella
Jump to navigation Jump to search
RO 74-02:refueling Outage Required Eddy Current Testing of Steam Generator Tubes.Test Results to Date Indicate Wastage Problem to Be Localized & More Severe in Steam Generator a Hot Leg.No Primary or Secondary Leakage in Generators
ML19249E136
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/07/1974
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML19249E126 List:
References
FOIA-79-351 NUDOCS 7909260442
Download: ML19249E136 (4)


Text