ML19246A859

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re Core Spray Impeller Vane Cracks.Review of Matter Will Be Completed During Future Insp
ML19246A859
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/14/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7907090098
Download: ML19246A859 (1)


Text

r/L pm "E Gg UNITED STATES g

NUCLEAR REGULATORY COMMISSION

[ ( T P-o REGloN lit 5

f 799 ROOSEVELT ROAD O

E s

GLEN ELLYN, ILLINOIS 60137

,o*

ss Jini14 57; Docket No. 50-341

~

The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your letter dated May 25, 1979, pursuant to 10 CFR 50.55(e) regarding Core Spray Impeller Vane Cracks.

We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely,

.W8k G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney

,,r; -

i '"

,) i f I '

7 9 0 7 0 9 0 'n C' 8? q) e t