ML19246B688
| ML19246B688 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 05/17/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19246B689 | List: |
| References | |
| NUDOCS 7907180336 | |
| Download: ML19246B688 (2) | |
See also: IR 05000454/1979007
Text
I
'
-
g# %g
UNITED STATES
f
Ot
NUCLEAR REGULATORY COMMISSION
'
f,I l1,
REGION til
e *$
g
799 RooSE VE LT Ro AD
.
-
.4
G LE N E LLY N. ILLINOIS 60137
o
e...*
tMY 17 @7)
Docker No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Mr. K. D. Ward of
this office on May 1-3, 1979, of activities at Byron Station
Units 1 ano 2 authorized by NRC Constructica Permits No. CPPR-130
and Fo. CTPR-131 and to the discussion of our findings with
Mr. G. Sorensen and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations,
a
copy of this letter and the enclosed inspection report will
be placed in the NRC's Public Document Room, except as follows.
If this report contains information that you or your contractors
believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to
withhold such inforr.ation from public disclosure.
The
application must include a full statement of the reasons for
which the information is considered proprietary, and should be
prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
T
n
a
7 907180' 3M
Yp
.
.
Commonwealth Edison
-2-
MAY 171379
Company
We will gladly discuss any ,te,stions you have concerning this
inspection.
Sincerely,
b
'
,4 sw
Gasr.on Fiorelli, Chief
Reactor Construction and
j
Engineering Support Branch
Enclosure:
IE Inspection Rpts
IIo . 50-454/79-07 and
No. 50-455/79-07
cc w/enti.
Gunner Sorensen, Si'e
Proj ec t Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office
of Assistant Attorney
General