Forwards PNO-79-67AT
ML19246A489
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 06/19/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Weigand D
GULF STATES UTILITIES CO.
References
NUDOCS 7907030205
Download: ML19246A489 (1)


Text

[t@ rec, u

'o UNITED STATES 8 f..,.q ti '7, NUCLEAR REGULATORY COMMISSION REGION IV 1ilIs,ti hj y/

,5 o, ' f* 4"A g

611 RY AN PLAZA DRIVE, SulTE 1000

%, ' ' ' > ~

6" ARLlNGToN, TEX AS 76012 June 19, 1979 Docket No. 50-458 50-459 Gulf States Utilities ATTN: Dr. D. G. Weigand, Geocral Manager Nuclear Projects Post Office Box 1951 Beaumont, Texas 77704 Gentle::len:

Enclosed is supplement AT to Preliminary Notification PNO-79-67, " Nuclear Incident at Three Mile Island," dated June 18, 1979.

Should you have any querc'ons regarding this review, please contact this office.

Sincerely,

[

[G W.C.Se1 Chief 1.tetor C h ruction and Engineering Support Branch

Enclosure:

PNO-79-67AT 273 261 7807 03020f

IMMEDIATE PRELIMINARY NCTIFICATION June 13, 1979 PRELIMINARY NOTIFICATION OF AN EVENT OR UNUSUAL OCCURilENCE -- PNO-79-67AT This preliminary notification provides updated information of safety or public interest sis;nificance.

Facility: Three Mile Island Unit 2 Middletown, Pennsylvania (DN-50-320)

Subiect:

h'UCLEAR INCIDENT AT TICIEE MILE ISLAND

@erational:

1.

The average coolant temperature is 155 degrees F and the highest incore thernoccuple temperature reading is 273 degrees 7.

Core cooling is beicg r:.sintained by natural circulation.

Pressure is about 350 psi with the pressurizer in solid operation.

Steam is being admitted to the :cain con-denser through the turbine bypass valve from the A Steam Generator.

2.

Reactor building water level is being ceasured daily, and is ncv 7.0 1 0.5 feet above' fic>r level.

This lower than previously reported level is due to refine =e of the measurecent technique, and does not reflect an acutal level dec; ease.

3.

Preoperational testing for the Spent Fuel Pool Tank Farm, Once-Through Steaa Generator "B" Long-Term Coolina System, the modified radwaste treatment. system (EPICOR), and the pressure / volume control sycten pro-grossed slowly during the past week due to various eperational/procuresent problems encountered.

The testing may be completed within the next two weeks.

Ecviron: catal Status:

Environnental radiatiou levels recain consistent

.tural background levels.

Airborne releases have been below Technic acciiication limits.

From June 11-17, 42 cir samples, 2 milk sa=ples, 4.egetation samples and 2 soil sniples were collected by the h~dC.

All analytical results were less than MDA. IPA air, water and milk samples collected during the week (up to June 15) showed no detectable activity frco TMI.