Forwards IE Insp Rept 50-364/79-10 on 790709-11.No Noncompliance Noted
ML19249C942
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/24/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19249C941 List:
References
NUDOCS 7909190315
Download: ML19249C942 (2)


See also: IR 05000364/1979010

Text

'/

%

UNITED STATES

-

! j ., , c g

NUCLEAR REGULATORY COMMISSION

'" -

c

REGION 11

.l

,

o,

[

101 MARIETTA ST.. N.W.. SUITE 3100

% %/

g'

ATLANT A, GEORGI A 30303

    • "*

JUL 241979

In Reply Refer To:

RII:MDH

50-364/79-10

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on July 9-11,

1979, of activities authorized by NRC Construction Permit No. CPPR-86 for the

Joseph M. Farley Plant, Unit 2 facility, and to the discussion of our findings

held with J. A. Mooney at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examintions of procedures and representative records, interviews with

personnel, and (b:ervations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specifit i period,

the report will be placed in the Public Document Room.

qh

79091903t5

DUL 2 41979

'.

.

Alabama Power Company

-2-

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

h@

c-

g Charles E. Murphy, Chief

I

Reactor Construction and Engineering

Support Branch

Enclosure:

Iaspection Report No. 50-364/79-10

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford: AL 36312

.

.v

-

)