Text
'
{ h ('
(?e)tk prLO ja ara f
?,
UNITED STATES y f,N4//, g(,g NUCLEAR REGULATORY COMMISSION p
WASHINGTON, D. C. 20555 3.g gv a
s* w y
JUL 2 51379 MEMORANDUM FOR:
G. Lainas, Chief, Plant Systems Branch, Division of Operating Reactors FROM:
V. Panciera, Plant Systems Branch, Division of Operating Reactors
SUBJECT:
STATUS SHEETS FOR CONTRACTOR ASSISTANCE TASKS Attached are a set of sheets which gives the present status and FY 1979 completion schedules for work being performed by contractors under our technical assistance program.
Please note that the schedules for Inservice Testing and Water Hammer licensing actions are predicted upon the contractor receiving the additional funds needed to properly staff the work (Inservice Testing $60K and Water Hammer $57K). At the present time this additional money is not available. However, G. Zech has said that he would expect the additional funds to be made available within a month.
I intend to update these sheets monthly and will include the FY 1980 schedule of task completions in the September M19 issue.
By copy of this memo, I request each section leader provide me with an updated s tatus by the 23rd day cf each month.
I will then issue the complete set of status sheets by the 30th day of the month.
I will also provide each PSB task manager with a copy of the status sheets that apply to his tasks.
. Panciera Plant Systems Bran:h Division of Operating Reactors
Enclosure:
As stated n ^ 'j
- r. q L~b 7908210 W7
-2 cc w/ enclosure:
D. Eisenhut R. Vollmer
- 5. Grimes W. Gammill E. Adensam R. Ferguson V. Panciera PSB Task Managers - Individual Sheets D. Tandi G. Zech I
ELECTRICAL INSTRUMENTATICh AND CONTROL SYSTEM SUPPORT Contractor - EG&G PSB Task Manager - Paul She-i Total Number of Licensing Or eneric Actions Assigned - 72 Total ';tmber of Licensing Or Generic Actions To Be Completed
_J1G in'FY 79 - 28 Numoer Completed by Contractor - 8 PSB
-3 P.M.
Total Planned Cost - $115K Funds Expended - 1st Quarter -
2nd Quarter $31K 3rd Quarter -
4th Quarter I. Reactor Coolant System Overpressure Protection Licensing Action Completed Completed Issued By By Contractor By PSB P.M.
Surry 1 5/79C 8/79 Surry 2 5/79C 8/79 Turkey Point 3 5/79C 8/79 Turkey Point 4 5/79C 8/79 St. Lucie 5/79C 8/79 Arkansas 1 8/79 9/79 Crystal River 3 6/79C 6/79C Oconee 1 8/79 9/79 Oconee 2 8/79 9/79 Oconee 3 8/79 9/79 Three Mile Island 1 7/79 8/79 Rancho Seco 9/79 9/79
- N.S. - Not scheduled to be completed in FY 79.
- n. o emo L'
, II.
Degraded Grid Voltage Licensing Action Co:cpleted Completed Issued By Contractor By PSB By PM Beaver Valley N.S.*
Big Rock Point l' N.S.
Browns Ferry 1 N.S Browns Ferry 2 N.S.
Browns Ferry 3 N.S.
Brunswick i N.S.
Brunswick 2 N.S.
D. C. Cook i N.S.
Dresden 1 N.S.
Dresden 2 N.S.
Dresden 3 N.S.
Jame' A. FitzPatrick 8/79 9/79 Hatch 1 9/79 9/79 Indian Point 2 N.S.
Indian Point 3 N.S.
Kewaunee 1 N.S.
Lacrosse N.S.
Maine Yankee N.S.
Monticello 9/79 9/79 Oyster Creek N.S.
Palisades N.S.
Quad Zities 1 N.S.
Quad Cities 2 N.S.
Zion 1 N.S.
Zion 2 N.S.
Three Mile Island 1 N.S.
Crystal River 3 N.S.
I c'i
^'
o Lm e III. RPS Pcwer Supfly Licensing Action Compl e ted Completed Issued By Contractor By PSB By PM Browns Ferry 1 9/79 9/79 Brcwns Ferry 2 9/79 9/79 Browns Ferry 3 9/79 9/79 Brunswick i N.S.
Brunswick 2 N.S.
Cooper N.S.
Dresden 1 N.S.
Dresden 2 N.S.
Dresden 3 N.S.
Duane Arnold N.S.
Fi tzPa trick N.S.
Hatch 1 7/79 8/79 Mon ticello N.S.
Nine Mile Point N.S.
Pilgrim i N.S.
Peach Bottom 2 N.S.
