ML19248D705

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-440/79-05 & 50-441/79-05 on 790522-24 & Notice of Violation
ML19248D705
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/19/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19248D706 List:
References
NUDOCS 7908170235
Download: ML19248D705 (2)


See also: IR 05000440/1979005

Text

TIC

'

UNITED STATES

[p8 880 Ig

NUC:.E A R REGULATORY COMMISSI JN

09

[

') P

1 S

REGloN lil

6

j

" ~

,f

no noostvett no Ao

g

cLEN ELLYN. ILUNoIS 60137

,

  • .. *

JUN 191979

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN:

Mr. D. R. Davidson

Vice President - Engineering

P. O. Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Konklin,

G. F. Maxwell, and F. C. Hawkins of this office on May 22-24, 1979,

of activities at the Perry Nuclear Plant Project, Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-148 and No. CPPR-149

and to the discussion of our findings with Mr. M. R. Edelman and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identities areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

nonccr,.liance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this

office within thirty days of your receipt of this notice a written

statement or explanation in reply, including for each item of noncom-

pliance: (1) corrective action taken and the results achieved; (2)

corrective action to be taken to avoid further noncompliance; and

(3) the date when full compliance will be achieved.

In accordance $ .th Section 2.790 of the NRC's " Rules o' Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the NRC's Public Document Room, except as follows.

If the enclosures

790817o N

. %.

\\8&

,

?W%"

.

JUN 19 bl9

The Cleveland Electric

-2_

-

Illuminating Company

contain information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within twenty

days of your receipt of this letter, to withhold such information

from public disclosure. The application east include a full statement

of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in

the application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-440/79-05 and

No. 50-441/79-05

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio

Power Siting Commission

Mr. Daniel D. Wilt

~yL

105

'

n

s