05000318/LER-1979-025-03, /03L-0 on 790704:during Routine Surveillance Test, Control Element Assemblies 22 & 62 Failed to Initiate Motion Inhibit Signal.Caused by Motion Inhibit Setpoint Voltage Level Drifting from Set Actuation Level.New Setpoints M

From kanterella
(Redirected from ML19247B419)
Jump to navigation Jump to search
/03L-0 on 790704:during Routine Surveillance Test, Control Element Assemblies 22 & 62 Failed to Initiate Motion Inhibit Signal.Caused by Motion Inhibit Setpoint Voltage Level Drifting from Set Actuation Level.New Setpoints Made
ML19247B419
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/03/1979
From: Davis S, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19247B412 List:
References
LER-79-025-03L, LER-79-25-3L, NUDOCS 7908080457
Download: ML19247B419 (2)


LER-1979-025, /03L-0 on 790704:during Routine Surveillance Test, Control Element Assemblies 22 & 62 Failed to Initiate Motion Inhibit Signal.Caused by Motion Inhibit Setpoint Voltage Level Drifting from Set Actuation Level.New Setpoints Made
Event date:
Report date:
3181979025R03 - NRC Website

text