ML19249B881
| ML19249B881 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 07/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Proffitt W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML19249B873 | List: |
| References | |
| NUDOCS 7909070021 | |
| Download: ML19249B881 (2) | |
See also: IR 05000338/1979023
Text
.
y[
'e,
UNITED STATES
e
.# cf' n
NUCLEAR REGULATORY COMMISSION
,
~f [E
$ .l
REGION ll
h
101 MARIETT A sT. N W. sulTE 3100
o,
\\ ' .b'. . . ' '
ATLANT A, G EORGI A 30303
p
In Reply Refer To:
JUL 0 51979
RII:JJL
50-338/79-23
50-339/79-32
50-404/79-04
50-405/79-04
_
Virginia Electric and Power Company
Attn:
W. L. Proffitt
Senior Vice President, Power
Post Office Box 26666
Richmond, Virginia 23261
Gentlemen:
This re6.rs to the inspection conducted by J. J. Lenahan of this office
on May 29 through June 1, 1979 of activities authorized by NRC License
No. NPF-4 and Construction Permit Nos. CPPR-78, CPPR-114 and CPPR-115
for the North Anna Power Station facility, Unit Nos. 1, 2, 3 and 4, and
to the discussion of our findings held with P. G. Perry at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201
/ 'j 2
' ' '/
7 909 07 o On? /
-
.
JUL 0 519N
Virginia Electric and
-
Power Company
-2-
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid furt;
aoncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public tocument
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this ofifce to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed la the Public Document Room.
Should you have any questions concerning this letter, we will be gla; to
discuss them with you.
Sincerely,
C. E. Murp(hy,
ief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-338/79-23,
50-339/79-32, 50-404/79-04 and
50-405/79-04
cc w/ enclosures:
W. R. Cartwright, Station Manager
Box 402
Mineral, Virginia 23117
P. G. Perry
Senior Resident Engineer
Post Office Box 38
Mineral, Virginia 23117
c , 9 'e
(. D: :J
L
' c
.