Requests That Encl List of Incomplete Licensing Activities Be Marked to Indicate Obsolete Action Items & Priority of Remaining Items.Requests That Updated List Be Submitted within 30 Days
ML19249D489
Person / Time
Site: Brunswick  
Issue date: 08/20/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
NUDOCS 7909240726
Download: ML19249D489 (3)


Text

.

. 11 g[m

%o,,

UNITED STATES y) s., ( j g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

%*V,o#

August 20, 1979 Docket Nos. 50-249/254/265 Mr. Cordell Reed Assistant Vice President

. Commonwealth Edison Company P. O. Box 767 Chicago, Illinois 60690

Dear Mr. Reed:

We are in the proces~s of re/fewing our projected work load with the intent of updating the licensing backlog.

In order to more efficiently utilize our limited resources, we are attempting to identify those action items which have become obsolete; i.e., either the need for the action has passed, or circumstances now exist which do not warrant the expenditure of resources necessary to accomplish the action.

The attachment to this letter provides a listing from our records of licensing activities which were initiated by you and have not been completed. We would appreciate your assistance in identifying those items which are no longer required and can be deleted.

We would consider a fomal request to withdraw any application that is determined to be obsolete.

The priority we assign these activities is determined primarily by public safety considerations. However, so that we may give proper consideration to your needs, it would be helpful if you assign a priority to the remainder of the items according to their importance to you. Also, if the attachment does not contain certain licensing actions you have requested, please identify these by reference ce provide copies of your original request.

We would appreciate having the list marked up and returned within 30 days of your receipt of this letter.

You may contact your D0R project manager if you have any questions or need further discussion.

Your assistance in this regard is appreciated.

Si ncerely, h5-5lsf bc/

Thonas /.)Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Encicsure:

Licensee Recuested Action Items for racilities:

Quad Cities and Crest en 3 cc 'derclosure:

See page 2 190924u7 % [

Mr. Cordell Reed Commonwealth Edison Company 2-cc:

Mr. D. R. Stichnoth President Iowa-Illinois Gas and Electric Company 206 East Second Avenue Davenport, Iowa 52801 Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. Nick Kalivianakas Plant Superintendent Quad Cities Nuclear Power Station 22710 - 206th Avenue - North

'Cordova, Illinois 61242 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street', N. W.

Washington, D. C. 20005 Moline Public Library 504 - 17th Street Moline, Illinois 61265 Susan N. Sekuler Assistant Attorney General Environmental Control Divisicn 188 W. Randolpn Street Suite 2315 Chicago, Illinois 60601 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 Morris Public Library EN Liberty Street

. orris, Illinois 60451 Jimmy L. Barker kclear R1gulatory Commission 3g}

P. O. Box 706 Morris, Illinois 60450

Quad Cities 1 and 2 Dresden 2 and 3 Date of Unit.

Subject Original Submittal D 2/3 High Density S. F. Racks 5/11/T9 D 2/3 Single Loop Operation 9/2/76

.D 2/3 ACAD/ CAM T. S. Change 6/23/76 D 2/3 Drywell Sump Monitoring 5/22/78 D 2/3 Appendix B Tech Specs 11/4/74 D 2/3 PCILRT Duration 4/28/78 0 2/3 Oper. w/ ADS Valve 00S 11/10/76 0 2/3 CRD Uncoupling 5/24/77 D3 Off-gas Limits 6/11/74 D 2/3 ISI Tech. Spec. Changes 9/11/78 D 2/3 and Interstation Transfer of Spenr. Fuel 5/11/79 QC 1/2 D 2/3 and Update Station Organizations 10/26/78 QC 1/2

Quad Cities 1 and 2 Date of Unit Subject Oriainal Submittal QC 1/2 Cooling Mode Temp. Limit Change 2/2/79 QC 1/2 Rad Chem Tech Qualification 8/2/77 QC 1/2 PCILRT Duration 3/21/78

-Qc 1/2 I'nstrument Set Point Changes 11/7/76 2/21/78 QC 1/2 LTPF Surveillance TS Change 10/24/77 QC 1/2' ACAD/ CAM TS Change 10/24/77 QC 1/2 CRD Uncoupling 6/8/77 QC 1/2 LLRT Acceptance Criteria 2/3/78 QC 1/2 MSIV' Testing Requirements 9/27/77 QC 1/2 Drywell Sump Monitoring 5/22/78 QC 1/2 RWCU System Valve T.S.

5/22/78 QC 1/2 Jet Pump Operability 9/19/75 QC 1/2 Correct Listing Smoke Detectors and 1/8/79 Sprinklers QC 1/2

. Correct Listing Heat Detectors 6/6/78 QC 1/2 ASME Code Edition T.S. Change 10/13/76 QC 1/2 RHR System TS Change 3/19/75 QC 1/2 ISI T.S. Change 4/18/79 g90