ML19246B688

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-454/79-07 & 50-455/79-07 on 790501-03. No Noncompliance Noted
ML19246B688
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/17/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19246B689 List:
References
NUDOCS 7907180336
Download: ML19246B688 (2)


See also: IR 05000454/1979007

Text

I

TIC

'

-

g# %g

UNITED STATES

f

Ot

NUCLEAR REGULATORY COMMISSION

'

f,I l1,

REGION til

e *$

g

799 RooSE VE LT Ro AD

.

-

.4

G LE N E LLY N. ILLINOIS 60137

o

e...*

tMY 17 @7)

Docker No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. K. D. Ward of

this office on May 1-3, 1979, of activities at Byron Station

Units 1 ano 2 authorized by NRC Constructica Permits No. CPPR-130

and Fo. CTPR-131 and to the discussion of our findings with

Mr. G. Sorensen and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations,

a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such inforr.ation from public disclosure.

The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

T

n

a

7 907180' 3M

Yp

.

.

Commonwealth Edison

-2-

MAY 171379

Company

We will gladly discuss any ,te,stions you have concerning this

inspection.

Sincerely,

b

'

,4 sw

Gasr.on Fiorelli, Chief

Reactor Construction and

j

Engineering Support Branch

Enclosure:

IE Inspection Rpts

IIo . 50-454/79-07 and

No. 50-455/79-07

cc w/enti.

Gunner Sorensen, Si'e

Proj ec t Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office

of Assistant Attorney

General