Peach Bottom 3 N.S.
Quad Cities 1 N.S.
Quad Cities 2 N.S.
Verment Yankee N.S.
Big Rock Point N.S.
Lacrosse N.S.
Oyster Creak N.S.
Millstone 1 N.S.
IV. SI Block Robinson 2 9/79 g/79 Surry 1 9/79 g/79 Surry 2 9/79 g/79 Turkey Point 3 9/79 9/79
,,n Turkey Point 4 9/79 9/79 U-U V.
Inadvertent Safety Injection Licensing Action Completed Completed Issued By Contractor By PSB Sy PM Salem 7/79 8/79 VI.
Containment Isolation Big Rock Point 1 5/79C 6/79C VII.
Standby Gas Treatment Browns Ferry 1/79C 1/79C VIII.
Tech. Spec. Change St. Lucie 1 8/79 9/79 b
O.
c u. J
/
1 s) 5
ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEM SUPPORT Contractor - LLL PSB Task Manager - Paul Shemanski Total Number of Licensing Or General Actions Assigned 147 Total Number of Licensing Cr Generic Actions To Be Completed By LLL in FY 79 52 Number completed by Contractor - 12 PSB 6
P.M.
1 Total Planned Cost - $497K Funds Expended - 1st Quarter -
2..d Quarter - 156K To Date:
3rd Quarter -
4th Quarter -
I.
OverPressurization Licensing Action Complet3d Completed Issued By Contractor By PSB By PM Millstone 2 6/78C 8/78C 3/79C H. B. Robinson 6/78C 8/78C Haddam Neck 3/79C 8/79 Point Beach 1 3/79C 8/79 Point Ceach 2 3/79C 8/79 Salem 3/79C 8/79 Maine Yankee 8/79 8/79 Yankee Rcwe 8/79 8/79 Trojan 9/79 9/79 Beaver Valley 9/79 9/79 Kewaunee 8/79 9/79 San Onofre 9/79 9/79
- NS - Not schedule to be completed in FY 79.
^^'
ib,[ pO L'd
,m II.
Flooding Licensing Action Completed Completed Issued By Contractor By PSB By P.'s Surry 1 NS*
Surry 2 N.S.
San Onofre 1 N.S.
Yankee Rowe N.S.
Maine Yankee N.S.
Palisades 9/79 9/79 Indian Point 2 N.S.
Turkey Point 3 9/79 9/79 Turkey Point 4 9/79 9/79 III. Degraded Grid Voltage Haddam Neck 9/79 9/79 Ginna 9/79 9/79 Millstone 1 N.S.
Peach Bottom 2 N.S.
Peach Bottom 3 N.S.
Point Beach '
9/79 9/79 Point Beach 2 9/79 9/79 Pilgrim 1 9/79 9/79 San Onofre 1 N.S.
Prairie Island 1 N.S.
Prairie Island 2 N.S.
Robinson 2 N.S.
St. Lucie i N.S.
Turkey Point 3 N.S.
Turkey Point 4 N.S.
Surry 1 N.S.
Surry 2 N.S.
'"/
^'
ou5 III.
Degraded Grid Voltage (cont.)
~
Licensing Action Completed Completed Issued By Contractor By PSB By PM Vermont Yankee N.S.
Yankee Rowe N.S.
Salem 1 N.S.
Rancho Seco N.S.
IV.
N-1 Loop Operation Monticello 8/79 8/79 Brunswick 2 9/79 9/79 Vermont Yankee N.S.
Zion N.S.
Dresden 2 N.S.
Beaver Valley 9/79 9/79 V.
Tech Spec Change - Deletion of Reactor Trip Cn Turbine Trip Below 50% Power Prairie Island 1 1/79C 1/79C Prairie Island 2 1/79C 1/79C Beaver Valley 8/79 9/79 J. M. Farley 8/79 9/79 VI.
ECCS Electrical Analysis Prairie Island N.S.
BWR 3 - Generic N.S.
t, L
VII.
End Of Cycle Reactor Pump Trip Circuitry Licensing Action Completed Completed Issued By Contractor By PSB By PM Hatch 1 8/79 8/79 Brunswick 2 8/79 8/79 Brunswick 1 8/79 8/79 Cooper N.S.
Dresden 1 N.S.
Dresden 2 N.S.
Dresden 3 N.S.
Duane Arnold N.S.
FitzPatrick N.S.
Monticello N.S.
Nine Mile Point N.S.
Pilgrin 1 N.S.
Peach Bottom 2 N.S.
Peach Bottom 3 N.S.
Quad Cities 1 N.S.
