ML19249D897
From kanterella
Jump to navigation
Jump to search
ML19249D897 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 09/21/1979 |
From: | GEORGIA POWER CO. |
To: | |
Shared Package | |
ML19249D894 | List: |
References | |
NUDOCS 7909250517 | |
Download: ML19249D897 (29) | |
Similar Documents at Hatch | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20206P6981999-01-0707 January 1999
[Table view]Ehnp Intake Structure Licensing Rept ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 ML20210J0451997-08-0808 August 1997 Extended Power Uprate Licensing Submittal ML20138G5971996-09-11011 September 1996 Rev 2 to 10AC-MGR-010-0S, Unit 1 RHR Svc Water:Release of Contaminated Water ML20115H7531996-04-30030 April 1996 Rev 0 to Evaluation of Hatch Unit 1 Shroud Vertical Weld Indications ML20094B0311995-10-31031 October 1995 Structural Margin Evlauation for Hatch 2 Internal Core Spray Lines ML20086E8241995-07-0303 July 1995 Rev 0 to Safety Evaluation for Installation of Stabilizers on Ei Hatch Nuclear Plant Unit 2 Core Shroud ML20084N3881995-05-30030 May 1995 USI A-46 Summary Rept Ei Hatch Nuclear Plant Unit 2 ML20084N3691995-05-30030 May 1995 USI A-46 Summary Rept Ei Hatch Nuclear Plant Unit 1 ML20080H8931995-02-20020 February 1995 Suppl to Shroud Repair Hardware Stress Analysis, Dtd Feb 1995 ML20077S1201994-11-30030 November 1994 Nonproprietary Safety & 10CFR50.92 Significant Hazards Consideration Assessment for RPV Stratification Prevention Improvements at Ei Hatch Nuclear Plant Units 1 & 2 ML20080H8891994-09-26026 September 1994 Shroud Repair Hardware Stress Analysis,Sept 1994 ML20072M0051994-07-31031 July 1994 Evaluation of Indications in Plant Hatch Unit-2 Core Shroud Welds H1,H2,H3 & H4 ML20069A5411994-04-19019 April 1994 Simulator Certification Form 474 Quadrennial Rept ML20059E9271993-12-31031 December 1993 Suppl Piping Earthquake Performance Data ML20044F6001993-04-29029 April 1993 Ultrasonic Insp of Feedwater Nozzles. ML20099D2021992-06-15015 June 1992 Master Trust Agreement for Decommissioning of Nuclear Plants Between Georgia Power Co & Bank of Ny,As Trustee ML20094H3981992-02-29029 February 1992 IGSCC Flaw Evaluations & Weld Overlay Activities During Ei Hatch Unit 1 Fall 1991 Outage ML20091K9531992-01-10010 January 1992 IGSCC Flaw Evaluations & Weld Overlay Activities During Ei Hatch Unit 1 Fall 1991 Outage ML20078A1101991-09-30030 September 1991 Rev 0 to Updated Feedwater Nozzle Fracture Mechanics Analysis for Ei Hatch,Unit 2 ML20091B1701991-05-31031 May 1991 Rev 0 to Evaluation & Repair of Flaw Indications in Feedwater a Safe-End to Extension Weld at Hatch,Unit 2 ML20065Q8641990-11-15015 November 1990 Isolation Function of MOVs for HPCI & RCIC Steam Supply Line & RWCU Water Supply Line for Hatch ML20055H5861990-07-20020 July 1990 Seismic Margin Assessment Edwin I Hatch Nuclear Plant, Vols 1-3 ML20058K5231990-06-26026 June 1990 Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage ML20043E6771990-06-0707 June 1990 Rev 0 to Core Operating Limits Rept for Operating Cycle 13. ML19332D2021989-12-31031 December 1989 Rev 2 to Plant Unique Analysis Rept for Ei Hatch Nuclear Plant Unit 2,Mark I Containment Long-Term Program. ML19332D2001989-12-31031 December 1989 Rev 3 to Plant Unique Analysis Rept for Ei Hatch Nuclear Plant Unit 1,Mark I Containment Long-Term Program. ML20012B7351989-11-30030 November 1989 Metallurgical Evaluation of Four-Inch Pipe-to-Elbow Weld from Plant Hatch,Unit 2. ML20245K8701989-06-29029 June 1989 Simulator Certification Submittal,Vol 2: 'Nuclear Simulator Engineering Manual.' ML20059M1231989-05-31031 May 1989 Ei Hatch Nuclear Plant Evaluation of Failure of Time Delay Relays in RWCU Differential Flow High Instrumentation During Design Basis Events ML20244E2581989-04-30030 April 1989 Station Blackout Rept ML20247C4441989-03-31031 March 1989 Unit 1 Suppression Chamber Support Anchor Bolt Study ML20234B5051987-11-30030 November 1987 Dcrdr Final Rept ML20151L7071987-11-30030 November 1987 Review of Seismic Analysis of Hatch Units 1 & 2: In-Structure Response Spectra ML20236B8351987-07-21021 July 1987 Rev 1 to Hatch 9X9 Lead Fuel Assemblies Sar ML20215G4581987-06-11011 June 1987 Rev 1 to Flaw Evaluation & Repair Design for Plant Ei Hatch Unit 1 Spring 1987 Outage ML20211H5841987-02-28028 February 1987 Rev 0 to Justification for Continued Operation W/Existing Weld Overlays at Hatch Unit 1 ML20211H6151986-12-31031 December 1986 Draft Technical Justification for Extended Weld Overlay Design Life ML20207G1961986-12-31031 December 1986 Dcrdr Summary Rept Vol I, Methodology & Approach ML20207G2241986-12-31031 December 1986 Dcrdr Summary Rept Vols II & Iia, Human Engineering Discrepancy Results ML20207L4581986-11-30030 November 1986 Revised Rept on Settlement of Major Plant Structures ML20154C4521986-08-29029 August 1986 Sys Evaluation Document for Georgia Power Co for Ei Hatch Unit 1 for Reactor Recirculation Sys (B31) ML20212J2381986-05-31031 May 1986 Rept on Settlement of Major Plant Structures ML20155G7981986-04-17017 April 1986 Rev 2 to Evaluation of IGSCC Flaw Indications & Weld Overlay Designs for Ei Hatch Unit 1-Fall 1985/86 Maint/ Refueling Outage ML20154L6451986-03-0606 March 1986 Rev 0 to Evaluation of IGSCC Flaw Indications & Weld Overlay Designs for Ei Hatch Unit 1 - Fall 1985. Maint/Refueling Outage ML20209F2541985-06-30030 June 1985 Rev 1 to Technical Justification for Continued Operation of Hatch Unit 1 W/Existing Recirculation & RHR Sys Piping ML20132C5581985-05-17017 May 1985 Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1 ML20046D3161985-03-22022 March 1985 Rept on Electrical Circuit Protective Matls. ML20113F6321985-01-31031 January 1985 Recommended Cable Tray Support Damping 1999-01-07 Category:TEXT-SAFETY REPORT MONTHYEARML20217D3061999-10-13013 October 1999
[Table view]SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19249D897&oldid=1893970"