LIMITED DISTRIBUTION BNL-NUREG -261n INFORMAL REPORT RECOMMEilDATIONS TO THE NRC FOR THE SAFETY EVALUATION REPORT OF

~

CONNECTICUT YANKEE (HADDAM NECK) NUCLEAR PLANT I

Y 4

l T. RESTIVO, /. LETTIERI, AND R.E. HALL 4

ENGINEERING AND ADVAtlCED REACTOR SAFETY DIVISION f

6 a

a, _.

S NRC Researcn a t l

Assistance nescrt DATE PUBLISHED - FEBRUARY 1979 DE'ARTMENT OF NUCLEAR ENERGY BROOKHAVEN NATIONAL LABORATORY UPTON. NEW YORK 11973

'1 A

'hi g

Prepared for the U.S. Nuclear Regulatory Commission J

OEce of Nuclear Reactor Regulation Contract No. EY-76-C-02-0016 m..

uE

-u

.a'-

C1 /

4

  • alC

/ 4!

qgOSD2D[f$

O 9

em 4

a N ( ) T I (: l'.

Ih icport w as pr ep. ired as an an ou n t I w or L sp..nsor e d in ti., t nin d siat,s Gou rinnent Ne iibe r the l'nited St ates nor the l'ni:.-d Nates N uiIr.n 16 e:laton Co nem n.n, nmr.un, f their rin;d.ives. nor arn of t heii c onn as tor s. sul. ont r.o ton.

rnakes as,y w a rann y, ex prew or unphed

.r amune s arn h cal or their cro p! is ers.

r liabihis oi respom;h: lits for rhr at ( ur a 3.. om pli ten < ss or us< lo!nr ss of.ua n. tor nu-s us< woi4td not tien, a ppa r at us, pi r ala, t or pri n < w di, h ed.. r s e pi c v nis t ha t ie intiinee pr n a rch o 4 ned r ighrt p.

t

)

BNL..CREG-26171 INFORMAL REPORT LIMITED DISTRIBUTION Recommendations to the NRC for the Safety Evaluation Report of Connc' icut Yankee (Haddam Neck) Nuclear Plant T. Restivo, V. Lettieri and R.E. Hall Engineering and Advanced Reactor Safety Division Department of Nuclear Energy Brookhaven National Laboratory Upton,tiew York 11973 February 1979 Prepared for U.S. Nuclear Regulatory Ccmmission Washington, D.C.

20555 Under Interagency Agreement EY-76-C-02-0016 NRC FIfl No. A-3117 NRC Research and Technica' N Assistance Report

Sin,

< b,

il0TICE: This document contains preliminary information and was prepared primarily for interin use.

Since it may be subject to revision or correction and does not represent a final report, it should not be cited as reference without the expressed consent of the a

author (s).

I

TABLE OF CONTENTS Executive Summary.............................

1 1.0 Inservice Inspection..

2 2.0 Pumps........

10 3.0 Valves, Inservice Testing Program.................

16 Conclusion...............

................43 9

J: O c d. ;

i

Brookhaven National Laboratory Recommendations to the NRC for the Safety Evaluation Report of Connecticut Yankee (Haddam Neck) Nuclear Plant Inservice Inspection & Testing Program (Docket No. 50-213)

Executive Summary

~

Under contract to the Nuclear Regulatory Commission (NRC), the Reactor En-gineering Analysis Group of Brookhaven National Laboratory (BNL) has conducted a reifew of the following Connecticut Yankee Inservita Inspection and Testing Program submittals:

a.

June 29,1977 (D.C. Switzer to A. Schwencer), Inservice Inspection -

Class 1 and Class 3 Components.

b.

May 26, 1978 (D.C. Switzer to As Schwencer), Inservice Inspection -

Class 2 Components and Table IW-1, Valve Test Program.

c.

July 14,1978 (W.G. Counsil to D.L. Zieman), Inservice Pump Test Program and Valve Test Program (changes to IWV-1).

These submittals represent the Inservice Inspection Program and Inservice Pump / Valve Test Program for the 40 r, nth and 20 month periods respectively be-ginning January 1,1978.

The BNL review process culminated with the Safety Evaluation Review (SER) meeting held at the Connecticut Yankee plant en January 17,18, and 19,1978.

Attendees were personnel from the plant, NUSCO, NRC and BNL.

Mr. T.J. Restivo (consultant to BNL) and Mr. V. Lettieri (BNL) represented BNL.

The recommendations made in this report are based on evaluations which considered:

Practicality within limitations of equipment design and gecnetry, requirenents of Section XI of the 1974 Edition thru Summer of 1975 of the ASME Boiler and Pressure Vessel Code, 10CFR50.55a(g), NRC Staff Guidance Letters (November 1976 and January 1978), and topics of numerous NRC Staff /BNL briefings.

The licensee has requested that Code relief be granted for 17 Inservice Inspection itens, 11 pump test items and 50 valves.

Also that, Cold Shutdown Testing be approved for 40 other valves.

