Forwards IE Insp Rept 50-366/79-18 on 790508-10.No Noncompliance Noted
ML19249A285
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/04/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19249A286 List:
References
NUDOCS 7908210562
Download: ML19249A285 (2)


See also: IR 05000366/1979018

Text

. . _ . . .

. _

. .

.._

. _ . _

. . . . . . . . .

.

.

.

b

0

UNITED STATES

  1. ga ar0

'

NUCLEAR REGULATORY COMMISSION

9,,

,

,

REGloN il

e

g

u

101 M ARIETTA STREET.N.W.

5

-

.T[E

ATLANT A, GEORGI A 30303

.

.

+, . . . . . +!

JUN 0 41979

.

In Reply Refer To:

g

RII:LM

.

50-366/79-18

Georgia Power Company

Attn:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

Tnis refers to the inspection conducter' by L. Modenos of this office on

hay 8-10, 1979 of activities authorized by NRC License No. NPF-5 for the

Hatch Nuclear Plant facility, Unit 2, and to the discussion of our

findings held with M. Hanry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

,

records, interviews with personnel, and observations by the inspector.

'

Within the scope of this inspection, no items of noncompliance were

.

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

'

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

-

,

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

'

claimed that the information is proprietary, and should be prepared so

.

.4

that precrietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

'.

T 9 9 rg

gum

-

o F[ ' - lr, r -

r !\\r

i

.-

1

i

!

,g

gi1

l

!

a 1 J t t ul; bu llu z

,

.

7908'2,10 N9

!'

_ _ _ _ _ _

.

_ . _ . _ _ _ . _ _ . . .

. . _ _ _

._

_

__.

-

_

. _ _ _

.

. . . . _ . . _ . ..

.

JUN 0 4 879

-

.

.

Georgio Power Company

-2-

-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

.

.

Sincerely,

/

I r

Charles E. Murph , Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report No. 50-366/ />-18

cc w/ enclosure:

M. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

Post Office Box 442

,

Baxley, Georgia 31513

L. L. Gray, Jr.

.

Construction Project Manager

Post Office Box 329

Baxley, Georgia 31513

.