Reactor Oversight Process Enhancement Assessment
ML20006F207
Person / Time
Issue date: 01/06/2020
From: Michael Lee
Office of Nuclear Reactor Regulation
To:
Lee M, NRR, 415-1124
Shared Package
ML20006F206 List:
References
Download: ML20006F207 (1)


Text

Reactor Oversight Process Enhancement Assessment Area The NRC staffs suggested enhancements include revising a) how the agency determines when inspection findings and/or performance indicators apply to where a nuclear power plant lands in the NRCs oversight categories (called the Action Matrix); b) how White and Yellow inspection findings are labeled; and c) how the agency notifies State, tribal and local representatives about White findings.

Background

Qualitatively, a White signi"canceindicates an acceptable level of performance by the licensee, but outside the nominal risk range.

Cornerstone objectives are met with minimal reduction in safety margin Inspection Manual Chapter 0609, "Significance Determination Process" Changes Recommended by NRC Staff The NRC staff provided a Nuclear Energy Institute recommendation to the Commission for consideration.

The recommendation would reword White and Yellow inspection finding labels to better clarify the difference in those findings significance.

Re"ning How the Agency Labels Inspection Findings Modi"cation of Outreach Expectations to State and Local Of"cials If approved, the recommended minor changes to the Action Matrix would include clarifying the expectation that Column 2 performance results be communicated to State, local and tribal officials using existing relationships and protocols.

Current Guidance Proposed Guidance "State Governors" "Outreach to State, local, and Tribal Of"cials based on established protocols" Prompt Closure of Greater than Green Findings If approved, greater than green (GTG) inspection findings would be closed once nuclear power plant operators resolve the issue, complete related actions, and the NRC confirms this via follow-up inspections/reviews. This would more efficiently remove GTG inspection findings from the Action Matrix, motivating plant operators to address these issues in a timely fashion.

Ensuring that we Properly Follow-up on Performance Indicators If approved, GTG performance indicators (even if the category returns to Green) would retain their status until corrective actions have been completed and verified as adequate by the NRC. This will ensure plant operators promptly address intermittent issues.

100 0

95%

Low to Moderate Safety Signi"cance Substantial Safety Signi"cance Low Safety Signi"cance Moderate Safety Signi"cance Current Label Proposed Label High Safety Signi"cance High Safety Signi"cance The staff is considering additional ROP assessment enhancements, including:

Standardizing the process for addressing issues raised in industry communications Increasing the ROPs proactive features Assessment of Cross Cutting Issue Tools and Processes Using the Signi"cance Determination Process for Green Findings Recommendations that Require Additional Evaluation