This report recommends that Code relief be granted for; 5 of the 9 Inserv-ice Inscection relief recuests renaining (following the withdrawal of 8 re-quests), 10 of the pump items and 34 of the 50 valves.

Also reconnended is that Cold Shutdown Testing be approved for all of the valves against which this request was nade.

r, } ',

/ 5 1

1.0 INSERVICE INSPECTION 1.1 Relief Request - IWB-2600 (Bl.2), IWB 2500 (B-B) a.

Lower Head Peel Segment Meridional Welds (6) b.

Lower Head Peel Segment to Disc Circumferential Weld The examination of these welds as required by IWB-2600 from inside the vessel is restricted by the locations of the adjacent incore instrumentation penetrations.

Examination of those areas accessible between the penetrations and conduits may be performed from the out-side surface to the extent practical due to radiation levels.

Code Requirement - Volumetric examination is required.

The areas shall include the longitudinal and circumferential welds in the ves-sel heads.

This includes weld metal and base metal for one plate thickness beyond 'he edge of the weld.

The examinations performed during each inspection interval shall cover at least 10 percent of the length of each longitudinal shell weld and meridional weld, and 5 percent of the length of each cir-cumferential weld and head weld.

For welds on the reactor vessel, examinations may be perfomed ac or near the end of each inspectinn interval.

Licensee Basis for Reauest - The examination of these welds as re-quired by IWB-2600 from inside the vessel is restricted by the locations of the adjacent incore instrumentation penetrations.

Ex-amination of those areas accessible between the penetrations and con-duits will be performed from the ot, side surface to the extent practical due to radiation levels.

The general area radiation levels at this location are expected to be in the 300 to 500 mr/ hour range at 3 feet from the assel with 30,000 to 50,000 dpm surface contamination.

Examinations will not be performed if the examiners must receive a whole body dose in excess of 1250 mr in order to complete any one examination. Examinations will be perfomed on 5 percent or 10 per-cent of the total length of each weld as required by the Code.

Ex-amination of these welds will be perfomed at or near the end of the ten-year inspection interval, as allowed by the Code.

Radiography cannot be utilized as an alternative examination lethod as access to both sides of the weld would be required.

Surfacc examinations would require basically the same access as ultrasonic examination and consequently, radiation levels permitting, ultrasonic examina-tion would be performed.

Evaluation - Discussions with the licensee at the SER meeting con-cluded that this item should not be considered a relief request at this time. L,)(

j$l

This inspection is planned for the April 1980 interval, and the licensees

  • intent is to satisfy the code at that time.

At present, radiation levels and accessibility problems are not accurately known, and no specific justification can be presented for not satisfying the code. A relief request will be suomitted at the time of the inspection if it is then determined that the applicable code requirements cannot be met.

1.2 Relief Request - IWB-2600 (Bl.2), IWB-2500 (B-B).

Closure Head Peel Segment to Disc Circumferential Weld The licensee has requested relief to visually examine the subject weld for leakage during hydrostatic tests in lieu of volumetric ex-aminations.

Code Reauirement - See Code Requirement, Item 1.1 Licensee Basis for Request - The closure head peel segment is com-pletely enclosed within the pattern of CRDM penetrations inside the shroud and is not accessible for examination as required by IWB-2600.

Evaluation - Discussions with the licensee at the SER meeting have led to the following agreements.

When the vessel head is removed during the February 1979 refueling outage, the licensee will de-termine more specifically what problems if any are presented that prevent satisfying the Code.

At that time, the licensee will provide a more definitive position concerning these welds.

Until such time that this informaticn is reviewed and evaluated, it is recommended that the request for relief from the Code requirement be denied.

1.3 Relief Reauest - IWB-2600 (B2.2), IWB-2500 (B-0).

Pressurizer -

Nozzle to Vessel Welds (6)

The geometric configuration of the weld surface prevents ultrasonic examinations being performed as required by IWB-2600.

Surface ex-aminations will be performed on this weld in lieu of volumetric ex-amination.

Evaluation - The licensees' May 26, 1978 response letter to the Q-1 has celeted Hote 6 from the " Code Relief Request" column, and states that " Item B2.2, Category B-D, pressurizer nozzle to vessel weids are in accordance with Coda requirements."

1.4 Relief Request - Table IWB-2600 (B3.3) and Table IWB-2500 IB-F).

Steam Generators (Primary Side) Nozzle to Safe End Welds.

Volumetric examinations will be performed to the extent practical.

Code Requirement - The volumetric examinations performed during each inspection interval shall cover the circumference of 100 percent of the welds.

L

.a0 J j U'

/"U -

The areas shall include dissimilar metal welds (e.g., safe-end welds) between combinations of carbon, low allow, or high tensile steels and stainless steels, nickel-chromium-iron alloys, nickel-copper allcys.

This shall include the base material for, at least, one wall thickness beyond the edge of weld.

Licensee Basis for Request - The geometric configuration and surface condition of the steam generator safe end to pipe weld prevents ultrasonic examinations beir,g performed to the extent required by IWB-2600.

