Forwards IE Insp Repts 50-327/79-35 & 50-328/79-20 on 790710-13.No Noncompliance Noted
ML19249D464
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/31/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19249D465 List:
References
NUDOCS 7909240697
Download: ML19249D464 (2)


See also: IR 05000327/1979035

Text

- *

f

'o,

UNITED STATES

,g7

. g

,n

NUCLEAR REGULATORY COMMISSION

3

hN

$ -

)',-*I/ E

REGION 11

o,

[

101 M ARIETT A sT., N.W., sulTE 3100

br

e

ATLANT A, GEORGI A 30303

.....

Ny%yReferTo:

JUL 311979

50-327/79-35

50-328/79-20

Tennessee Valley Authority

Attn:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office

on July 10-13, 1979 of activities authorized by NRC Construction Permit

Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, Units 1

and 2, and to the discussion of our findings held with G. G. Stack at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Roc:n.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

,

pog 240 697

a

-

JUL 311979

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

'

C. E. Murphy, ~CliTel

Reactor Construction and

Engineering Support Branch

Enclosures:

J. E. Gi11 eland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, Tennessee 37401

G. G. Stack, Project Manager

Post Office Box 2000

Daisy, Tennessee 37319

J. M. Ballentine

Plant Superintendent

Post Office Box 2000

Daisy, Tennessee 37319

J. F. Cox

400 Comerce Street

W9D214

Knoxville, Tennessee 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

&