Quad Cities 2 N.S.
Vermont Yankee N.S.
Big Rock Point N.S.
Lacrosse N.S.
Oyster Creek N.S.
lillstone 1 N.S.
VIII.
Electrical Bypass Of Safety Actuation Signals To Containment Purge Valves Point Beach 1 9/79 9/79
{ [.)
Point Beach 2 9/79 9/79 Kewaunee 9/79 9/79 Licensing Action Completed Completed Issued By Contractor By PSB By PM Brunswick 1 9/79 9/79 Brunswick 2 9/79 9/79 Ft. Calhoun 9/79 9/79 Oconee 1 9/79 9/79 Oconee 2 9/79 9/79 Oconee 3 9/79 9/79 Peach Bottom 2 9/79 9/79 Peach Bottom 3 9/79 9/79 Cook 1 9/79 9/79 Cook 2 9/79 9/79 Ginna N.S.
Turkey Point 3 N.S.
Turkey Point 4 N.S.
Big Rock N.S.
Cooper N.S.
Crystal River 3 N.S.
Browns Ferry 1 N.S.
Browns Ferry 2 N.S.
Zion 1 N.S.
Zion 2 N.S.
Quad Cities 1 N.S.
Quad Cities 2 N.S.
Farley N.S.
FitzPatrick N.S.
Hatch 1 N.S.
Calvert Cliff 1 N.S.
Calvert Cliff 2 N.S.
Haddam Neck N.S.
Dresden 2 N.S.
Dresden 3 N.S.
Indian Point 2 N.S.
., - c Indian Point 3 N.S.
g]j d
c.
Palisades N.S.
Prairie Island 1 N.S.
Browns Ferry 3 N.S.
Licensing Action Completed Completed Issued By Contractor By PSB By PM Prairie Island 2 N.S.
San Onofre 1 N.S.
Nine Mile Point N.S.
Oyster Creek N.S.
Pilgrim i N.S.
Monticello N.S.
Humboldt Bay 3 N.S.
Hatch 2 N.S.
Dresden 1 N.S.
St. Lucie 1 N.S.
Rancho Seco N.S.
Salem N.S.
Arkansas 1 N.S.
Davis Besse N.S.
Duane Arnold fl. S.
Maine Yankee N.S.
Robinson 2 N.S.
Trojan N.S.
Beavery Valley N.S.
Conn Yankee N.S.
North Anna N.S.
Surry 1 it. S.
Surry 2 N.S.
Yankee Rowe N.S.
VIII.
Alternative To Key Lock Control Of Bypass Valve Davis Besse 1 9/79 9/79 IX.
Testing Of Noise Isolation In RPS and ESFAE n
,no
- c. O Lo i Davis Besse 2 9/79 9/79 4
. X.
Single Failure Evaluation Of Reactor Coolant Flow Sensing Lines Licensing Action Completed Comple ted Issued By Contractor By PSB By PM Crystal River 3 N.S.
XI.
Tech. Spec. Changes i
Big Rock Point 8/79 9/79 XII. On Call Assistance Cable Leakage 10/78C ll/78C Tirne Ext. 091 6/79C 6/79C XIII.
Steam Line Break Protection System Beaver Valley 7/79 9/79 XIV.
Diesel Generator Status Annunciators Generic 9/79 9/79 XV.
ATWS Recirculation Pump Trip Generic 6/79C 8/79 XVI.
LPRM Monitors Gene ric 6/79C 8/79
-n
.o t.
L
STEAM GENERATOR WATERHAMMER Contractor - EG&3 PSB Task Manager - Sam MacKay Total Number of Licensing Actions Assigned To The Contractor - 22 Total Number of Licensing Actions To Be Completed By EG&G In FY 1979 17 Total Planned Cost - 100K Funds Expended - 1st Quarter -
- 2nd Quarter To Date
3rd Quarter - 62K
, 4th Quarter LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.
Beaver Valley 12/78C 1/79C 2/79C Cook 1 1/79C 1/79C 3/79C Indian Point 2 1/79C 1/79C 7/79C Salem ll/78C 1/79C Zion 1 4/79C 8/79 Zion 2 4/79C 8/79 Point Beach 1 6/79C 7/79 Point Beach 2 6/79C 7/79 Kewaunee 6/79C 7/79 Turkey Ptint 3 9/79 10/79 Turkey Point 4 9/79 10/79 Prairie Island 1 7/79 7/79 Prairie Island 2 7/79 7/79 Conn. Yankee 9/79 10/79 San Onofre 1 9/79 10/79 Ginna 9/79 10/79 Trojan 9/79 10/79 Yankee Rowe 10/79 11/79 Palisades
'11/79 12/79 Maine Yankee 11/79 12/79 Millstone 2 11/79 12/79 St. Lucie 10/79 11/79
'n
^7
. c. 3 L
J N.S. = Not scheduled to be completed by EG&G in FY 1979.
