D
>= arco
'o,
UNITED STATES
+
8
',
NUCLEAR REGULATORY COMMISSION
3 ,,
n
E
REGION 11
$,
',-
' - ^ -
o,, -
8,
101 MARIETT A sT., N.W., SUITE 310o
\\ . . . . +
e
AT LANTA, G EORGI A 30303
In Reply Refer To:
JUN 0 s 1979
RII:JJL
50-566/79-08
50-567/79-08
Tennessee Valley Authority
Atta:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office
on May 21-24, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-172 and CPPR-173 for the Yellow Creek Nuclear Plant facility,
Units 1 and 2, and to the discussion of our findings held with M. M.
Price at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
< ' ,
\\.
79082105W
JUN 0 5 h79
-
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
Charles E. Murp
Nfbf
,
Reactor Construction and
Engineering Support Eranch
Enclosures:
Inspection Report Nos. 50-566/79-08
and 50-567/79-08
cc w/ enclosures:
J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902
M. M. Price, Project Manager
Post Office Box 2000
Iuka, Mississippi 38852
D. L. Terrill, Project Engineer
400 Commerce Street Tower II
Chattanooga, Tennessee 37401
-
3
s
.- '