Examinations will be performed to the extent practical.

Evaluation - The licensee has agreed to review tae subject weld item, and determine by percentage, the weld volume to be examined ultrasonically, and determine the percentage of weld to be surface examined. Supporting reasons for these limitations will also be presented.

Until this information is received and reviewed, it is recommended that the relief request be denied at this time.

1.5 Relief Request - Table IWB-2600 (B3.2) and Table IWB-2500 (B-D).

Regenerative Heat Exchanger Nozzle to Vessel Welds.

See Relief Request, Item 1.3 Evaluation - See Evaluation, Item 1.3 1.6 Relief Request - IWB-2600 (B3.7, IWB-2500 (B-H).

Regenerative Heat Exchanger Integrally Valded Supports.

Volumetric examinations cannot be accomplished to the extent re-quired by IWB-2600.

Code Requirement - In the case of vessel support skirt, the volu-metric examination perfomed during each inspection interval shall cover at least 10 percent of the circumference of the weld to the vessel.

In the case of support lug attachments,100 percent of the welding to the vessel shall be examined.

The areas shall include the integrally-welded support attachment (e.g., support skirts).

This includes the welds to the vessel and the base metal beneath the weld zone and along the support attach-ment member for a distance of two support thicknesses.

Integral support pads on nozzles are excluded.

Licensee Basis for Request - The integrally welded supports are at-tacned by fillet welos.

The configurations of such welds is such that examinations cannot be performed to the extent required by IWB-2600 and only the base material of the comoonent wall can be ex-amined by ultrasonic techniques.

Surface examination will be per-formed on integrally welded attachments to supplement the volumetric examination. b}L

.j

Evaluation - The licensee has satisfactorily demonstrated that the configuration of these welds make it impossible to perform volu-metric examinations to the extent required by the code.

In that ultrasonic exams are accomplished where practical and 100 percent surface exams (penetrant) are also accomplished, it is recommended that relief be granted.

1.7 Relief Recuest - Table IWB-2600 (B4.1), Table IWB-2500 (B-F).

Pip-ing Pressure Boundary - Safe End to Pipe Welds.

Volumetric examinations cannat be accomplished to the extent re-quired by IWB-2600.

Code Requirement - See Code Requirement, Item 1.4.

Licensee Basis for Reauest - The examination is limited by the noz-zie 2nd safe end geometry and surface condition, and the surface condition of the weld.

The surface on the pipe side of the weld, which is a cast elbow, is machined for a distance of approximately 3 inches from the edge of the weld.

Ultrasonic examination is limited to this distance frcm the edge of the weld.

Evaluation - The licensee has agreed to review the subject weld item, and determine by percentage the volume of weld to be ultra-sonically examined, and detemine the percentage of weld to be sur-face examined.

The licensee will also present reasons to justify the limited examinations proposed. Until this informatico is re-ceived and reviewed, it is recommended that the relief request be denied at this time.

1.8 Relief Reauest - Table IWB-2600 (4.5), Table IWB-25C0 (B-J ).

Piping Pressure Bcundary - Circumferential and Longitudinal Pipe Weld.

It is not known at this time whether there are any welds in this item / category which the licensee intends to examine in this appli-cable inspection period that require a code relief request.

The licensee will review the welds planned for this period and determine if there are any welds that chnnot be examined to code.

A relief request will be initiated with a detemination made of the percent-age of weld to be volumetrically examined and percentage of weld to be surface examined to supplement the volumetric.

If this inspection period does not involve any welds in this category which require code relief, the relief requer.t will be wi thdrawn.

1.9 Relief Request - Table IWB-2600 (B4.6), Table IWB-2500 (B-J).

Brancn P1pe Connection Welds Exceeding 6" Diameter.

The licensee has requested relief frca volumetric examinations to the extent required by IWB-2600.

Code Requirement - See Code Requirement, Item 1.8. qgg slb Lad

Licensee Basis for Request - The geometric configuration of the weld surface prevent ultrasonic examinations from being performed to the extent required by IWB-2600.

Examinations will be perfomed to the extent practical from the pipe and nozzle surfaces adjacent to the wel d.

Surface examination of the weld will be performed to supple-ment the volumetric examination.

Evaluation, - The licensee has agreed to review the subject weld item, ano determine by percentage the weld volume to be examined ultrasonically, and determine the percentage of weld to be surface examined.

Supporting reasons for these limitations will also be presented.

Until this information is received and reviewed, it is recommended that the relief request be denied at this time.

1 10 Relief Reauest - IWB-2600 (B4.9), IWB-2500 (B-K-1).

Piping Pressure Boundary - Integrally Welded Supports.

The licensee has requested relief from volumetric examinations to the Gxtent required by the code.

Code Reauirement - The volumetric examinations performed during each inspection interval shall cover 25 percent of the integrally-welded supports.

The areas shall include the integrally-welded external support at-tachments. This incit. des the welds to the pressure-retaining bound-ary and the base metal beneath the weld zone and along the support attachment member for a distance of two support thicknesses.

