05000315/LER-1979-038, Updated LER 79-038/03L-0 on 790717:engineering Review in Progress to Determine Cause of Recurring Problem of Indicated Position of Control Rods N-13 & H-6 Exceeding Tech Specs

From kanterella
(Redirected from ML19249A279)
Jump to navigation Jump to search
Updated LER 79-038/03L-0 on 790717:engineering Review in Progress to Determine Cause of Recurring Problem of Indicated Position of Control Rods N-13 & H-6 Exceeding Tech Specs
ML19249A279
Person / Time
Site: Cook 
Issue date: 08/15/1979
From: Beilman T
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317B468 List:
References
LER-79-038-03L, LER-79-38-3L, NUDOCS 7908210546
Download: ML19249A279 (2)


LER-1979-038, Updated LER 79-038/03L-0 on 790717:engineering Review in Progress to Determine Cause of Recurring Problem of Indicated Position of Control Rods N-13 & H-6 Exceeding Tech Specs
Event date:
Report date:
3151979038R00 - NRC Website

text