AVERAGE DAILY UNIT POWER LEVEL 50-245 DOCKET NO.
UNIT Mil 1 stone 1 790809 DATE COMPLETED BY R. Youno 203-447-1792 TELEPIIONE X-4/b MONTH Julv DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) t hiWe-Net) 588 652
,7 2
275 18 650 3
95 19 654 463 4
2c 654 592 3
21 654 6
652 22 654 653 7
23 654 8
24 655 9
653 25 650 654 10 26 A54 27 652 1,
654 28 654
~
654 13 29 652 14 M4 30 653 15 65/.
31 649 654 16 INSTRUCTIONS On this format. fist the average daily unit power !evelin Mwe. Net for each da)'in the repornng intinth. Compute to the nearest whole megawatt.
NOTE: MDC of 654 MWe is based on commitment to New England Po'wer Pool.
10/77)
', is
,1 4 7 9 08 210 0 3 ^
/Y
OPERATING DATA REPORT DOCKET NO.
50-245 DATE 790004 C051PLETED BY R. Youno TELEPHONE 203-44/-l792 X-475 OPERATING STATUS fiilIstone 1 Notes
- 1. Unit Name:
Ju1y 1979
- 2. Reporting Period:
- 3. Licensed Thermal Power IMWt):
2011
- 4. Nameplate Rating (Gross 51We):
662 660
- 5. Design Electrical Rating (Net MWe):
684
- 6. Maximum Dependable Capacity (Gross MWe):
654
- 7. Maximum Dependable Capacity (Net Slwel:
- 8. If Changes Occur in Canacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
NA NA
- 9. Power Level To which Restricted. lf Any (Net MWe):
NA
- 10. Reasons For Restrictions,if Any:
'Ihis Month Yr.-to.Date Cumularise 744 5,087 76.007.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 732 3,294 57,781
- 13. Reactor Resene Shutdown Hours 0
0 892.
- 14. Hours Generator On.Line 713.9 3,194.2 5a.514.5
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated iMWH) 1,396,779 6.f32,862 o7.096.I60
- 17. Gross Electrical Energy Generated tMWH) 476,500 _,
2,052,200 32,857,296
- 18. Net Electrical Energy Generated (MWH) 466 601 1,952,689 31,371,207
- 19. Unit Service Factor 96.0 62.8 71.7
- 20. Unit Asailability Factor 06 0 62.8 71.7
- 21. Unit Capacity Factor (Using MDC Net) 93.6 58.7 63.1
- 22. Unit Capacity Factor (Using DER Net) 92.8 58.2 62.5 4.0 10.5 17.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eachi:
A ten day outage is tentatively scheduled for the last week in October for en-nlianca
'.f i t h 4RF Rollp*in 79-14
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units in Test Status Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICA LITY NA INITIAL ELECTRICITY COMMERCI \\L OPER ATION (0/77)
l l
UNIT SifUTDOWNS AND POWER REDUC 110NS DOCKET NO.
En W UNIT N AME Millstone 1 DATE 790809 REPORT MLNT11 July COMPLETED BY R.
Youna TELEPilONE 203-44~-1792
/
X-475 l
e.
E c
!E S
j Yl Licensee 5 r,
{g Cause & Corrective No.
Date g
3g
(
,;;; y 5 Event 17 g'3 Action to y5 5
5 iy3 H
Repor x mO Prevent Recurrence c
o g
o O
T O
Q 10 790702 F
30.1 A
3 NA PA Blower Unit was removed from service by y
a reactor low water level scram caused from feedwater reg. valve g
lock-up on loss of both plant air y
compressors. The loss of air was resolved and the unit was returned
.O to service.
- v
$:s '?
~
F ""
I 2
3 4
J F Forted Reason:
Method:
Exlubit G -Instructions 1'O S: St hed uled A liguipment Failure (Egbin) 14f anual for Preparation of Data ILMaintenance oi Test 2-Manua? Scram.
Entry Sheets for Licensee
( Hefuelir.g 3 Autunnatic Scram.
Event Repois (LER) File (NUREG-N D Regulatory Resirittion 44sther ( E xplain) 01611
-l i Operator Training & I + en se Examination A
I Adnunistrative 5
G Opciational i nor (l% plain).
Exhibit I - Same Source
(')/ 77 )
11 Oiher Il xplain) 1
OPERATING HISTORY July
., 1979:
0250 Hrs. -
Holding reactor pg.;er at 9?' resolving turbine control valve prcble:n.
Juiy 2, 1979:
1118 Hrs. -
Reactor scram en low water level caustd from f eedwater reg. valve lockup on loss of both plant air comprescors.
2051 Hrs. -
Co:r.menced reactor startup af ter correcting air compressor problem.
2.300 !!rs. -
Reactor critical f377, C.C.C. sequence, group 10, rod 10-23, position 26, temperature 360',
period 100 sec.
July 3, 1979:
0240 Hrs. -
Holding recctor power due to station air prob-lems.
1337 Hrs. -
Air problems resolved, increased power.
1645 Hrs.'-
Rolled main turbine.
1723 Hrs. -
flain turbine generatcr on line.
July 4, 1979:
0300 Hrs. -
Holding reactor power at 75t' for l1ain Condenser mussel cook and backwash.
1530 Urs. -
Comp'eted !'ain Condenser cleaning, increased power.
July 5, 1979:
2020 Hrs. -
Reactor power at 1005.
