ML19242B307
| ML19242B307 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/18/1979 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| References | |
| NUDOCS 7908080039 | |
| Download: ML19242B307 (2) | |
Text
-
s
- fLREc % '
UNITED St ATES o
5 E'
., 7/' %
NUCLEAR REGULATORY COMMISSION
"/ '. E REClON11 o,,h b[o!
101 MARIETT A ST. ' W., SUITE 3100 N
AT L ANT A, GL ,GI A 30303
% ' b*
JUL 181979 In Reply Refer To:
RII:JPO 50-302 Florida Power Corporation Attn:
W. P. Stewart, Manager Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlemen:
Written responses and inforeation requested in IE Bulletin No. 79-15 shall be submitted to:
United States Nuclear Regulatory Co= mission Office of Inspection and Enforcement Washington, D.C.
20555 Attention: Director, Division of Reactor Construction Inspection with a copy to the NRC Regional Director.
Sincerely, L
~-
_ _, ~.
6,n ~ 3 p,,, James P. O'Reilly Director
-o) a' t\\D s
7 D08080,.6
G4
JUL 181979
~
Florida Power Corporation cc w/ encl:
G. P. Beatty, Jr.
Nuclear Plant Superintendent Post Office Box 1228 Crystal River, Florida 32629
/
~} f 9)c
., o -