ML19246B708

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-282/79-12 on 790503-04.No Noncompliance Noted
ML19246B708
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 05/16/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML19246B709 List:
References
NUDOCS 7907180369
Download: ML19246B708 (2)


See also: IR 05000282/1979012

Text

7-

TIC

j# % ,

%

4

UNITED STATES

.,%

.'t

NUCLEAR REGULATORY COMMISSION

f (f .

REGloN 111

g'

r

799 RooSEVE LT Ro A D

4,

y .

e

GLEN E LL YN. IL LINols 60137

.....

MAY 161979

Docket No. 50-282

Northern States Power Company

ATTS:

Mr. Leo Wachter

Vice President

Power Production and

System Operation

414 Nicollet Mall

Minneapolis, M'i

55401

Gentlemen:

This refers to the inspection conducted by Mr.

I. T. Yin of this

office on May 3-4,

1979, of activities at the Prairie Island Nuclear

Generating Plant, Unit 1, authorized by NRC Operating License No.

DPR-42 and to the discussion of our findings with Mr.

F. P. Tierney

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination or procedures and representative records,

observations. and interviews with personnel.

No items of noncompliance or deviations were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's

Public Document Room, except as follows.

If this report contains

information that you or your contractors believe to be proprietary,

you must apply in writing to this office, s thin twenty doys of your

receipt of this letter, to withhold such information from public

disclosure. The application must include a full statement of the

reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

3b4

ll4

0

h

q90

.

%

Northern States Power

-2-

pjy 16 1979

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

JCYb:

A

,

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-282/79-12

cc w/ enc 1:

Mr. F. P. Tierney, Jr.,

Plant Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

John W. Fernan, Ph.D.,

Nuclear Engineer, MPCA

364

115