Licensee Basis for Request - The integrally welded supports are attached by fillet welds.

The configurations of such welds is such that ^xaminations cannot be performed to the extent required by IWB-2*00 and only the base material of the component wall can be ex-amined by ultrasonic techniques.

Surface examination will be per-fomed on integrally welded attachmenN to supplement t9e voluemtric examination.

Evaiuation - The licensee hc.3 satisfactorily demonstrated that the configuration of these welds make it impossible to perform volu-metric examinations to the extent required by the code.

In that ultrasonic exans are accomplished where practical and 100 percent surface exams (penetrant) is also accomplished, it is recommended that relief be granted.

1.11 Relief Request - IWB-2600 (B5.2), IWB-2500 (B-G-1).

Reactor Coolant Pumps - Pressure Retaining Bolting (when removed).

This relief request will be withdrawn.

The licensee tests the sub-ject bolts in-place to IWB-2600 (B5.1).

1.12 Relief Request - IWB-2600 (B5.6), IWB-2500 (B-L-1).

Reactor Coolant Pumps - Pump Casting Welds. c1 -

') r 3 JIC ui

This relief request will be withdrawn et this time.

The licensee has stated that, " Volumetric examinations as required by IWB-2600 will be attempted utilizing radiographic techniques.

The success of these examinations will be dependent upon the availability of high energy gamma sources and the level of background radiation.

Inter-nal fittings in the pump may also restrict the extent of examina-tions performed." Any request for relief will be made if required at the time the proposed exams are attempted.

1.13 Relief Reauest - IWB-2600 (B6.2), IWB-2500 (B-G-1).

Valve Pressure Boundary - Prassure Retaining Bolting.

This relief request will be withdrawn.

The licensee tests the sub-ject bolts in-place to IWB-2600 (B6.3).

1.14 Relief Request - IWC-2600 (C1.2), IWC-2E20 (C-B).

Residual Heat Ex-changers - Nozzle to Vessel Welds.

The licensee has requested that surface examinations be conducted on the nozzle to channel weld in lieu of volumetric examination.

Code Requirement - The volumetric examination shall cover 100 per-cent of the nozzle-to-vessel attachment welds.

Licensee Basis for Recuest - The reinforcing collar on the nozzle to channel weld precludes volumetric examination.

A surface examina-tion of these welds will be conducted.

Evaluation - The heat welded exchangers head precludes access and

.olumetric exam from within.

The weld config, ration described also precludes volumetric exam from outside. therefore, it is dgreed that surface testing is the only practical alternative.

It is recom-mended that code relief be granted.

1.15 Relief Request - The relief requests against the follcwing items /

categories have been withdrawn by the licensee.

There are no exams scheduled for the inspection period covered by this submittal where relief requests are required.

Item Category System C2.1 C-F Residual Heat Removal C2.2 C-F Residual Heat Removal C2.3 C-F Residual Heat Removal C2.1 C-F Chenical and Volume Control C2.2 C-F Chemical and Volume Control C2.3 C-F Chemical and Volume Control C2.1 C-G Main Steam C2.2 C-G Main Steam C2.3 C-G Main Steam C2.1 C-G Feedwater C2.2 C-G Feedwater Ct.3 C-G Feedwater Nbb

!N 1.16 General 1.16.1 Relief Request - The licensee requests that calibration blocks be made to the requirements of Article T-434.1 in Winter 1976 Addenda of Section V in lieu of I-3121 of Section XI.

Licensee Basis for Request - The reason this alternative is re-quested is that the Code requires that calibration blocks for the examination of welds in ferritic vessels 2-1/2 inches thick and greater be fabricated from material taken from the component nozzle drop out or material from the component prolongation.

As a third alternative, when it is not possible to fabricate the block from material taken from the component, the block may be fabricated from a material of a specification included in the applicable examini. tion volumes of the component.

It is required that the acoustic velocity and attenuation of such a block be demonstrated to f all within the range of straight beam longitudinal wave velocity and attenuation found in the unciad components.

For the components in Connecticut Yankee particularly, the pres-surizer and steam generators, it will be impossible to meet the re-quirements of alternatives 1 or 2.

Materials of the specification are readily available, but Jecause all the components involved are clad on the inr.er surface, it would be impossible to obtain a com-parison of sound beam velocities and attenuations in the unclad com-ponent.

Evaluation - Since there is no material available from a drop out or component prolongation, the licensee has ccmmitted to fabricate the calibration block from a material of the same specification, product fom and heat treatment as one of the materials being joined.

This is in accordance with T-434.1.1 of the Winter 1976 Addenda of Sec-tion V.

We agree that the requirement of I-3121 that requires the acoustic velocity and attenuation of the block to be demonstrated to fall within the ranges found in the unclad components is impractical since these components are clad.

In that this is so, and that the licensee ultrasonically scans the subject nozzles from the unclad side, it is recommended that relief be granted as requested.