INSERVICE TESTING PROGRAM Contractor: BNL PSB Task Manager - Allan Wang Total Number of Licensing Actions Assigned To Contractor - 15 Total Number of Licensing Actions To Be Completed by BNL in FY 79 - 10 Total Planned Cost - 200K Funds Expended - 1st Quarter -
, 2nd Quarter - 83K; To Date:
3rd Quarter -
- 4th Quarter -
LICENSING ACTION COMPLETED COMPLETED I: SUED BY BY CONTRACTOR BY PSB P.M.
Arkansas 1 6/79C Cor.n. Yankee
- 8/79 Cooper
- 7/79 San Onofre 1*
8/79 Three Mile Island 1*
9/79 Kewaunee N.S.
Browns Ferry 3 8/79 Indian Point 2 N.S.
Yankee Rowe 9/79 Fit: Patrick 9/79 Browns Ferry 1 8/79 Browns Ferry 2 8/79 4
1 Pilgrim 1 N.S.
Point Beach 1 N.S.
Point Beach 2 N.S.
I s
- NS - Not scheduled to be completed by BNL in FY 1979.
/ '_' O 7,t nu
OFFSITE POWER SYSTEM STUDY
'N Contractor - ORNL PSB TASK MANAGER:
P. Shemanski TOTAL NUMBER OF GENERIC ACTIONS PLANNED FOR FY 1979 -
7 TOTAL PLANNED COST - 120K FUNDS EXPENDED - 1st Quarter
, 2nd Guarter 66K To Date:
3rd Quarter
- 4th Quarter Completed Completed Generic Reports By Contractor By PSB Task A - Evaluation of Failures 7/79 of the entire offsite power system to determine systems designs in compliance with GDC-17.
Task B - Evaluation of loss of Cancelled NA preferred offiste power systems to determine system designs in compliance with GDC-17 Task Cl Loss of offsite power survey No date set - action by NRR pending since 3/79 Task C2 Determination of maximum 12/78 C frequency decay rate Task C3 Grid sensitivity matrix 7/79 Task C4 Analytic program for 8/79 determining alert conditions Task C5 Long range dynamic calcu-4/79 C
lations Task C6 Final report 9/79
- To be issued as a NUREG report.
's e <. ;
cs
MARK I CONTAINMENT ASSESSMENT CONTRACTOR - BNL PSB TASK MANAGER - C. Grimes TOTAL NUMBER OF GENERIC ACTIONS PLANNED FOR FY 1979 - 7 TOTAL PLANNED COST - 200K FUNDS EXPENDED - 1st Quarter -
- 2nd Quarter - 107K To Date
3rd Quarter
- 4th Quarter -
Completed Completed Generic Actions By Contractor By PSB Task I 1/4 scale pool "vell tests 6/79 C Task II Condensation Oscilla-tions 7/79 Task III Pool Swell Studies 6/79 C Task IV Lcad Comparisons 6/79 C Task V Fluid-Structure inter-actions 7/79 Task VI Load Definition Report 7/79 Task VII Summary Evaluation Report 9/79
- To be issued as a NUREG report.
n ~ ?
l L.
FIRE PROTECTION PROGRAM REVIEW Contractor - BNL PSB Task Manager - Jim Knight Total Number of Licensing Actions Assigned to Contractor - 123 Total Number of Licensing Actions To Be Completed By BNL in FY 1979 - 47 Nu'mber Completed By Contractor - 28 PSB
- 27*
P.M.
- 11 Total Planned Cost - 500K Funds Expended - 1st Quarter -
, 2nd - 179K To Date:
3rd Quarter -
, 4th Quarter I.
Fire Protection SER's LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.
Beaver Valley 6/79C I&E 6/79C Big. Rock Point 3/79C 3/79C 4/79C Calvert Cliffs 1 6/79C 5/79C Calvert Cliffs 2 6/79C 5/79C Cooper 2/79C I&E 5/79C Crystal River 3 6/79C I&E Dresden 1 6/79C 5/79C titzPatrick 1/79C 1/79C Ginna 12/78C 12/78C 2/79C Indian Point 2 12/78C 12/78C 1/79C Indian Point 3 3/79C 12/78C 3/79C Lacrosse 4/79C 3/79C Monti cello 6/79C 5/79C Nine Mile Point 5/79C I&E Peach Bottom 2 4/79C 3/79C 5/79C Peach Bottom 3 4/79C 3/79C 5/79C Point Beach 1 4/79C 1/78C Point Beach 2 4/79C 1/78C l,,
c Prairie Island 1 6/79C 5/79C Prairie Island 2 6/79C 5/79C
- Includes 5 plant reviews by I&E LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.
