|
---|
Category:- No Document Type Applies
MONTHYEARML24262A1132024-09-18018 September 2024 TSTF-596 Rev 1 Expand the Applicability of the Surveillance Frequency Control Program (SFCP) Additional Corrections Needed ML24211A2342024-07-30030 July 2024 Email-Withholding Determination 897 Xe-100 Mechanistic Source Term Approach Topical Report ML24211A2332024-07-30030 July 2024 Withholding Determination 897 Mechanistic Source Term Approach Topical Report-signed ML24074A3502024-03-14014 March 2024 NRC-CNSC-ONR MOC FAQs March 2024 ML24107B1092024-02-29029 February 2024 NRC Staff Feedback on NEI 20-07 Draft Rev E -Revised Portion Markings (Non-Proprietary) ML23166A1032023-06-15015 June 2023 6-15-23 Certified Index to the Record (9th Cir.)(Case No. 23-852) ML23061A1442023-03-0202 March 2023 Pre-Application Engagement on Material Qualification Issues for Advanced Reactor Licensing ML23006A0342023-01-0606 January 2023 Limited English Proficiency Services - Polish ML23006A0332023-01-0606 January 2023 Limited English Proficiency Services - Portuguese ML22332A4132022-11-28028 November 2022 NRC Staff Liaison Report: Status of NRC Activities of Potential Interest to Om Standards Committee (December 2022) ML22290A1072022-10-12012 October 2022 MAP-X Portal FAQ Revision 3 ML22062A0092022-05-13013 May 2022 OEDO-22-00085/86/87 - Enclosure 1 - NRR Staff Response to Taskings in EDO DPO Appeal Decision Concerning DPO-2020-004 ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions ML21322A2882021-11-16016 November 2021 Japan Lessons Learned Archived NRC Web Page ML21244A4272021-07-28028 July 2021 FAQ 21-03 R1 ANS Guidance Following IPAWS - Final Approved ML20166A0032020-06-23023 June 2020 NRC Staff Resolution of Radics LLC Comments on Supplemental Information Draft SE ML20135H1702020-05-14014 May 2020 Public Notice of Application for Amendment to Renewed Facility Operating License ML20041C9402020-02-10010 February 2020 1983 HPPOS-288 Acceptance of Radman Topical Report (WMG-102) ML20016A3252020-01-16016 January 2020 ROP E Questions and Answers_Revised - Dec 2019 ML20006F2152020-01-0606 January 2020 Problem Identification and Resolution ML20006F2192020-01-0606 January 2020 Significance Determination Process ML20006F2172020-01-0606 January 2020 ROP Enhancement Questions and Answers - Dec 2019 ML20006F2162020-01-0606 January 2020 Radiation Protection ML20006F2122020-01-0606 January 2020 Inspection Area ML20006F2132020-01-0606 January 2020 Performance Indicators ML20006F2072020-01-0606 January 2020 Reactor Oversight Process Enhancement Assessment ML20006F2082020-01-0606 January 2020 Cross Cutting Issues ML20006F2182020-01-0606 January 2020 Security ML20006F2102020-01-0606 January 2020 Indepedent Spent Fuel Storage Installations ML20006F2092020-01-0606 January 2020 Emergency Preparedness ML19297F9732019-10-24024 October 2019 Oct 24, 2019 TR Transformation Workshop Attendees ML19290G3542019-10-16016 October 2019 2019-10-17 List of Leaks and Spills ML19246A0242019-09-19019 September 2019 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms ML19196A2402019-07-31031 July 2019 July 11, 2019 Webinar Attendees List ML19196A3022019-07-19019 July 2019 Disposition Table for NEI and EPRI Comments Draft Safety Evaluations for EPRI Depletion TRs 3002010613 and 3002010614 ML19198A3062019-07-17017 July 2019 Draft Interim Staff Guidance: Supplemental Guidance Regarding the Chromium-Coated Zirconium Alloy Fuel Cladding Accident Tolerant Fuel Concept (ATF-ISG-01) ML19218A2222019-06-27027 June 2019 List of Attendees for the Summary of June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18443-P/Np, Qualification of the Two-Dimensional Transport Code Paragon2 ML19218A1712019-06-27027 June 2019 List of Attendees for the June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Clad ML19148A3352019-05-22022 May 2019 Attendee List 2019 Materials Program ML19099A2212019-04-0808 April 2019 Draft of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19101A0282019-02-28028 February 2019 Attendees List for Westinghouse Electric Company - USNRC Partially Closed Meeting to Discuss Proprietary Information Regarding Westinghouse Encore Accident Tolerant Fuel Technology ML19196A2762019-01-31031 January 2019 Attachment 3: Proposed Changes for EPRI Utilization Report & NEI 12-16, Revision 3 ML19196A2752019-01-31031 January 2019 Attachment 2: Comments on Draft SER, Revision 2 ML19196A2742019-01-31031 January 2019 Attachment 1: Evaluation of Depletion Reactivity Decrement Bias and Uncertainty Values Using Linear Versus Quadratic Weighted Least Squares Regression Models ML18256A3192018-10-0909 October 2018 September 2018 List of Leaks and Spills at U.S. Commercial Nuclear Power Plants ML18099A0462018-08-16016 August 2018 OMB Supporting Statement for the 2018 ASME Code Case Proposed Rule ML18214A6772018-07-11011 July 2018 Enclosure 2, Regulatory Issues Task Force Public Meeting ML18180A2602018-06-29029 June 2018 NFPA 805 FAQ 10-0059 - NFPA 805 Monitoring ML18180A3192018-06-27027 June 2018 Additional NRC Staff Comments on Fpra FAQ 18-0017 - Conditional Trip Probability for Modeling Operator Discretion - 06/27/2018 2024-09-18
