Forwards IE Insp Repts 50-269/79-13,50-270/79-13 & 50-287/79-14 on 790529-0601 & 05-06.No Noncompliance Noted
ML19249A772
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/10/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19249A773 List:
References
NUDOCS 7908240303
Download: ML19249A772 (2)


See also: IR 05000269/1979013

Text

b

[ga arc

o

UNITED STATES

E'

. , fff %

NUCLEAR REGULATORY COMMISSION

.

1-*/

E

REGION 11

  • eo, k $

101 MARIETTA sT., N W.. SUITE 3100

gw ,/

AT L ANT A, GEORGI A 30303

JUL 101979

In Reply Refer To:

RII:NE

50-269/79-13

50-270/79-13

50-287/79-14

.

Duke Power Company

ATTN:

W. O. Farker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by N. Economos of this office on May 29

to June 1 and June 5-6, 1979, of activities authorized by NRC Operating License

No. DPR-38, DPR-47, and DPR-55 for the Oconee 1, 2, and 3 facility, and to the

discussion of our findings held with J. E. Smith at the conclusica of the inspec-

tion.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection ecsnsisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspecticas.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this of fice to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepare 3 so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

_.3

'

n

Lo 3

7908240]

.

JUL 101979

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

Charles E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-269/79-13

50-270/79-13, and 50-287/79-14