Quad Cities 1 4/79C 3/79C Quad Cities 2 4/79C 3/79C Saint Lucie 1
-6/79-7/79 I&E San Onofre 1 1/79C 12/78C Turkey Point 3 12/78C 8/78C 3/79C Turkey Point 4 12/78C 8/72C 3/79C Yankee Rowe 3/78C 1/78C 3/79C Surry 1 7/79 Surry 2 7/79 II. Fire Protecticn Supplements Brunswick 1 4/79C Brunswick 2 4/79C Trojan
-6/79-8/79 Kewaunee
-6/79 8/79 Indian Point 3 7/79 Oyster Creek 7/79 Big Rock Point 9/79 Haddam Neck 8/79 Millstone 1 9/79 Maine Yankee 9/79 H.
B..
Robinson 8/79 Palisades N.S.
Rancho Seco N.S.
Millstone 2 N.S.
Vermont Yankee N.S.
Zion 1 N.S.
Zion 2 N.S.
Quad Cities 1 N.S.
Quad Cities 2 N.S.
Dresden 1 N.S.
San Onofre 1.
N.S.
Yankee Rowe N.S.
Duane Arnold N.S.
LICENSING ACTION COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.
Peach Bottom 2 N.S.
Turkey Point 2 N.S.
Turkey Point 3 N.S.
Point Beach 1 N.S.
Point Beach 2 N.S.
Monticello N.S.
Prairie Island 1 N.E.
Prairie Island 2 N.S.
Surry 1 N.S.
Surry 2 N.S.
Ft. Calhoun N.S.
Three Mile Island 1 N.S.
Three Mile Island 2 N.S.
FitzPatrick N.S.
Calvert Cliffs 1 N.S.
Calvert Cliffs 2 N.S.
Ginna N.S.
Lacrosse N.S.
Peach Bottom 3 N.S.
III.
Fire Protection Design Reviews Trojan
--6/79-8/79 Dresden 2 7/79 Dresden 3 7/79 Haddam Neck 8/79 Millstone 1 9/79 Maine Yankee 9/79 H. B. Robinson 8/79 Kewaunee N.S.
Indian Point 3 N.S.
Oys ter Creek N.S.
Big Rock Point N.S.
Palisades N.S.
Rancho Seco N.S.
N.S. - Not scheduled to be completed by BNL in FY 1979.
,nn 9
a ca,
_4_
LICENSING ACTION-COMPLETED COMPLETED ISSUED BY BY CONTRACTOR BY PSB P.M.
Arkansas 2 N.S.
Arkansas 1 N.S.
Indian Point 2 N.S.
Oconee 1 N.S.
Oconee 2 N.S.
Oconee 3 N.S.
Brunswick 1 N.S.
Brunswick 2 N.S.
Millstone 2 N.S.
Vermont Yankee N.S.
Zion 1 N.S.
Zion 2 N.S.
Quad Cities 1 N.S.
Quad Cities 2 N.S.
Dresden 1 N.S.
San Onofre N.S.
Yankee Rowe N.S.
Duane Arnold N.S.
Turkey Point 3 N.S.
Turkey Point 4 N.S.
Peach Bottom 2 N.S.
Peach Bottom 3 N.S.
Point Beach 1 N.S.
Point Beach 2 N.S.
Monticello N.S.
Prairie Island 1 N.S.
Prairie Islar.d 2 N.S.
Surry 1 N.S.
Surry 2 N.S.
Ft. Calhoun N.S.
Three Mile Island 1 N.S.
Three Mile Island 2 N.S.
Pilgrim 1 M.S.
<n n
U I
?,
t-N.S. = Not Scheduled to be completed by BNL i:i FY 1979
. LICENSING ACTION CCMPLETED CCMPLETED ISSUED BY SY CCNTRACTOR BY PS3
? M-FitzPatrick N.S.
Calvert Cliffs 1 N.S.
Calvert Cliffs 2 N.S.
Ginna N.S.
Lacrosse N.S.
IV.
Fire Protectior - Items Deferred To SET Yankee Rowe Haddam Neck Millstone 1 Lacrosse Dresden 1 Dresden 2 San Onofre Ginna N.S. - Not Scheduled to be completed by SNL in FY 1979.
I i