[pm RfCg
o
UNITED STATES
!'
"%
NUCLEAF. REGULATORY COMMISSION
(
.
5J
E
REGION 11
' " -
g ^ *v$
8
101 MARIETTA sT., N.W.. SUITE 3100
o,
,/
ATLANTA, GEORGI A 30303
JUL 0 51979
-
In Reply Refer To:
RII: RET
50-327/79-33
50-328/79-18
/
Tennessee Valley Authority
ATTN: H. G. h rris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by R. E. Trojanowski of this office on
June 14, 1979, of activities authorized by NRC Construction Permit Nos. CPPR-72
and CPPR-73 for the Sequoyah Units 1 and 2 facility, and to the discussion of
our findings held with J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
perst.nnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Titl<
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Y
Yi
C
Jack T. Sutherland, Chief
Fuel Facility and Matertuls
Safety Branch
o n g.,,
ov.s40
Enclosure:
See Page 2
8
790904o O
.
JUL 0 51979
.
Tennessee Valley Authority
-2-
s
Enclosure:
Inspection Report Nos. 50-327/79-33
and 50-328/79-18
cc w/ encl:
J. E.,Gilleland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville,'lW 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
c ., maA
0 \\. ' ' WLS
.