ML19249A772
| ML19249A772 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/10/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19249A773 | List: |
| References | |
| NUDOCS 7908240303 | |
| Download: ML19249A772 (2) | |
See also: IR 05000269/1979013
Text
b
[ga arc
o
UNITED STATES
E'
. , fff %
NUCLEAR REGULATORY COMMISSION
.
1-*/
E
REGION 11
- eo, k $
101 MARIETTA sT., N W.. SUITE 3100
gw ,/
AT L ANT A, GEORGI A 30303
JUL 101979
In Reply Refer To:
RII:NE
50-269/79-13
50-270/79-13
50-287/79-14
.
Duke Power Company
ATTN:
W. O. Farker, Jr.
Vice President, Steam Production
P. O. Box 33189
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by N. Economos of this office on May 29
to June 1 and June 5-6, 1979, of activities authorized by NRC Operating License
No. DPR-38, DPR-47, and DPR-55 for the Oconee 1, 2, and 3 facility, and to the
discussion of our findings held with J. E. Smith at the conclusica of the inspec-
tion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection ecsnsisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspecticas.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this of fice to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepare 3 so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
_.3
'
n
Lo 3
7908240]
.
JUL 101979
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-269/79-13
50-270/79-13, and 50-287/79-14
cc w/ encl:
J. E. Smith, Station Manager
P. O. Box 1175
Seneca, SC 29678
,e
c
,) \\
,