05000366/LER-1979-092-03, /03L-0:on 790813,during Routine Surveillance Procedure,Main Steam Line Radiation Monitor Functional Test & Calibr Instrument 2D11-K603B Setpoint Exceeded Tech Specs.Caused by Setpoint Drift.Instrument Recalibr

From kanterella
(Redirected from ML19249B823)
Jump to navigation Jump to search
/03L-0:on 790813,during Routine Surveillance Procedure,Main Steam Line Radiation Monitor Functional Test & Calibr Instrument 2D11-K603B Setpoint Exceeded Tech Specs.Caused by Setpoint Drift.Instrument Recalibr
ML19249B823
Person / Time
Site: Hatch 
Issue date: 08/29/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249B818 List:
References
LER-79-092-03L, LER-79-92-3L, NUDOCS 7909050489
Download: ML19249B823 (1)


LER-1979-092, /03L-0:on 790813,during Routine Surveillance Procedure,Main Steam Line Radiation Monitor Functional Test & Calibr Instrument 2D11-K603B Setpoint Exceeded Tech Specs.Caused by Setpoint Drift.Instrument Recalibr
Event date:
Report date:
3661979092R03 - NRC Website

text