Requests That Encl List of Incomplete Licensing Activities Be Marked to Indicate Obsolete Action Items & Priority of Remaining Items.Requests That Updated List Be Submitted within 30 Days
ML19249D491
Person / Time
Site: Pilgrim
Issue date: 08/20/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Andognini G
BOSTON EDISON CO.
References
NUDOCS 7909240728
Download: ML19249D491 (3)


Text

f

~

,,(f "%jo,,

[{kl UNITED STATES

,e j g NUCLEAR REGULATORY COMMISSION y3 *%M C

WASHINGTON, D. C. 20555 f

o 8

,o August 20, 1979 Docket No. 50-293 Mr. G. Carl Andognini M/C NUCLEAR Boston Edison Company 800 Boylston Street Bcston, Massachusetts 02199

Dear Mr. Andognini:

We are in the process of reviewing our projected work load with the intent of updating the licensing backlog.

In order to more efficiently utilize our limited resources, we are attempting to identify those action items which have.become obsolete; i.e., either the need for the action has passed, or circumstances now exist which do not warrant the expenditure cf resources necessary to accomplish the action.

The attachment to this letter provides a listing from our records of licensing activities which were initiated by you and have not been completed. We would appreciate your assistance in identifying those items which are no longer required and can be deleted. We would consider a fornal request to withdraw any application that is determined to be obsolete.

The priority we assign these activities is determined primarily by public safety considerations. However, so that we may give proper consideration to your needs, it would be helpful if you assign a priority to the remainder of the items according to their importance to you.

Also, if the attachment does not contain certain licensing actions you have requested, please identify these by reference or provide copies of your original request.

We would appreciate having the list marked up and returned within 30 days of your receipt of this letter.

You may contact your 00R project manager if you have any questions or need further discussion.

Your assistance in this regard is appreciated.

Si ncerely, l

.f Thonakk'. Icoolito, C".ief 0;eratinc Reactors 3rinch 32 Division of Oceratinc ;eactors 998 357

Enclosure:

Licens.e Requested Action :: ens n

for, acility:

Pilgrin 1909 go /

v cc,,/er m s;re:

see ;2se 2

2-Mr. G. Carl Andognini cc Mr. Paul J. McGuire Pilgrim Station Acting Manager Boston Edison Company RFD =1, Rocky Hill Road Plimouth, Massachusetts 02360 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street, N. W.

t!ashington, D. C.

20005

' Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360 s

PILGRIM 1 Incomina Date Subject 1/16/76 Containment Cooling System Pump 3/19/76 Single Loop Operation 11/4/76 Emergency Plan 11/12/76 Diesel Generator Surveillance 12/27/77 Radiation Protection Manager 12/28/77 Load Line Limit Analysis 2/1/73 Diesel Fuel Quality 3/22/78 Reactor Coolant Chemistry 3/22/78 Hydraulic Snubbers 2/5/79 Fire Modification Implementation 3/15/79 10 CFR 50.55a(g) 7/6/79 Miscellaneous TS Changes M

998 359