1.16.2 Relief Recuest - The licensee requests to use Appendix III of Sec-tion XI in lieu of Article 5 of Section V as a guideline for pip-ing weld inspection.

Licensee Basis for Recuest - This alternative is requested becwse the Code provides no other guideline for the inservice examination of piping welds. 7 d'J L)6 3

Evaluation - IWA-2232 of Section X states that where Appendix I is not applicable, the provisions of Article 5 of Section V shall apply regarding ultrasonic examinations. Appendix 111 of Section XI, Winter 1975 Addenda, provides rules for ultrasor.ic examination of ferritic steels and Supplement 7 provides additional guidance for examination of austenitic welds.

Therefore, it is recommended that the use of either Article 5 or Appendix III be accepted.

_9

,).

L}n li

2.0 PUMPS 2.1 Relief Reauest - Charging Pumps P-18-1A, and P-18-1B The licensee has requested relief from directly measuring inlet pres-sure for each pump during tests.

Code Requirement - Pump inlet pressure measurement is required per Table IWP-3100-1.

Licensee Basis for Request - Instrumentation for direct measurement of pump inlet pressures is not available.

It is proposed to use the static pressure of the volume control tank (head and ullage pressure) as the inlet pressure reference when checking the operations of the pumps monthly.

Evaluation - The plumbing from the VCT to the charging pump inlets is a fixed resistance system:

Based on this, the licensee's plan to de-termine and reference the VCT pressure and head to establish pump in-let differences (used to compare outlet pressure readings) is con-sidered an acceptable alternative.

It is recommended that relief be granted from the code requirement to measure inlet pressure.

2.2 Relief Reauest - Residual Heat Remova' Pumps P-14-1A and P-14-1B.

The licensee has requested relief from measuring flowrate during the monthly tests and from direct measurement of pump inlet pressure.

Code Reauirement -

a.

Table IWP-3100-1 requires that flowrate be measured when testing pumps that operate in a variable hydraulic resistance systems.

b.

Table IWP-3100-1 requires that inlet pressure P1 be measured during pump tests.

Licensee Basis for Recuest -

a.

The RHR punps are run on recirculation monthly per tech, spec.

4.3.

In this mode, fiow is restricted by a 3/4 inch recirculation line, and is therefore meaningless.

Flowrate measurements will be made d ring cold shutdcwns when the RHR system is in normal oper-a ti on.

b.

Instrumentation is not installed which will pennit the measuring of inlet pressure for these pumps.

It is proposed to use the static head of the RWST tank a; the inlet pressure reference.

9'=

r1/ ^;C

Evaluation -

a.

The RHR systems design precludes operating the pumps in any other mode but the recirculation mode while the plant is in normal opera-tion.

The recirculation circuit is a fixed resistance circuit, and as such would not require flow measurement for pump performance evaluation. However, the recirculation circuit is only sized to ficw

< 1 percent of the RHR system's design rated flow (E000 GPM per pump).

This low flow is not considered valid for evaluating the hydraulic performance of a centrifugal pump.

This monthly recircula-tion test with aither code required parameters recorded or deter-mined, would serve as an operability test.

The testing proposed at cold shutdowns with design flowrates and code required parameters (less direct measured inlet pressure), would be a valid hydraulic performance test for the pumps.

In that the RHR system is not designed with the capability to record all code requireo parameters during monthly tests, and that the licensee has proposed monthly operability tests and design flow hydraulic perfomance tests at cold shutdowns, it is reccmmended that relief be granted from the ode requirement to measure flowrate mon-thl y,

b.

The plumbing frcm the RWST to the RHR pump inlets is a fixed resistance system.

Based an this, the licensee's plan to determine and reference the RWST to pump inlet static head to establish inlet differences (used to compare outlet pressure readings) is considered an acceptable al ternative.

It is recommended that relief be aranted from the code requirement to measure inlet pressure.

2.3 Relief Reouest - High Pressure Safety Injection Pumps P-15-1A and P-15-1B.

The licensee has requeste d relief frcm measuring flowrate during the monthly tests, from direct measurement of pump inlet pressure, and from measuring bearing temperature T -

b Code Requirement -

a.

Table IWP-3100-1 requires that flowrate be measured when testing pumps that Operate in a variable hydraulic resistance system.

b.

Table IWP-3100-1 requires that pump inlet pressure P1 be measured during pump tests.

c.

The bearing temperature of all centrifugal pump bearings, and main sha#t bearings of reciprocating pumps shall be measured at points selected to be responsive to changes in the temperature of the bearing.

c3 f

. JIC ts0

Licensee Basis for Request -

a.

The HPS1 system does not have instrumentation for measuring flowrates as required by IWP-3100, b.

Instrumentation is not installed which will permit the measuring inlet pressure for these pumps.

It is oroposed to use tae static head of the RWST tank as the inlet pressure reference.

c.

Punp bearing temperature cannot be measured on those pumps since the bearings are located deep inside the pump casing and are sur-rounded by the oil resevoir.

