ML19242D190

From kanterella
Jump to navigation Jump to search
Forwards Significant Deficiency 413-414/79-1
Date released: 09/13/2019 Download: ML19242D190


Significant Deficiency 79-1:during Installation of Equipment on Section of Main Control Board,Deficient Skip Weld of Wire Duct Detected.Investigation Revealed 60 Improper Welds.All Welds Will Be Repaired by 790629
ML19242D199
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 06/21/1979
From:
DUKE POWER CO.
To:
References
Download: ML19242D199 (2)
Forwards Significant Deficiency 413-414/79-1
ML19242D189
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/20/1979
From: Dail L
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242D189 (1)