Concludes That Requirements Set Forth in IE Bulletin 79-07 Re Seismic Piping Stress Reanalysis Will Be Adequately Met to Allow Resumption of Operation on Completion of Mod.Safety Evaluation Encl
ML19246C437
Person / Time
Site: Pilgrim
Issue date: 05/25/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19246C438 List:
References
NUDOCS 7907240616
Download: ML19246C437 (2)


Text

a

./,

,9

/

n naco UNITED STATE t

+

8 3 e

'i NUCLEAR REGULATORY COMMISSION r,.

WASHINGTON, D. C. 20555 May 25, 1979 Docket No. 50-293 Mr. G. Carl Andognini M/C NUCLEAR Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Andognini:

This letter is submitted in response to your letters dated May 23, and 25, 1979 which provided documentation of the results of seismic piping stress reanalysis for Pilgrim Nuclear Power Statio'n Unit No.1 in connection with IE Bulletin 79-07.

Your submittal was also in response to the staff's request for information set forth in our meeting of May 18, 1979.

On the basis that the reanalysis was conducted using computer programs employing acceptable seismic response combinati>n techniques, and the acceptable results from the reanalyses, we conclude that the requirements set forth in IE Bulletin 79-07 will be adequately satisfied to allow resumption of operation on completion of the modifications identified in Attachment B to your May 23, letter, and as-built verification o., the recirculation system and the D main steam line. As-built verification on the other steam lines and branch lines and completion of code verifications will be required before your response to IE Bulletin 79-07 is considered finally complete.

A copy of our evaluation addressing this matter is enclosed.

Sincerel,

~7 b Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors

Enclosure:

Evaluation f~

i 6)6 7 9 Ok2 4 0@

cc w/ enclosure:

See next page 362 247

Mr. G. Carl Andognini cc Mr. Paul J. McGuire Pilgrim Station Acting Manager Boscon Edison Company RFD al, Rocky Hill Road Plymouth, Massachusetts 02360 Anthony Z. Roisman Natural Resources Defense Council 91715th Street, N. W.

Washington, D. C.

20005 Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360 362 248