There are no design provisions for directly measuring pump bearing temperature.

Hand held pyrometers in contact with surface of the pump casing results in questionable data.

Evaluation -

a.

The HPSI pumps are run monthly on recirculation. This recircula-tion flow is approximately 60 percent of the design flow.

In that the pump recirculation path is a fixed hydraulic resistance system from/to the RWST, flow measurement is not required by code.

The monthly 60 pe, ;ent design flow tests, and a planned 100 percent flow test at the 19e0 refueling interval (revealed at the SER meeting) are believed sufficient tc satisfy the code requirement.

Therefore, a request for code relief is not required in this case.

b.

The plumbing from the RWST to the HPSI pump inlets i

ed re-sistance systen.

Based an this, the licensee's plan to = cmine and reference the RWST to p imp inlet static head, to establis, i"t dif-ferences (used to ccmpar ? outlet pressure readings) is considered an acceptable alternative.

It is recommended that relief be granted from the code requirement to neasure inlet pressures.

c.

It is agreed that measurement of pump bearing temperature on these pumps is considered inpractical based on their design.

A monthly check on the lubrication level and vibration tests are acccm-plished per code.

Based on this, it is recommended that relief frcm code requirement to meast.re Tb be granted.

2.4 Relief Request - Service Water Pumps P-?7-1A,1B,1C, and 1D.

The licensee has requested relief from directly measuring inlet pres-sure at each pump during tests.

Code Recuirement - Pump inlet pressure measurement is required per Table IWP-3100-1.

Licensee Basis for Recuest - Instrumentation for direct measurement of pump inlet pressure is not available.

It is proposed to establish inlet pressure references during the tests by referencing the head q.;7 from the level of the river to the pump suction.

S 'i t

'c' Evaluation - The licensee has stated that the path from the river '.a the pumps is a fixed hydraulic resistance system.

Referencing the river water level with respect to the pamp inlets is therefore con-sidered an acceptab'.e alternative to direct measuring of pump inlet pressure.

2.5 Relief Request - Auxiliary Steam Generator Feedwater (Steam Driven)

P-32-1A, and P-32-10.

.The licensee has requested relief frcm measuring flowrate during monthly pump tests.

Code Requirement - Table IWP-3100-1 requires that flowrate be measured when testing pumps that operate in a variable hydraulic re-sistance system.

Licensee Basis for_ Recuest - The auxiliary steam generator feedwater pumps (steam criven) recirculation test circuit does not contain flow i ns trumentation.

Flowrate is detemined along with the other code required parameters during refueling cutages when a special test setup allows level changes in the demineralized water storage tank to be measured and timed.

Evaluation - The ASGF system's design is such that during nomal plant operation, the pumps can only be operated on recirculation ficw from the DWST.

The recirculation circuit flow is approximately 50 GPM (approximately 10 percent of the ASGF pump's design flow). This low a flowrate is not considered valid for evaluating the hycraulic perfomance of a centrifugal pump.

The monthly tests with the other parameters recorded would serve as operability tests.

The testing proposed at refuelings with design condition flowrates (determined) and other code parameters measured, would be a valid hydraulic perfemance test for the pumps.

In that the ASGF system is not designed with the capability to measure flow during the monthly tests, and that the licensee has proposed monthly operability tests, and design flow hydraulic performance tests at refuelings, it is recommended that relief be granted frcm the code requirement to measure flowrate monthly.

2.6 Relief Reauest - Low Pressure Safety Injection Pumps P-92-A and P-9P-B.

The licensee has requested relief from the following code require-ments; a.

Directly measuring pump inlet pressure.

b.

Measuring ficwrate during monthly tests.

c.

Measuring bearing temperatures.

Code Recuirement -

a.

Table IWP-3100-1 reouires that ficwrate be measured when testing pumps that operate in a variable hydraulic resistance system.

5 ) /,

' ") b -

u

b.

Table IWP-3100-1 requires !. hat inlet pressure be measured during pump tests.

c.

The bearing temperature of all centrifugal pump bearings, and main shaft bearings of reciprocating pumps shall be measured at points selected to be responsive to changes in the temper ature of the bearing.

Licensee Basis for Recuest -

a.

The LPSI system is not designed with provisions for measuring flowrate during monthly pump tests.

b.

The LPSI system is not designed with provisions for mersuring pump inlet pressure.

It is planned to use the static head pressure of the RWST as the inlet pressure reference for the LPSI pumps.

c.

Pump bearing temperature cannot be measured on this pump since the bearings are located deep inside the pump casing and are sur-rounded by the oil reservoir.

There are no designed provisions installed for directly measuring pump bearing temperatures.

Hand held pyrometers 11 contact with surface of the pump casing results in questionable data.

Running the pumps for prolonged periods to obtain stabilized tem-perature data is believed detrime7tal because the pum;3s are run at icw flow (<10 percent of design) in the recirculation mode.

Evaluation -

a.

