Forwards IE Insp Repts 50-445/79-13 & 50-446/79-13 on 790514-31.No Noncompliance Noted
ML19247B068
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/18/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19247B069 List:
References
NUDOCS 7908070125
Download: ML19247B068 (2)


See also: IR 05000445/1979013

Text

~/[G

p n."eauq'o

g',

UNITED STATES

E 'y ) .

O,

NUCLEAR REGULATORY COMMIS510N

  • .Iyi1@9,7f)k'-[S

c

$

REGION IV

o,

611 HYAN PLAZA DRIVE, SUITE 1000

'

'

ARLINGTON, T E X AS 76012

  • ....

June 18, 1979

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 79-13

50-446/Rpt. 79-13

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This referi to the inspection activities perf omed by our Resident Inspector,

Mr. R. G. Taylor, during the period May 14-31, 1979, of activities authorized

by NRC Construction Pemit Nos. CPPR-126 and 127 for the Comanche Peak f acility,

Units No. 1 and 2, and to the discussion of our findings with Mr. R. G. Tolson

and other members of your staff during the inspection period.

Arcar, examined during the inspection and our findings are discussed in the

enclosed inspection-report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

Two new unresolved items are identified in paragraph 3 of the enclosed report.

We have also examined actions you have taken with regard to previously identified

inspection findings.

The status of these items is identified in paragraph 2 of

the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any infomation that yc 2 believe to be proprietary, it is

necessary that you submit a written apptication to this office, within 20 days

of the date of this letter, requesting that such inf omation be withheld f rom

public disclosure.

The application must include a full statement of the reasons

why it is claimed that the inf omation is prop mictary.

The application should

be prepared so that any proprietary information identified is contained in an

425

212

'7908070( 1 9

.

.

Texas Utilities Generating F mpany

-2-

June 18, 1979

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Recc.

If we do not hear from you in this

regard within the specitied period, the r(port will be placed in the Public

Document Room.

Should you have any questions concerning '.his inspection, we will be pleased to

discuss them with you.

Sincerely ,

^

W. C. Seid

Chief

Reactor Coestruction and

Engineering Support Branch

Enclosure:

lE Inspection Report No. 50-445/79-13

50-446/79-13

cc: w/ enclosure

Texas Utilities Generating Company

ATTN:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas