| Site: | Comanche Peak |
| Issue date: | 06/18/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19247B069 | List: |
| References | |
| NUDOCS 7908070125 | |
| Download: ML19247B068 (2) | |
See also: IR 05000445/1979013
Text
~/[G
p n."eauq'o
g',
UNITED STATES
E 'y ) .
O,
NUCLEAR REGULATORY COMMIS510N
- .Iyi1@9,7f)k'-[S
c
$
REGION IV
o,
611 HYAN PLAZA DRIVE, SUITE 1000
'
'
ARLINGTON, T E X AS 76012
- ....
June 18, 1979
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 79-13
50-446/Rpt. 79-13
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This referi to the inspection activities perf omed by our Resident Inspector,
Mr. R. G. Taylor, during the period May 14-31, 1979, of activities authorized
by NRC Construction Pemit Nos. CPPR-126 and 127 for the Comanche Peak f acility,
Units No. 1 and 2, and to the discussion of our findings with Mr. R. G. Tolson
and other members of your staff during the inspection period.
Arcar, examined during the inspection and our findings are discussed in the
enclosed inspection-report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance were identified.
Two new unresolved items are identified in paragraph 3 of the enclosed report.
We have also examined actions you have taken with regard to previously identified
inspection findings.
The status of these items is identified in paragraph 2 of
the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any infomation that yc 2 believe to be proprietary, it is
necessary that you submit a written apptication to this office, within 20 days
of the date of this letter, requesting that such inf omation be withheld f rom
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the inf omation is prop mictary.
The application should
be prepared so that any proprietary information identified is contained in an
425
212
'7908070( 1 9
.
.
Texas Utilities Generating F mpany
-2-
June 18, 1979
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Recc.
If we do not hear from you in this
regard within the specitied period, the r(port will be placed in the Public
Document Room.
Should you have any questions concerning '.his inspection, we will be pleased to
discuss them with you.
Sincerely ,
^
W. C. Seid
Chief
Reactor Coestruction and
Engineering Support Branch
Enclosure:
lE Inspection Report No. 50-445/79-13
50-446/79-13
cc: w/ enclosure
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201
,
917
42e)
d1J