Forwards IE Insp Rept 50-395/79-18 on 790522-25 & Notice of Violation
ML19249A647
Person / Time
Site: Summer 
Issue date: 06/14/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19249A640 List:
References
790619, NUDOCS 7908240090
Download: ML19249A647 (2)


See also: IR 05000395/1979018

Text

o

kB 8IO

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

$ ' 3.mf/ o

'

e

Vc E

REGION 11

o,, %' b/ [p

%

,f

101 M ARIETT A sT., N.W., sUlT E 3100

AT L ANT A, GEORGI A 30303

\\ ... +

In Reply Refer To:

JUN ]g9g7g

RII:RJH

50-395/79-18

South Carolina Electric and Gas Company

Attn:

M. C. Johnson, Vice President

Special Services and Purchasing

Post Office Box 764

Columbia, South Carolina 29218

Gentlemen:

This refers to the inspection conducted by R. J. Hardwick of this office

on May 22-25, 1979 of activities authorized by NRC Construction Permit

No. CPPR-94 for the k. C. Summer Nuclear Station facility, Unit 1, and

to the discussion of our findings held with J. F. Algar at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, intervie n with personnel, and observations by the inspector.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any informataan that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information ';.;,'j,u01

_

c,.

.

7908240h

.

.

JLRi 1.01979

South Carolina Ele:tric and

-2-

Power Company

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

$

C. E. Murphy, Chief

-

3 Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-395/79-18

,,

cc w/ enclosures:

T. B. Conners, Jr.

Conners, Moore anu Corber

1747 Pennsylvania Ave-:e, N.W.

Washington, D.C.

20006

A. A. Smith

Quality Assurance

Post Office Box 8

Jenkinsville, South Carolina 29065

O. S. Bradham, Manager

Nuclear Operations

Post Office Box 8

Jenkinsville, South Carolina 29065

..