ML19249C942
| ML19249C942 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/24/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19249C941 | List: |
| References | |
| NUDOCS 7909190315 | |
| Download: ML19249C942 (2) | |
See also: IR 05000364/1979010
Text
'/
%
UNITED STATES
-
! j ., , c g
NUCLEAR REGULATORY COMMISSION
'" -
c
REGION 11
- .l
,
o,
[
101 MARIETTA ST.. N.W.. SUITE 3100
% %/
g'
ATLANT A, GEORGI A 30303
- "*
JUL 241979
In Reply Refer To:
RII:MDH
50-364/79-10
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by M. D. Hunt of this office on July 9-11,
1979, of activities authorized by NRC Construction Permit No. CPPR-86 for the
Joseph M. Farley Plant, Unit 2 facility, and to the discussion of our findings
held with J. A. Mooney at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examintions of procedures and representative records, interviews with
personnel, and (b:ervations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specifit i period,
the report will be placed in the Public Document Room.
qh
79091903t5
DUL 2 41979
'.
.
Alabama Power Company
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
h@
c-
g Charles E. Murphy, Chief
I
Reactor Construction and Engineering
Support Branch
Enclosure:
Iaspection Report No. 50-364/79-10
cc w/ encl:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford: AL 36312
.
.v
-
)