05000334/LER-1979-020-01, /01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation

From kanterella
(Redirected from ML19242D265)
Jump to navigation Jump to search
/01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation
ML19242D265
Person / Time
Site: Beaver Valley
Issue date: 08/07/1979
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19242D250 List:
References
BVPS:JAW:700, LER-79-020-01T, LER-79-20-1T, NUDOCS 7908140768
Download: ML19242D265 (1)


LER-1979-020, /01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation
Event date:
Report date:
3341979020R01 - NRC Website

text

N HC F UMM ' bts U.b. NUULk AM MtGULAlUHY COMMlWlVN J

nm.>.

LICENSEE EVENT REPORT-CONTROL BLOCK: l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI l

6 [T[Il l P l A l 3 l V l S l 1 l@l 0 l0 l-l 0 l0 l 0 l 0 l 0 l-l0 l 0 l@l4 l1 l1 l1 l 1 l@l l

l@

P S 9 LICENSEE CODE 14 IS ULENSE NUMBER 25 26 LICENSE TYPE JJ Si CATE8 CON'T EuRC I L hl 0 l. 5 l 0 l 0 l 0 l 3 [ 3 l 4 @l 0 l 7 l 2 l 4 l 7 l 9 l@l0 l8 l0 l7 l7 19 l@

o i

i 8

6J 61 DOCKET NuvFnR 63 69 EVENT DATE 14 it f:iEPORT DAT E SJ EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

['o TT1 I During performance of the baseplate inspection procedure developed to comply with IE l

g l Bulletin 79-02, an inoperable baseplate was observed.

The pipe hanger baseplate was l

ITTT1i H-208 which is on the three inch charging line near the regenerative heat exchanger in ITTTl I c ntainment. The concrete expansion anchors in the baseplate were improperly installed l l and f ailed during the pullout. test because of oversized holes.

l o s ITITl i I

o a I l

7 8 9 00 SYSTE M CAUSs

CAUSE

COMP.

VALVE CODE CODE SUSCODE COMPONENT CODE SUSCOOE SU8 CODE l Pl Cl@ y@

Z l@ l S l U l P l 0 l R l T l@ ]@ l Z l @

O 9 7

8 9

to 11 12 13 is 19 20 S E QUE NTI AL OCCURRENCE R2 PORT REVISloN LE R/RO EVENT YE A R R EPOR T NO.

COOE TYPE No.

OU,A l7 l9 l l-l l 0l 2 0l l 0l 1 lTl l-l W

_ 21 22 23 24 26 27 78 29 Ju 31 32 TAKEN A T ON ON PLANT YE 4 e4OURS S B IT E FOR1 8.

S PPLIE MAN FACT a[R lFl@!Zl@

lZl@

l Zl@

l 0l 0l 0l 0]

W@

lNl@

lZ l@

l Zj 9l 9l 9l@

33 34 3b 36 3/

40 43 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l The failure was attributed to the lack of a formal installation procedure uring the l

i o

l initial installation. The hanger has been repaired bv installine :ew' anchors. A l

i i l complete report of inspection results and repairs will be made in the response to IE l

7 l Bulletin 79-02.

l i

3 mI l

7 8 9 80 STA $

% POWER OTHER STATUS ISCOV RY DISCOVERY DESCRIPTION lCl@ lJl0l0l@l N/A l

l C l@l IE Bulletin 79-02 inspection l

i s

CO$ TENT ACTivlTY RELEASED OF RELE ASE AMOUNT OF ACTivlTY LOCATION OF RELEASE

@ ! Zl l

N/A l

l N/A l

1 6

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUV8E R TYPE D E SCRIPTION 10l010l@lZl@l N/A l

i 7

EnSONNELiN J ES P

cESCniPTiON@

Nuv8ER 10l0101@l N/A l

i 4

7908140 76c?

f LCSS OF CR O 1 AGE TO FACluTY 43 TYPE D E SCRIP TION

[_Z_J@

N/A l

i 9

7 8 9 10 60 iSSuf @l DESCRIPTION

'N/A

~ ()

l2 o

lIlllll [lIiIII I

8 9 10 68 E9 20.;

UE NAME OF PREPARER PHONT