July 11, 1979:
0000 Hrs. -
Reduced reactor power for Turbine Step Valve Testing.
0015 !!rs. -
At 90?,' performed TSVT.
0025 Hrs. -
Completed TSVT, increased ccuer.
0105 Hrs. -
Reactor power at 100?;.
July 25, 1979:
0001 Hrs. -
Decreased reactor power for TSVT.
0027 Hrs. -
At 90;,, ccr enced TSVT.
0035 Urs -
Completed TSVT, bachwashed all condensers.
0122 Hrs. -
Completed backwash, increased reactor power.
0155 Hrs. -
Reactor po,;er at ICT
[
wIww 3
e u MuL
- 4. 0 g
.REFUtLIrG H!rG:::tt,110:; i:Ecu_r_.S_i..
1
.. -.... " ) ) p e'.". _ _
g-
,m 1.
lL:,ic o f facili ty:
2.
Stheduled cate for next.refueli :9 shutdo.;n:
Fall 1900 3.
Scheduled date for restart fall,owing refueling:
Late Fall 1980 4.
Uill refueling or resuration of operation thereafter require a technical spec': fication change or other license amend.9:ent?
Yes' Technical Specification changes regarding:
(1) lia'i:aca average planar linear heat generating rate.
(2) ikinimum critical po.ter ratio.
5.
Schoduled dete(s) for subtr.itting proposed licensii.9 act-icn and supporting' in forma tion :
/
Sumer 1980 G.
Ir.pariant licensing considerations asscciated t ith refue' ling, e.g., new or different fuel design or supolier, unrevict:cd design or performance analysis sathods, significant changes in fuel design, new opereting procedures:
20') to 250 pending reload analysis for 18 nonth operating cycle.
7.
The number of fu21 assetSiics (a) in the. core and (b) in ti;e spent fuel storage pool :
(a) In Core:
399 (b) In SFP:
8.
The present licensed spent fuel poal storaq.e capacity and the size of an.y in -
cr vu-i n l i ce r,.:d s i:.cm cc oa c i ty th a t. h e ' be'n reo "; M ' :.r i n p i a nnH in
- r. -
0... of fu.!
.ce;:,..:
2180 asse.:blies 9.
The projected tiate of the last refueling that can be discharged to the spent feel pool assu:ning the precent licensed capacity:
u.*.,, b e
Le
Docket No.
50-245 Pace 1 of 2
~
Date 790810 Unit Name Millstone i Completed By R. Young Telephone 203-447-1792 X!475 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month July DATE SYSTEM COMP 0NErfT lMINTENANCE ACTION 790516 feedwater R.F.P. Recirc. Vlvs. 1-FW-14A,B,C Replaced discs and seats 790516 Feedwater Air Operato.- 1-FW-14B Replaced piston 'O' rings 790517 L.P.C.I.
"A" L.P.C. I. Heat Exchanger Rebuilt head covers 790524 Core Spray 1-CS-5A Machined wedge guides 790524 Gas Turbine Lube Oil Filter Fabricated new cover plate 190525 Control Rod H. C. U. 18-15 Replaced seat and accumulator Drive Hyd.
790621 Reactor Bldg.
"B" Heat Exchanger Plugged one tube Closed Cooling.
Water 790528 Atmosphere 1-AC-7 4 1-AC-9 Rebuilt air actuators Control 790630 Shu tdown 1-SD-4A & 4B IMchined discs and seats Cool ing
/90531 Reactor Bldg.
"B" Heat Exchanger Plugged 6 tubes Clcsed Cooling Water 790503 Diesel Gen.
Generator Dried out microswitch
'{ 790511 4100 VAC 18 Reactor Feed Pump Breaker Cleaned end bushing j
4# 793519 rondensate 1B Co,ndensate Pump Cleaned and inspected
Docket No.
50-245 Page 2 of 2 Date 790810 Unit Name Millstone 1 Completed By R.
Youno Telephone 203-447-1792 X-475 CORRECTIVE MAINTENANCE SUfe1ARY FOR SAFETY RELATED EQUIPMENT Report Month July DATE SYSTEM COMPONENT MAINTENANCE ACTION 790525 Control Rod Scram Solenoid #118 IICU 26-03 Replaced coil Drive Hyd.
790526 L.P.C.I.
1-LP-16A Replacci Sousing 790620 Atnosphere 1-AC-8 Operator Replaced 'O' rings and seals Control 790621 Control Rod Accumulator for 50.'7 Replaced accumulator Drive liyd.
790622 Service Llater "C" Service Water Pump Installed new lower shaf t and bearings 790622 Control Rod Accumulator 10-11 Replaced accumulator Drive Ilyd.
i 790624 Shutdown Cooling 1-SD-4A flotor Moved wire inside motor 790625 Fmer9ency Service "B" E.S.W.. Pump Straightened shc.f t and replaced impeller lla ter 790702 Diesel Generator Lube Oil Pressure Annunciator Replaced with new switch 790702 Atmosphere 1-AC-9 Solenoid Cleaned and tested Control
~
790/2/
Atnosphere 1-AC-12 Operator Disassembled, cleaned operator internals, Control reassembled 790727 Feedwa ter "B" Reactor Feed Pump Disassembled, replaced mech. seal, reassembled 790/2/
Feedwater "B" Reactor Feed Pump Disc.
Repaired seat ring gasket area and installed Check' Valve new seal ring
.