ML19242C417
| ML19242C417 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/05/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19242C414 | List: |
| References | |
| NUDOCS 7908100384 | |
| Download: ML19242C417 (2) | |
See also: IR 05000413/1979004
Text
.-
.- . ~
. . - .
. - . - - . . . . . . -
-
/pm af og'o
I
UNITED STATES
E
8'
3.n r/ n
NUCLEAR REGULATORY COMMISSION
f I
REGION 11
$g g/ ,
8
o, g
101 M ARIETT A sT.. N.W., SUITE 310o
.*
ATLANT A, G EoRGI A 30303
- ..,*
In Reply Refer To:
RII:ALC
JUN 0 51979
50-413/79-4
50-414/79-4
Duke Power Company
ATTN:
L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlot
,NC 28242
Gentlemen:
This refers to the inspection conducted by A. L. Cunnginham of this office on
May 15-17, 1979, of activities authori::ed by NRC Construction Permit Nos.
CPPR-116 and CPPR-117 foi the Cecawba Nuclear Station Unit I and 2 facilities,
and to the discussion of our findings held with D. B. Blackmon at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
erclosed inspection report. Witnin these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed
herewith as Appendix A.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practi.ce," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written app'.ication within 20
days to this office to withhold such information from pi.blic disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietar/, and should be prepared
so that proprietary inforration identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
..
j')3
-
,
p
-
-
790610038p
.
.
. .
. . ---.... ..
.. -. . - - . ..
.
JUN 0 51979
'
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
A<'Y
i
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice Of Violation
2.
Inspection Report Nos. 50-413/79-4
and 50-474/79-4
cc w/ encl:
D. G. Beam, Project Manager
P. O. Box 223
Clover, S C 27910
.
.h
J .; c/
, $
..,s.
.