Text
.
.
, ' *
.
R Rig
[g&
- 'o
UNITED ST ATES
l'
-
' '%
NUCLEAR REGULATORY COMMISSION
'
f^
N
E
REGION 11
o,
'
[
101 MARIE TT A sT., N W . sUlT E 3100
[
ATL ANT A, GEORGI A 30303
'b
,
i
- ....
JUN 2 51979
In Reply Refer To:
RII:EJV
50-321/79-15
Georgia Power Company
NITN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by E. J. Vallish of this office on
June 6-8, 1979, of activities authorized by NRC Construction Permit No. DPR-57
for the E. I. Hatch Nuclear Plant, Unit 1 facility, and to the discussion of
our findings held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
,
Sincerely,
- EO198
,
C. E. Murphy, Chi f
Reactor Construction and Engineering
Support Branch
190816nLj77
Q
.
.
JUN 2 51979
Georgia Power Company
-2-
'
.s
Enclosure:
Inspection Report No. 50-321/79-15
cc w/ encl:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513