Discusses Current Status of Fire Protection Mods Re Gas Suppression Sys,Fire Doors & Reactor Coolant Pump as follow-up to C Reed & in Response to NRC 790413 Request
ML19242A579
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/27/1979
From: Reed C
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 7908030167
Download: ML19242A579 (3)


Text

Commonwealth Edison

. one F ast, National Ptaza _Chicar;o. Ithnois Address Reply to Post Oftce Box 767 Chicago. Ilhnois 60690 July 27, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Zion station Unitr 1 and 2 Status of Fire Protection Modificationn NRC Docket Nos. 50-295 and 50-304 References (a):

Aoril 13, 1979 letter from A.

Schwencer to Cordell Reed (b) :

June 6, 1979 letter from C.

Reed to H.

R.

Denton

Dear Mr. Denton:

Per Reference (a), Commonwealth r:dison Company was requested to provide a status report on the completion of all unfinished modifications which the NRC Staff required to imprave the level of fire protection at Zion Sta tion.

Rererence (b) indicated that on June 1, 1979 all but three of the nine m odifications listed in Table 3.1 of Reference (a) were cer-pleted.

The current status of the three remaining modifications follows:

Gas Suppression Systems (Irem 3.1.1)

The automatic Halon suppression system and the manually actuated CO2 systems have been installed.

Both have been 100% mechanically and electrically tested.

However, some concentration testing to verify the design and to fine tune the system remains.

Currently, the Halon system concentration testing is in progress.

This testing, barring no unforeseen problems, should be completed in two or three weeks.

The CO2 systems for the component cooling water pumps, the auxiliary feed pumps and the containment spray pumps have been tested, verified and placed in service.

The full con-system for the cable spreadi ng centration testing of the CO2 room and containment penetration cable vaults will be done at

~

790 580

,W, 8030g,

Commonwealth Edison NRC Docket Nos. 50-295/304 Mr. Harold R.

Denton: July 27, 1979 the first available cold shutdown outage primarily because during these tests, localized atmospheric temperatures in these areas may reach -50 F to -100 F and possibly result in a reactor trip.

In the interim, these systems which have been " puff" tested will be placed in service by August 1, 1979.

Fire Doors (I tem 3.1.141 Twenty-four (24) fire doors were to be installed as part of the required fire protection modifications.

Many of these fire doors were installed during the original plant construction, however, they were not labelled as fire doors and hence had to be replaced with labelled doors.

As References (a) and (b) indicated, the long delivery time of this specialized equipment from vendors has resulted in numerous delays in completing this modification.

Currently, fourteen (14) of these fire doors have been installed with ten (10) unlabelled doors still to be replaced.

As Reference (b) ind ica ted, Commonwealth Edison expected delivery of the remaining ten (10) doors on July 2, 1979; however, these doors were not delivered until the week of July 23, 1979.

Although the received doors are now being installed on an expedited basis, the installation will not be completed by August 1, 1979 primarily because cach unlabelled door and frame must be removed and replaced by a labelled door on a one-for-one basis to maintain required pro-tection.

However, barring no unforeseen problems, all the labelled doors should be installed by the end of August 1979.

Reactor Coolant Pump (Item 3.1.18)

As indicated in Reference (b), the Unit 2 system is complete and the Unit 1 system is projected to be completed prior to Unit 1 Cycle 5 startup.

Currently, al.1 the ecuipment necessary for th:.s modification is on site.

please address any additional questions that you might have concerning this matter to this office.

330 580

Commonwealth Edison NRC Docket Nos. 50-295/304 Mr. Harold R.

Denton: July 27, 1979 One (1) signti original and thirty-nine (39) copies of this letter are provided for your use.

Very truly yours, f;? s'< >

Cordell Reed Assistant Vice-President l '"- )

SB0 3