ML19246C557
| ML19246C557 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 05/31/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mary Johnson SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML19246C558 | List: |
| References | |
| NUDOCS 7907260516 | |
| Download: ML19246C557 (2) | |
See also: IR 05000395/1979019
Text
{{#Wiki_filter:b g m asc [[e oq[o, [ UNITED STATES ,g'j NUCLEAR REGULATORY COMMISSION REGION ll '*
..~, e# 101 M ARIETT A sT., N.W., SUITE 3100 o AT LANT A, G EORGI A 30303 ' br j'
MAY 311979 In Reply Refer To: RII:EHG 50-395/79-19 South Carolina Electric and Gas Company ATTN: M. C. Johnson, Vice President Special Services and Purchasing P. O. Box 764 Columbia, SC 29218 Gentlemen: This refers to the inspection conducted by E. H. Girard of this office on May 8-11, 1979, of activities authorized by NRC Construction Permit No. CPPR-94 for the Summer 1 facility, and to the discussion of our findings held with J. F. Algar at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no items of noncompliance were disclosed. In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, copy of this letter and the enclosed Title 10, Code of Federal Regulations, a inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis (J which it is claimed that the information is proprietary, and shoulo prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, f /so Charles E. urphy, hief Reactor Construction and Engineering Support Branch Enclosure:
Inspection Report No. 50-395/79-19 4g4 ) I 7'6 0 9 6 cc w/ enc 1: i90 See Page 2
. L. .. l%Y 311979 , s South Carolina Electric and Gas Company -2- " cc w/ enc 1: T. B. Conners, Jr. Conners, Moore and Corber 1747 Pennsylvania Avenue, N. W. Washington, DC 20006 A. A. Smith Quality Assurance P. O. Box 8 Jenkinsville, SC 29065 0. S. Bradham, Manager Nuclear Operations P. O. Box 8 Jenkinsville, SC 29065 . 424 117 }}