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Source Comment(s) NRC Staffs Disposition and Basis Anonymous ML18345A267 No action. The Public Comment comment is unrelated In nuclear energy, there are several main types of to the content of draft reactors used to create electricity. In order to create NUREG-2104.
these electricity nuclear power plants use reactors which uses the energy released from splitting atoms to create heat. This heat is used to make steam to power turbines which produce electricity. The two most commonly used reactors are the advanced boiling water reactors and the pressurized water reactors or categorized as light water reactors. Both of these light water reactors have been redesigned multiple times of over the years to improve safety and the overall efficiency. This paper will go in depth over on which reactor is better between the boiling water reactor and the pressurized water reactor.
Boiling Water Reactor (BWR)
The boiling water reactor, or BWR, was first created the 1950s, is a lot more simplified than its counterpart the pressurized water reactor, or PWR. The BWR is built with one primary circuit of water that is pumped around the core which heats the water to creates steam to power a turbine connected to a generator, creating electricity. The leftover steam is then condensed as water and is returned to the reactor to begin the process again. That was the basic model with the design improving and becoming more efficient over time. A BWR does not need certain components such as a steam generator, pressurizer, or external recirculation loops or pumps. The reactor can operate at substantially lower pressure, hence not needing a pressurizer. Without all of the extra moving part, it causes less irradiation to the system which also increases the reactors production life.
Pressurized Water Reactor (PWR) The way a pressurized water reactor works is very similar to a BWR but with slightly more steps. The PWR was also created in the 1950s but has one main difference of having two different water systems unlike a BWR having only just one. The water is heated up through the nuclear, but the water does not boil because of the second part of the reactor which is the pressurizer. This heated water then goes a steam generating system, creating steam that consecutively powers a generator creating electricity.
This is roughly the same process as BWR with one more extra step requiring more moving parts to operate. Pros/Cons and Final Decision Both the BWR
and the PWR have their pros and cons making them better in their own ways. Boiling water reactors are used more throughout the world has a total of 75 reactors mostly used the United States, Japan, and Sweden. The reason why most it is the most used reactor is from a few benefits that come along with it.
BWRs can prevent the risk of fire and investment cost plus construction times are lower than a PWR, but these advantages do not come with disadvantages.
The core of a BWR is less compact and is bigger than a PWR because it requires more control rods and uses four times more fuel elements. Pressurized water reactors are a close second in numbers, with there being a total of 49 in the world most used in Canada and India also has its pros and cons. PWRs are very stable and is easier to operate as long as there is power being provided. Plus it has a sperate loop for the water allows the water used in the reactor will not be contaminated, but still has disadvantages coming with it. As stated previously PWRs are very stable as long as power is provided, but the event of a power shortage can cause a meltdown which is why having backup power is a necessity. Also, the coolant waters must be heavily pressurized to remain a liquid at high temperatures which leads to high construction cost. Overall the final difference in the cost of electricity is very, and both have the advantages and disadvantages so it could go both ways.
Docket: NRC-2011-0272-0004 Draft comment period: 11/29/2011 - 12/31/2016