ML19249A770
| ML19249A770 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/06/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19249A771 | List: |
| References | |
| NUDOCS 7908240302 | |
| Download: ML19249A770 (2) | |
See also: IR 05000327/1979025
Text
TTc.
'
mcw
[e
UNITED STATES
o
8'
,. g(' ,n
NUCLEAR REGULATORY COMMISSION
'
4
O-
'-' /
E
REGION 11
$
f
101 MARIETTA sT., N.W.. sulTE 310o
ATL ANT A, GEORGI A 30303
'AJ
j
.....
In Reply Refer To:
Jul.
6 1979
RII:TJD
50-327/79-25
Tennessee Valley Authority
ATTN:
H.'G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 3740i
Gentlemen:
This refers to the inspection conducted by T. J. Donat of this office on April 17-
22, April 30, May 7-11, 1979, of activities authorized by NRC Construction
Permit No. CPPR-72 for the Sequoyah Unit i f acility, and to the discussion of
our findings held witn W. F. Popp at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these arecs, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulstions, a copy of this rtter and the enclosed inspection
report will be placed in the NRC's Public Docuuent Room. If this report contains
any inform, tion that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it _s claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in thic regard within the specified period,
the report will be piaced in the Public Document Room.
Should you have any questions concerning this 14tter, we will be glad to discuss
them with you.
Sincerely,
f
,b ~W
Richard C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
no
,mi
Enclosure:
/
i
j
,-
See Page 2
7 9 08 240 3cq
?
.
Ter.nessee Valley Authority
-2-
JUL
6 1979
Enclosure:
Inspection Report No. 50-327/79-25
cc w/ enc 1:
J. E. Gi11 eland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattenooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
n
y-
m
'
il
.