ML19242B579
| ML19242B579 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/07/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19242B580 | List: |
| References | |
| NUDOCS 7908090018 | |
| Download: ML19242B579 (2) | |
See also: IR 05000269/1979010
Text
h
[p* * < coq'o
UNITED STATES
8'
('g
NUCLEAR REGULATORY COMMISSION
) ,,
,
REGION ll
' - * - '
r
-/'
ki
[
[
101 MARIETT A sT., N A, sUlTE 3100
% \\/
e
AT L ANT A , G EORGI A 30303
- ....
In Reply Refer To:
Mf
M
RII:HDJ
50-269/79-10
50-270/79-10
50-287/79-10
Duke Power Company
Atta:
W. O. Parker, Jr.
Vice President, Steam Production
Post Office Box 2178
Charlotte, North Carolina 28242
Gentlemen:
This referc to the inspection conducted by H. D. Jenkins of this office
on April 2-6, 1979 of activities authorized by h3C License Nos. DPR-38,
DPR-47 and DPR-55 for the Oconee Nuclear Station facility, Units 1, 2
and 3 and Duke Power Company offices, and to the discussion of our
findings held with J. E. Smith at Oconee Nuclear Station, Seneca, South
Carolina and J. O. Barbour at the Duke Ccmpany Offices, Charlotte, North
Carolina at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. Thc.ce
iteos and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
c.,
3p
.) ()
I
l
7908090 M
.
Duke Power Company
-2-
JUN 7
1979
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprieta y, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
Z C.
&
R. C.
ewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/79-10,
50-270/79-10 and 50-287/79-10
cc w/ enclosures:
J. E. Smith, Station Manager
Post Office Box 1175
.
Seneca, South Carolina 29678