ML19246C495
| ML19246C495 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/06/1979 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| References | |
| NUDOCS 7907250490 | |
| Download: ML19246C495 (1) | |
Text
Tfc
- ya arcg%,
UNITED STATES 8
NUCLE AR REGULATORY COMMISSION
$. y,,,O7 ')( 7.
- ' '~ ' /
5 REGION I 5 a /oM/
e, -
631 PARK AVENUE D
O KINu OF PRUSSIA, PENNSYLVANIA 19406 g
Docket No. 50-293 JUL,
Boston Edison Company M/C Nuclear ATTN:
Mr. G. Carl Andagnini, Manager Nuclear Operations Department 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
This Ir, formation Notice is provided as an early notifi ation of a possibly significant matter.
It is expected that recipients will review the information for possible applicability to their facilities.
No specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
Sincerely, d
0~
Boyce H. Grier
~ Director Enclosures.
1.
IE Information Notice No. 79-18 2.
List of IE Information Notices Issued in 1979 cc w/encls:
P. J. McGuire, Pilgrit., Station Manager A. Z. Roisman, Natural Resources Defense Council 4h) 3' 7 007250 4/10
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-18 Date:
July 6, 1979 Page 1 of 1 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14,1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear power plant would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Depcrtment of Energy (DOE), and will receive notification from them as soon as the reentrv :;r,-idor can be established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> heio're reentry actually occurs.
If it is determined that there are any licensea.iuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided es an early notification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will oe issued to recommead or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this information notice is required.
403 341 7907120397
ENCLOSURE 2 IE Information Notice No. 79-18 Date:
July 6, 1979 Page 1 of 2 LISTING 0F IE INFORMATION N0lICES ISSUED IN 1979 Information Subject Date Issued to Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (0L) or Construction Permit (CP) 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or CP 79-04 Degradation of 2/16/79 All power rcactor Engineered facilities with an Safety Features OL or CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All power reactor Safety-Related Diping facilities with an OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 Ali power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel
- cilities Air 79-09 Spill of Radioactivity 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP tn'
~l3 u,
c.
IE Information Notice No. 79-18 Date:
July 6, 1979 Page 2 of 2 LISTING 0F IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued to Notice No.
Issued 79-11 Lower Reactor Vessel Head 5/7/79 All power reactor Insulation Support Problem facilities with an OL or CP 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities, Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All power reactor Level in the Oyster facilities with an Creek Reactor OL or CP 79-14 Safety Classification of 6/11/79 All applicants for, Electrical Cable Support and holders of a Systems power reactor CP 79-15 Deficient Procedures 6/7/79 All power reactor facilities with an OL or CP 79-16 Nuclear Incident at 6/22/79 All research and Three Mile Island test reactors with an OL 79-17 Source iloider Assembly 6/20/79 All power reactor Damage from Misfit Between facilities with an Assembly and Reactor Upper OL or CP Grid Plate