ML19247B306

From kanterella
Jump to navigation Jump to search

Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures
ML19247B306
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/18/2020
From: Tanya Hood
Plant Licensing Branch II
To: Maza K
Progress Energy Carolinas
Hood, T, NRR/DORL/LPL2-2, 415-1387
References
EPID L-2019-LLA-0076, RA-19-0017, RA-19-0252, RA-19-0453
Download: ML19247B306 (4)


Text

March 18, 2020 Ms. Kim Maza Vice President Shearon Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING AND ORDER IMPOSING PROCEDURES FOR DOCUMENT ACCESS TO SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION OR SAFEGUARDS INFORMATION OR SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION AND SAFEGUARDS INFORMATION (EPID L-2019-LLA-0076)

Dear Ms. Maza,

The U.S. Nuclear Regulatory Commission (NRC) has forwarded the enclosed Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information OR Safeguards Information OR Sensitive Unclassified Non-Safeguards Information and Safeguards Information, to the Office of the Federal Register for publication.

This notice relates to your application dated April 10, 2019, as supplemented by letters dated June 6, 2019 and December 20, 2019, in which you request to revise the Shearon Harris Nuclear Power Plant, Unit 1 (Harris) Technical Specifications (TSs) to include the NRC-approved topical report, ANP-10341P-A, The ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations, for the correlation associated with the fuel design transition from the high thermal performance (HTP) fuel to a fuel assembly design with characteristics similar to the GAIA fuel design. The amendment would also add Appendix J to DPC-NE-2005-P, Thermal-Hydraulic Statistical Core Design Methodology, to address the applicability of the ORFEO-GAIA critical heat flux correlation methodology to a fuel assembly design with characteristics similar to the GAIA fuel design at Harris. In addition, the TSs would be revised to add the departure from nucleate boiling ratio safety limit for a fuel assembly design with characteristics similar to the GAIA fuel design using the ORFEO-GAIA correlation methodology.

The TSs would also be revised with minor formatting editorial adjustments to the impacted pages.

If you have any questions, please contact me at 301-415-1387.

Sincerely,

/RA/

Tanya E. Hood, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

Notice of Consideration cc: Listserv

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING AND ORDER IMPOSING PROCEDURES FOR DOCUMENT ACCESS TO SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION (EPID L-2019-LLA-0076) DATED MARCH 18, 2020 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrLABAbeywickrama Resource RidsNrrPMShearonHarris Resource RidsRgn2MailCenter Resource ADAMS Accession Nos.:

ML19247B306 (Letter);

ML20071F722 (FRN)

  • via e-mail OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA OGC/NLO NAME THood BAbeywickrama KGamin DATE 03/10/2020 03/12/2020 03/17/2020 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME UShoop THood DATE 03/13/2020 03/18/2020 OFFICIAL AGENCY RECORD NOTE: SECY requires a copy of this concurrence page before they will digitally sign the FRN; attach to the SUNSI, SGI, or SUNSI-SGI FRN being emailed to Notice_Publish.Resource@nrc.gov. Please delete this text box from your document.

After publication, prepare a REGULAR repeat notice.

ENCLOSURE FEDERAL REGISTER NOTICE