The LPSI systems design precludes operating the pumps in any other mode but the recirculation mode while the plant is in normal operation. The recirculation circuit is a fixed resistance circuit, and as such would not require flow measurement for pump performance eval ua ti on.

However, the recirculation circuit is only sized to pass

< 10 percent of the LPSI system's design rated flow (5000 GPM per pump).

This low flow is not considered valid for evaluating the hydraulic performance of a centrifugal pump.

Thi s monthly recircula-tion test with other code required parameters recorded or determined would serve as an operability test.

The licensee is presently proposing to run design flow hydraulic performance tests on the pumps at the 1980 refueling interval, and approximately every 5 years following.

The proposed frequency of the performance tests is questionable, and should be further reviewed by the staff.

Until this is accomplished, it is recommended that the request for relief be denied at this time, b.

The plumbing frcm the RWST to the LPSI pump inlets in a fixed re-si stance system.

Based on this, the licensee's plan to deternine and reference the RWST to pump inlet static head to establish inlet dif-ferences (used to compare outlet pressure readings) is considered an acceptable alternative. r3 naC

It is recommended that relief be granted from the code requ'ieement to measure inlet pressure.

c.

It is agreed that of pump bearing temperature on these pumps is considered impractical based on their design.

A monthly check on the lubrication level and vibration tests are accomplished per code.

Based on this, it is reccmaended that relief fron code requirement to measure Tb be granted.

L,1

~ ' [-

i

,is,

_g_

3.0 VALVES, IhSERVICE TESTI!1G PROGRAM

3.1 General

The scope of this review is limited to those valves which perform a safety related function.

Safety related valves, for the purpose of IST, have been defined as those valves that are necessary to function to safely shutdown the plant and/or mitigate the con-sequences of an accident.

As a minimum, all valves that receive a containment isolation signal or a safety injection signal shall be included in the IST program.

The following guidelines were developed after review of some initial IST programs.

3.1.1

_ Leak Testing of Valves which Perform a Pressure Isolation Function There are several safety systems connected to the reactor coolant pressure boundary that have design pressures that are below the re-actor coolant system operating pressure.

There are redundant i sola-tion valves forming the interface between these hig'n and low pres-sure systems to prevent the low pressure systems from being sub-jected to pressures which excee.:s their design limi ts.

In thi s role the valves are performing a pressure i solation function.

The staff considers that the redundant i solation provided by these valves rgarding their pressure isolation function is important.

Therefo e, it is necest.ary to provide assurance tha-the condition of each of these valves is adequate to maintain this redundant i solation and system integrity.

For this reason it is believed that some methods, such as leak testing, should be used to assurc their condition is sufficient to maintain this pressure isolation func-ti o n.

In the event that leak tes'.ing is selected as the appropriate pro-cedure for reaching this >Ljective the staff believes that the follovn ng valves should be categorized as A or AC and leak tested in accordance with IWV-3420 of Section XI of the applicable edition of the ASiE Code.

These valves are:

SI-MOV-861A, 861B, 861C, 861D (Safety Injection)

SI-CV-862A. 8628, 862C, 8620 (Safety Injection)

SI-V-863A, 8633, 863C, 863D bafety Injection)

CD-MOV-871A, 871B (Safety Injection)

FH-MOV-578, 535, 522, 508 (Loop Fill)

FH-MOV-562, 507, 521, 534, 544, 310 (Loop Drain)

RH-MOV-803, 804, 780, 781 (RHR)

FH-CV-296 (Loop Fil1)

FH-

-502, 516, 521, 534, 5?5 (Loop Drain) 516 i' f) i

We have discussed this matter and identified the valves listed above to the licensee.

The licensee has agreed to consider leak testing these valves in accordance with IWV-3420 of the applicable edition of the ASME Code and to categorize these valves with the appropriate designation.

If the licensee determines that leak testing is not necessary because there are other me e ds that the licensee has and o

will use to determine each valve's condition, the licensee will provide to the NRC for evaluation on a valve-by-valve basis the de-tails of the method used that clearly demonstrates the condition of each valve.

3.1.2 Containment Isolation Valves The Appendix J review for this plant is a completely separate review from this IST program review.

However, the determinations made by that review are airectly applicable to the IST program.

The present IST submittal should be acceptable until the Apnendix J review is completed.

At that time, the licensee will be required to amend his IST program to reflect the conclusions of the Appendix J review.

3.1.3 Category A Valve Leak Chee.., reouirements The staff's present position is that all Category "A" valves shall be leak tested to Section XI requirements.

The leak test re-quirements and exceptions for Category A valves are explicitly stated in ASME Section XI.

In principle 10 CFR 50.55 a(g) is sepa-rate and different from the requirements of other valve testing re-quirements in the CFR such as Appendix J.

The test requirements of 10 CFR 50.55 a(g) are to establish cperational readiness at system function dif ferential pressure.

In general:

a.

F Category A valves which communicate only with the con-t<inment atmosphere, i.e. containment purge, hydrogen purge, Ap-pendix J leak testing results are sufficient for Section XI re-qui reme nts.

b.

