ML19242A647
| ML19242A647 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/20/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19242A648 | List: |
| References | |
| NUDOCS 7908030311 | |
| Download: ML19242A647 (1) | |
Text
n nq h k_ b Ib, E(pen nec o
,o, UNITED STATES j
NUCLEAR REGULATORY COMMISSION
,ec
', E WASHING TON, D. C. 20555 k '.v p
JUN a 01979 MEMnRANDUM FOR:
R. Reid, Chief, Operating Reactors Branch #4, DOR FROM:
G. Lainas, Chief, Plant Systems Branch, D0R
SUBJECT:
CRYSTAL RIVER UNIT 3 - EVALUATION OF THE OVERPRESSURE MITIGATING SYSTEM - TAC 6720 In accordance with your request per TAC 6720, enclosed is the Plant Systems Branch Safety Evaluation Report pertaining to the Crystal River Unit 3, Overpressure Mitigating System. We find the licensees prcposed system acceptable, however, we reco:x:end that certain other modifications as described in our evaluation be implemented by the licensee at the next scheduled refueling shutdown.
.lw
/.Lainas, Chief G
Plant Systems Branch Division of Cperating Reactors
Contact:
P. Snemanski X-2E077
Enclosure:
Safety Evaluation Report cc w/ enclosure:
D. Eisennut B. Grimes R. Vollmer P. Check S. Weiss J. Rosenthal C. Nelson G. Zech G. Lainas D. Tandi P. Shemanski ro es '
PSB Section A JU.
i; t iR' 7908030 3I/
SAFETY EVALUATION REPCRT CRYSTAL RIVER UNIT 3 OVERPRESSURE MITIGATING SYSTEM TAC 6720 JUNE 1979 PREPARED BY PLANT SYSTEMS BRANCH DIVISION OF OPERATING REACTORS J bO' b f1
-