ML19247B412

From kanterella
Jump to navigation Jump to search
Forwards LER 79-025/03L-0
Date released: 09/18/2019 Download: ML19247B412


LER 79-025/03L-0 on 790704:during Routine Surveillance Test, Control Element Assemblies 22 & 62 Failed to Initiate Motion Inhibit Signal.Caused by Motion Inhibit Setpoint Voltage Level Drifting from Set Actuation Level.New Setpoints Made
ML19247B419
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/03/1979
From: Davis S, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19247B419 (2)
Forwards LER 79-025/03L-0
ML19247B410
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/03/1979
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19247B410 (1)