ML19246C300
| ML19246C300 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/24/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19246C302 | List: |
| References | |
| NUDOCS 7907240122 | |
| Download: ML19246C300 (2) | |
See also: IR 05000327/1979029
Text
Tv
.
[pR MGv 'o
UNITED STATES
E'
/ ,'n
NUCLE AR REGULATORY COMMISSION
3,.,
E
REGION 11
$
'"
o,
[
101 MARIE TT A sT., N.W., sulT E 3100
ATLANTA, GEORGI A 30303
%s
j
_ , , ,
-
In Reply Refer To:
gy g g
RII:CRM
50-327/79-29
50-328/79-16
Tennessee Valley Authority
Atta:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this
office on May 8-11, 1979 of activities authorized by NRC Constructica
Permit Nos. CPPR-72 and CPPR-73 for the Cequoyah facility, Units 1 and
2, and to the discussion of our findings held with G. G. Stack at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters. These are discussed in the enclosed inspection
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in thi.;
regard within the specified period, the report will be placed in the
Public Document Room.
363
282
Y9072got y
.
W 241979
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sina-~ 1y,
f
~}A'
Charles E. Murphi, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-327/79-29
and 50-328/79-16
cc w/ enclosures:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, Tennessee 37401
G. G. Stack, Project Manager
Post Office Box 2000
Daisy, Tenneesce 37319
,
J. M. Ballentine
Plant Superintendent
Post Office Box 2000
Daisy, Tennessee 37319
J. F. Cox
400 Comerce Street
W9D214
Knoxville, Tennessee 37401
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
363 283