ML19247B868
| ML19247B868 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/19/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19247B870 | List: |
| References | |
| NUDOCS 7908150450 | |
| Download: ML19247B868 (2) | |
See also: IR 05000329/1979012
Text
T10
s
e "84
UNITED STATES
n
9[g
gs
NUCLEAR REGULATORY COMP.ilSSION
[ l') #
REGloN lli
o
7. ; .
j
'
g
f
cLEN ELLvN, stuhois sois7
.gv y
JUN 191979
Docket No. a0-329
Docket No. 50-330
Consumers Pcwer Company
ATTN:
Mr. Stephen H. Howell
Vice President
1945 West Parnall Road
Jackson, MI 49201
Gentlemen:
This refers to the inspection con ucted by Messrs. P. A. Barrett,
d
K. R. Naiju, G. F. Manell and W. A. Hansen of this of fhe on
May 8-11, 1979, of activities at the Midland Nuclear Plant, Units I
and 2, authorized by NRC Construction Permits No. CPPR-81 and No.
CPPR-82 and to the discussion of our findings with you and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
daring the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative recordt,
observations, and interviews with personnel.
During this in.;pection, certein of your activities appeared to be in
noncompliance with NRC requi"ements, as described in the enclosed
Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this
office within thirty days of your receip of this notice a written
statement or explanation in reply, including for each item of
noncompliance: (1) corrective action taken and the results achieved;
(2) corrective action to be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the hPC's
Public Document Room, except as follows.
If this repcet contains
information that you or your contractors believe to be proprietary,
790815%
G76022
i
e
- UN I 8 tS?O
Consumers Power Company
-2-
y.a must apply in writing to this office, within twenty days of your
receipt of this letter, to withhold such information from public
disclosure.
The applicat'.cn must include a full statement of the
reasons for which the information is considered proprietary, and
should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
'
L'%deT<
O
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
,
of Violation
2.
IE Inspection Reports
No. 50-329/79-12 and
No. 50-330/79-12
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Locel PDR
Ronald Callen, Michigan Public
Service Commission
Dr. Wayne E. North
Myron M. Cherry, Chicago
,
G78023