ML19249D972
| ML19249D972 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/10/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19249D973 | List: |
| References | |
| NUDOCS 7909250624 | |
| Download: ML19249D972 (2) | |
See also: IR 05000302/1979022
Text
f0
- pa ata
'o
UNITED STATES
!'
E
NUCLEAR REGULATORY COMMISSION
M gg g-
3..
g
REGION 11
.
,
'-' -
r
3 .f
o,, h
!
101 MARIETT A sT., N.W., SUIT E 3100
E
ATLANTA, GEORGI A 3030c
% . .N #
o
...
In Reply Refer To:
RII:TJMc
50-302/79-22
4 6 , g ,-
Florida Power Corporation
Attn:
W. P. Stewart, Manager
Nuclear Operations
Post Office Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by D. R. Quick and others of
this office on June 18-22 and 25-29, 1979 of activities authorized by
NRC License No. DPR-72 for the Crystal River Unit 3 facility, and to the
discussion of our findings held with G. P. Beatty at the conclusion of
the inspection.
Araas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consi.cted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
1020
180
7909250 Q
G
.
Florida Power Corporation
-2-
AUG 101979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
Y
. C. Lewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No. 50-302/79-22
cc w/ enclosure:
G. P. Beatty, Jr.
Nuclear Plant Superintendent
Post Office Box 1228
Crystal River, Florida 32629
1020