Forwards IE Insp Rept 50-413/79-08 & 50-414/79-08 on 790501-04.No Noncompliance Noted
ML19246B072
Person / Time
Site: Catawba  
Issue date: 05/17/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19246B073 List:
References
NUDOCS 7907110643
Download: ML19246B072 (2)


See also: IR 05000413/1979008

Text

UNITED STATES

[y as%g\\

.

NUCLEAR REGULATORY COMMIS$10N

REGION il

2

,

g

a

101 M ARIETT A sTRE ET. N.N.

f

  • -*

$

S

ATLANTA. OEORGIA 3o3o3

'

6

%...../

GAY 171979

.'

In Reply Refer To:

RII:WPA

50-413/79-8

50-414/79-8

Duke Power Company

Atto:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on

May 1-4, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station facility,

Units 1 and 2, and to the discussion of our findings held with D. G.

Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report. These items will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withbold

such information from public disclosure. Any such application must

include a full statement of the reasons con the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

d er 65 /

4;0

a

3 14

-

7 907116 4 9'a

.

MAY 171979

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

?

V'

Charles 2. MurphW Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/79-8

and 50-414/79-8

cc w/ enclosures:

D. G. Beam, Project Manager

Post Office Box 223

Clover, South Carolina 29710

.

314

151