ML19248D558

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-321/79-15.No Noncompliance Noted
ML19248D558
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/25/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19248D551 List:
References
NUDOCS 7908160475
Download: ML19248D558 (2)


See also: IR 05000321/1979015

Text

.

.

, ' *

.

R Rig

[g&

  • 'o

UNITED ST ATES

l'

-

' '%

NUCLEAR REGULATORY COMMISSION

'

f^

N

E

REGION 11

o,

'

[

101 MARIE TT A sT., N W . sUlT E 3100

[

ATL ANT A, GEORGI A 30303

'b

,

i

  • ....

JUN 2 51979

In Reply Refer To:

RII:EJV

50-321/79-15

Georgia Power Company

NITN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by E. J. Vallish of this office on

June 6-8, 1979, of activities authorized by NRC Construction Permit No. DPR-57

for the E. I. Hatch Nuclear Plant, Unit 1 facility, and to the discussion of

our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

,

Sincerely,

  1. EO198

,

C. E. Murphy, Chi f

Reactor Construction and Engineering

Support Branch

190816nLj77

Q

.

.

JUN 2 51979

Georgia Power Company

-2-

'

.s

Enclosure:

Inspection Report No. 50-321/79-15

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

7031Ti3