IE Insp Repts 50-339/79-33,50-404/79-05 & 50-405/79-05 on 790529-31.No Noncompliance Noted.Major Areas Inspected: 10CFR50.55(e) Items,Response to IE Bulletins & Site QA & QC Organization & Responsibilities
ML19249A665
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/20/1979
From: Bryant J, Mcfarland C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19249A662 List:
References
50-339-79-33, 50-404-79-05, 50-404-79-5, 50-405-79-05, NUDOCS 7908240118
Download: ML19249A665 (6)


See also: IR 05000339/1979033

Text

c# %

UNITED ST ATES

,.d'.

'\\

-

NUCLEAR REGULATORY COMMISSION

s

( yI i

o

REGION 11

i

r

  • ' !

101 MARIET T A ST., N W . sulT E 3100

.,. ;pf

g

AT L ANT A GionGI A 30303

.....

Report Nos. 50-339/79-33, 50-404/79-05, and 50-405/79-05

Licensee: Virginia Electric and Power Coepany

P. O. Box 26666

Ricleand, Virginia 23261

Facility Name: North Anna Units 2, 3, and 4

Docket Nos. 50-339, 50-404 and 50-405

License Nos. CPPR-78, CPPR-114 and CPPR-115

Inspection at North Anna site near Mineral, Virginia

Inspector:

[

M

i-24-2)

C. R. McFarland

Date Signed

Approved by:

7[

eg-

_ J ygyf

J. C. Bryant

ate Signed

t

SUM.MRY

Inspection on May 29-31, 1979

Areas Inspected

This routine, unannounced inspection involved twenty four inspector-hours onsite

in the areas of 10 CFR 50.55(e) items (Units 2, 3 and 4), IE Bulletins (Units 3

and site QA and QC organization and responsibilities.

Results

Of the three areas inspected, no apparent items of nonccepliance or deviations were

identified.

~

~

g

/g

T'

7908240,

)

.

.

.

DETAILS

1.

Persons Contacted

Licensee Employees

  • P. G. Perry, Senior Resident Engineer

E. R. Bane, Supervisor, Construction QA

  • P. A. Slater, QA Engineer
  • M. A. Harrison, QC Engineer

Contractor Organization

'

Stone and Webster Engineering Corporation (S&W)

A. A. Dasenbrock, Resident Manager

  • C. A. Goody, Superintendent, Construction
  • R. L. Spence, Superintendent, Field Quality Control (FQC)

J. Howard, Senior FQC Engineer

  • B. R. Hall, Senior FQC Engineer

A. Clawson, Jr. , FQC Engineer

F. P. Carchedi, FQC Engineer

W. Davis, Senior QC Inspector

R. Ferguson, Senior QC Inspector

W. G. Slocumb, Senior QC Inspector

R. King, Electrician

D. Mueller, Supervisor, Construction Acceptance & Test (CAT)

Klockner-Moeller Corporation (K-M)

R. Geissler, Project Engineer

NRC Resident Inspector

M. S. Kidd

Other licensee employees contacted included several construction craftsmen.

  • Attended exit interview

2.

Exit Interview

The inspection scope and findings were summarized on May 31, 1979, with

those persons indicated in Paragraph 1 above.

The VEPC0 cenior resident

engineer confirmed that the present schedule for loading fuel was June 26,

1979 and that the construction permits for Units 3 and 4 have been extended

for five years. The inspector explcined that the reporting of new 10 CFR 50.55(e) items for Unit 2 would be documented in the NRC Resident Inspector's

report.

Q~i,

-

e

-

.

'

-2-

3.

Licensee Action on Previous Inspection Findings

(Open) Item 50-404/405/79-02-01 Humidity in internals of components in

storage, Units 3 and 4.

The inspector reviewed documentation relative to

the Babcock and Wilcox Company's (B&W) concern for the deficiencies in the

storage of the reactor vessel and internals, the steam generators, other

reactor coolant system components, and other safety related components

supplied by B&W.

Discussions with the VEPC0 senior resident engineer indicate that in June 1979

VEPC0 will begin to construct new warehouses (40,000 square feet of level B

and 40,000 square feet level C) for the storage of equipment for Units 3

and 4 as part of a program to correct the deficiencies cited by B&W and the

concern identified in Region II reports 50-404/79-2 and 50-405/79-2. This

item was inadvertently identified as 50-404/78-06-01 and 50-405/78-06-01 in

that report; the correct numbers for the unresolved items are 50-404/79-02-01

and 50-405/79-02-01.

Construction of the warehouses is scheduled to be

completed in November 1979.

6.

Unresolved Items

Unresolved items are matters about which more information is required to

determine whether they are acceptable or may involve noncompliance or

deviations. Two new unresolved items identified during this inspection are

discussed in Paragraph 7.

5.

Licensee LJentified Items

VEPC0 has reported a number of items to Region II in compliance with IC CFR

50.5s(e) and/or 10 CFR 21, and the inspector reviewed the items noted below

and the supporting documentation, and discussed the items with responsible

staff during the inspection.

a.

(Closed) Items 50-339/78-36-02 Spare Pipe Penetretions, Unit 2.

The

inspector reviewed the VEPC0 final report dated February 1,

1979,

serial number 661 B, the interim reports dated November 22, 1978 and

December 20, 1978 and documentation relative tc !.ngineering and Design

Coordination Report (E&DCR) 2519.

S&W has installed welded caps on

the outside containment ends of all 29 spare penetrations in accordance

with the VEPC0 commitment in FSAR Section 6.2.4.3.

The inspector

observed the following penetrations as typical examples of the various

designs of caps for the various sizes (1/4, 3/4, 2, 4 and 6 inches

diameter pipe) materials (carbon steel and stainless steel) and wall

thickness (schedule 40, 40S, 50, 80S and 160): Nos. 23, 34, 51, 52,

95, 97, 98, 101, 102, 105, 115 and 116. The inspector reviewed the

Weld Data Sheets for penetrations 23, 51, 52, 95, 97, 98, 101, 102,

105, 115 and 116 noting the requirements for such items as fitup,

nondsetructive testing (NDE) and weld procedure.

b.

(Closed) Item 50-339/78-36:05 Service Water Reservoir Spray System

Pipe Break, Unit 2.

The inspector reviewed the VEPC0 final report

dated February 9, 1979, serial number 720 B, the interim reports dated

ip

') 7 ,;

.

.

-3-

December 15, 1978 and January 10, 1979, and the corrective action as

reported in Nonconformity and Disposition Reports (NED) Nos. 3610 and

3730 and E&DCR's P-2549, P-2583 and P-5217. These reports document

the repairs, modificatione and installation of the service water spray

and header piping and supports as described in the final report dated

February 9,1979.

The inspector reviewed the QC inspection reports and observed in the

storage areas typical specimens of damaged pipe, repaired pipe and new

pipe.

c.

(Closed) Items 50-339/79-21-05, Reactor Coolant Pump Flow Splitter

Plates, Unit 2.

The inspector reviewed the VEPCO final report dated

May 4,1979, serial number 191 B, and the interim reports dated March 27,

1979 and April 20, 1979 relative to the cracks found in the subject

splitter plates for the pumps in loops A and C of Unit 2.

The corrective

action was to remove the splitter plates from all three loops of

Unit 2.

KRR is reviewing the hydraulic system changes and the causes

of the cracks. Westinghouse has determined that the effect of removing

the plates is negligible upon pump performance and tbst the resultant

flow provides a margin of flow that is conservative and acceptable.The

resident inspector visually inspected the inside surfaces of the

piping after the splitter plates were removed. This item was closed

for Unit 1 in IE Report 50-33/79-20.

The inspectot reviewed the documentation in NSD 3731 of the repair

work, the NDE testing, the content of the materials and the QC surveil-

lance of the repair work. There has been no reduction in the thickness

of the pipe wall.

d.

(Closed) Item 50-339/79-21-06, Motor Control Center (MCC) Starter for

Motor Operator Valve (MOV) RS-201B, Unit 2.

The inspector reviewed

the VEPC0 final report dated April 3, 1979, serial number 209, and the

corrective action as reported in N&S 3/28 for completed work on the

subject starter in cabinet 2-EP-MC-20. The inspector observed similiar

work in cabinet 2-EP-MC-11 and discussed the potential generic implica-

tions with appropriat

SW staff and the K-M project engineer for the

subject reversing r

starter supplied by K-M. There are an estimated

1300 to 1500 of thea_ starters used in Units 1 and 2 (aproximately 300

in class IE applications). Discussions with senior S & W staf f and the

K-M project engineer confirm the low failure rate reported by VEPC0; i.e. ,

three class IE f ailures and less that three failures for a;l nonclass IE

reversing starters supplied by K-M.

The K-M project engineer has visited the site for each f ailure. The

starter is a catalog item, hence it is not under Part 21 reporting

requirements. The defects were sustained during a construction checkout

procedure and corrected prior to being released to the Operati_as. Groups.

VEPCO concludes that this f ailure does not represent a generic defect with

the equipment.

,p<

') ] l

..

.

.

.

-4-

e.

(Closed) It m 50-339/79-28-02, Flux Thimble Tubing, Unit 2.

