ML19249C931
| ML19249C931 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 08/02/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mary Johnson SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML19249C930 | List: |
| References | |
| NUDOCS 7909190301 | |
| Download: ML19249C931 (2) | |
See also: IR 05000395/1979023
Text
.
.
UNITED STATES
/
o
l'
_.
/g
NUCLEAR REGULATORY COMMISSION
REGION 11
,
- -'
e
,
!
101 MARIETT A sT., N.W.. sulT E 3100
o
ATLANTA, GEORGI A 303o3
[
- ...+
AUG 0 % 1979
In Reply Refer To:
RII:WPA
50-395/79-23
South Carolina Electric and Gas Company
ATTN:
M. C. Johnson, Vice President
Special Services and Purchasing
P. O. Box 764
Columbia, SC 29218
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on July 11-
13, 1979, of activities authorized by NRC Construction Permit No. CPPR-99 for
the Virgil C. Summer Nuclear Station facility, and to the discussion of our
findings held with D. A. Nauman at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in tae NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
If we do not hear from you in this regard within the specified period,
document.
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
s
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
-,
See Page 2
.\\ O 3
79091902
'] $
~
.
.
.
AUG 0 2 B79
South Carolina Electric and
Gas Company
-2-
,
Enclosure:
Inspection Report No. 50-395/79-23
cc w/ encl:
T. B. Conners, Jr.
Conners, Moore and Corber
1747 Pennsylvania Avenue, N. W.
Washington, DC 20006
A. A. Smith
Quality Assurance
P. O. Box 8
Jenkinsville, SC 29065
O. S. Bradham, Manager
Nuclear Operations
P. O. Box 8
Jenkinsville, SC 29065
,
\\
,b]