Text
_.
.
j#
UNITED STATES
- g
,4
NUCLEAR REGULATORY COMM!r,sloN
'
{ h@ g ](j)y
5 t V
o
REcton a
V
H1 PARK AVENUE
KING OP PRUSSI A. PENNSYL.V ANI A 19406
4
% . . . . ., 'j
.
N3 IU
Cocket No. 50-286
Power Authority of the State of New York
Indian Point 3 Nuclear Power Plant
ATTN: Mr. J. P. Bayne
Resident Manager
P. O. Box 215
Buchanan, New York 10511
Gentlemen:
Subject:
Inspection 50-286/78-31
This refers to the inspection conducted by Mr. T. Rebelowski of this
office on November 26 to December 23, 1978, at the Indian Point Nuclear
Generating Station, Unit 3, Buchanan, New York, of activities authorized
by NRC License No. DPR-64 and to the discussions of our findings held by
Mr. Rebelowski with Mr. J. Bayne and other members of your staff periodically
during the inspection.
Areas examined during this inspection are describd in the Office of
Inspection and Enforcement Inspection Report which is enclosed w'th this
letter. Within these areas, the inspection consisted of selecti /e
examinations of procedures a"d representative recc.-ds, interviews with
personnel, and observations t . the inspector.
Based on the results of this insaction, it appears that certain of your
activities were not conducted in full ccmpliance with NRC requirements,
as set forth in the Notices of Violation, enclosed herewith as Appendices
A and 3.
These items of noncompliance have been categorized into the
levels as described in our correspondence to ycu dated Cecember 31,
1974.
These notices are sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code
of Federal Regulations.
Section 2.201 requires you to submit to tnis
office, within twenty (20) days of ycur receipt of these not. ices, a
written statement or explanation in reply including:
(1) corrective
steps which have been taken by you and the resul .s achieved; (2) corrective
steps which will be taken to avoid further items of nonccmpl1ance; and
(3) the date when full compliance will be achieved.
nic
500
L'J
7 9 08080
__
_ _ .
.
Power Authority of the State of
2
fE3 D M
'
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, Appendix
B, and the enclosed inspection report will be placed in the NRC's Public
Document Rocm.
If this report contains any information that you (or
your contractor) believe t'; be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such infonnation from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the information,
which ident.ifies the document or part sought to be withheld, and which
contains a statement of reason.i which audresses with specificity the
items which will be considered by the Commission as listed in subpara-
graph (b)(4) of Section 2.790.
The information sough * to be withheld
shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Additionally, and in accordance with Section 2.790(d) of the NRC's
" Rules of Practice," Part 2, Title 10. Code of Federal Regulations,
documentation of findings of your control and accounting procedures for
safeguarding speciai nuclear materials and your facility security pro-
cedures are e .empt from disclosure; therefore, Appendix A, will not be
placed in the Public Document Room and will receive limited distribution.
Should have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
. -7
(/
Eldon' J. Brunner, Chief
Reactor Cperations and Nuclear
Support Branch
Enclosures :
1.
Appendix A, Notice of Violation (Centains 2.790 Information)
2.
Appendix :), Notice of Violation
3.
Office of Inspection and Enforcement Inspection
Peport Number 50-286/78-31
50g
06
_ . . _
--
.
_
_.
__
__
.
.
.
Power Authority of the State of
3
FF315 IN3
cc:
George T. Berry, Executive Director (Without Appendix A)*
L. R. Bennett, Assistant General Manager - General Counsel (Without Appendix A)*
G. M. Wilverding, Licensing Supervisor (Without Appendix A)*
P. W. Lyon, Manager - Nuclear Onerations (Without Appendix A)*
A. Klausmann, Director, Quality Assurance (Without Appendix A)*
D. Halama, Site Quality Assurance Engineer (Without Appendix A)*
J. F. Davis, Chairman, Safety Review Committee (Without Appendix A)*
J. M. Makepeace, Director, Technical Engineering (Con Ed) (Without Appendix A)*
- contains 2.790 Information