The

inspector reviewed the VEPC0 final report dated April 9,1979, serial

number 235, the corrective action to replace all the flux thimble

tubing for incore instrumentation as reported in NCD 3745, and the QC

inspection report of the work performed in accordance with directions

provided by Westinghouse.

f.

(Reopen and Clos d) Item 50-404/405/78-07-06, Recirculation Spray

Cooler Vent Problem (Units 3 & 4). The inspector reviewed the S&W to

VEPC0 letter dated May 10, 1979, which transmitted their review and

approval for Joseph Oat Corporation report " Water Hanner Analysis of

the Recirculation Coolers, Revision 2"

and related correspondence

concerning the analysis. The revision reviews a more vigorous analysis

of the effect of flow transients in the recirculation coolers that

corrects certain errors and inadequacies noted in the original analysis.

During the various reviews of the water hammer analysis, S&W independently

calculated the tube deflection.

S&W concurs with the Joseph Oat

Corporation conclusion that the existing cooler design is satisfactory

and capable of withstanding the startup hydraulic transient.

No noncompliances were identified.

6.

It Bulletins (IEB)

(Closed) IEB 78-12 Atypical Weld Material in Reactor Pressure Vessel

a.

Welds, Units 3 and 4.

The inspector has reviewed the VEPC0 response

to Region II dated May 17, 1979, serial number 322, which provides all

the required responses to IEB's 78-12,78-12A and 78-12B.

B&W the

manufacturer of the North Anna 3 and 4 vessels, has prepared a generic

report to the NRC dated March,1979 responding to IEB's 78-12 and

78-12A, indicating no atypical weld material in the Unit 3 and 4

vessels. VEPC0 has reviewed the material records for the vessels and

has verified that the B&W report covers all applicable welding wire

employed for the Unit 3 and 4 vessels and concurs with the B&W negative

conclusion,

b.

(Open) IEB 79-03 Longitudinal Weld Defects in ASME SA-312 Type 304

Stainless Steel Pipe Spools Manfactured by Youngstown Welding and

Engineering Company, Units 2, 3, and 4.

VEPCO's letter dated May 10,

1979, inf o rms Region II of their extensive record review and their

need for an additional 30 days minimum to reply.

(Closed) IEB 79-04 Incorrect Weights for Swing Check Valves Manufactured

c.

by Velan Engineering Corporation, Unitt 3 and 4.

VEPCO's letter dated

May 24, 1979 informs Region Ti that no Velan check valves have been

purchased for Units 3 and 4.

d.

(0 pen) IEB 79-07 Seismic Stress Analysis of Safety Related Piping,

Units 3 and 4.

VEPCO's letter to Region II dated May 24, 1979 inf o rms

Region II that no cor.puter codes were employed which used any of the

methods described in item 1 of IEB 79-07.

Inforuation submitted in

response to other items in the 16B has not been evaluated.

" /8

?80

.

. .

-5-

.

No items of ncncompliance were identified.

7.

Independent Inspection

Site QC Organization and Program, Units 3 and 4.

The inspector reviewed

a.

the VEPCO Construction Quality Control Manual (CQCM) Appendix A dated

May 22, 1979, which provides (attachment 1) an organization chart with

titles that have been prepared and conceptually approved by VEPCO

listing of responsibilities of the

management and (attachment 2) a

interim organization. For the interim period before full construction

resumes on Units 3 and 4, the organization is to fulfill the assigned

responsibilities.

The responsibilities include an itec related to a QA audit program of

construction activities by staff positions labeled QA on attachment 1

of Appendix A, QC on attachment 7.1 of CQCM 1.1, and both QA and QC on

attachment 2 of Appendix A. CQCM Procedure 1.1 provides for VEPC0 site

staf f to perform site OC work on Units 3 and 4 with VEPC0 Richmon? staf f

to perform the QA function. A consistant clarification of responsibi-

lities for QA and QC work will be unresolved item 50-404/405/79-05-01

" Auditing of Construction Activities".

The inspector revicwed the CQCM relative to the evaluation of 10 CFR 50.55 (e) items as required by the VEPC0 QA Manual, Section 5.13. Addi-

tional Procedures in the CQCM need to be provided to assure evaluation

of 10 CFR 50.55(e) items by the first level of management. This will be

designated as unresolved item 50-404/405/79-05-02, " Resident QC Engineer-

ing Evaluation of 10 CFR 50.55(e) Items".

b.

Containment Structural Concrete, Unit 3

The inspector observed the placement of part of the first lift for the

containment wall of Unit 3 and reviewed the Specification, NAS-30120,

for placing the concrete and CQC Procedure 10.2, Concrete Quality Control.

This activity is covered in Report No. 50-404/79-6.

No items of noncompliance were identified.

~,p