For Category A valves which communicate with the primary coolant system, the licensee must perform the leak test at system func-tion di fferential pressure.

Relief to test at system function differential pressure are specified in Section XI and in those cases tests at lower pressure, such as those established for Ap-pendix J requirements, are acceptable provided the licensee can satisfy sub-paragraph IWV-3420 C5 of Section XI.

c.

Those valves that perform both a pressure isolation and con-tainment isolation function shall be leak tested to meet Section XI of the applicable edition of the ASME Code in additica to Ap-pendix J of 10 CFR 50 requirements.

3.1.4 Valve Exercising Requirements The ASME Code r-"mments for valve exercise tests for category A, B, and C valve 4 certain deviations fece the prescribed 3 month period if it i practical" to exercise the valves during plant

'L, j {

<6,

" ~

operation.

It is the flRC staff positior, that these deviations must be rmiewed in order to insure that proper and consistant criteria are

.d to detemine impracticality (i.e., where the failure of a valve in the test position would decrease ttle availability of a safety system).

Accordingly, while there is no relief requested in these cases, a basis for the deviation and an evaluation will be included in this review, to document the criteria used to detemine impracticality. When a valve is not exercised at 3 month intervals, it must se exercised at cold shutdowns unless relief is granted. A guideline used by the staff to define the duration of a cold shut-down during which valve testing is required is as follows:

Valve testing should commence not later than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after shut-down, and continue until complete or plant is ready to return to power. Completion of all valve testing is not a prerequisite to re-turn to power. Any testing not completed at one cold shutdown should be performed during subsequent cold shutdowns to meet the Code specified testing frequency.

In the case of valves exercised less frequently than cold shutdown (i.e., refueling), relief from the Code requirement must be re-quested.

These cases are treated as such in this review.

3.1.5 Category E Valves (Physically Locked)

Although IWV-1300 of the 1974 Edition of Section XI of the ASME Boiler and Pressure Vessel Code excludes valves used for operating convenience and maintenance only from testing requirements, it is the staff's opinion and recommendation that any such phy:ically locked valve which is in the normai or alternate flow path of cool-ing water of engineered safety systems, from the source to the re-actor coolant pressure boundary or containment atmosphere, should be included in the valve testing program.

If the valve is nomally physically locked open or closed, it should be reflected in the program and designated " Category E."

This recommendation also ap-plies to engineered safety systems which are designed to remove de-cay heat frca the reactor core following a loss of coolant accident.

3.1.6 Changes to the Technical Soecifications In a tiovember 1976 letter to the Connecticut Yankee Atomic Power Company, NRC provided an attachment entitled "f;RC Staff Guidelines for Excluding Exercising (Cyci'ng) Tests of Certain Valves During Plant Operation." The attachment stated that when one train of a redundant system such as in the ECCS is inoperable, nonredundant valves in the remaining train should not be cycled since their failure would cause a loss of total system function. For example, during pcwer operation in some plants, there are stated minimum re-quirements for systems which make up the ECCS which allcw certain limiting conditions for operation to exist at any one time and if the system is not restored to meet the requirements within the time period specified in a plant's Technical Specification the reactor is required to be put in some other mode.

Furthemore, prior to initiating repairs all valves and interlocks in the system that b\\D

~

provide a duplicate function are required to b tested to demon-strate operability immediately and perioriically thereaf ter during power operation.

For such plants this situation would be contrary to the NRC guideline as stated in t.he document mentioned above.

The Connecticut Yankee, Haddam Neck Plant's Technical Snecifications may have requirements that are contrary to the above mentioned guidelines. We have discussed this situction with the licensee and the licensee has agreed to review the Technical specifications and to consider the need to propose Technical Specification changes which would have the effect of precluding such testing.

If, after making this consideration, the licensee detemines that the TS should not be changed because the guidelines are not appli-cable or if that the guidelines cannot be followed, the licensee shall submit to the NRC the reasons that led to their determination for each potentially affected valve.

In the licensee submittal, the potentially affected sections of the TS, in addition to the valves, should be identified.

3.1.7 Corrective Action for Inocerative Valves ASME Section XI Paragraph IWV 3410 (g) and IWV 3520 (c) concerning corrective action required when a valve fails an exercise test, botn state the following:

"If the condition is not or cannot be cor-rected-within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the valve shall be declared inoperative.

When corrective action is required as a result of tests made dJring cold shutdown, the condition shall be corrected before start-up.

A retest showing acceptable operation shall be run following any re-quired corrective action before the valve is returned to service."

It is understood, that constraints and limitations on plant start-up or centinued operation with an inoperable valve depend on many specific plant design features and conditions, and that the limiting conditions for start-up and operation hwe been analyzed and are described in the technical specification.

therefore, the possi-bility exists that the tech, spec. requirements may differ frcm the above code requirements.

The licensee should review this situation and if applicable, request relief in the resubmittal from this part cf the code. The licensee's basis for the relief request should list at a minimum the sections /pages of the tech. spec. that apply to the limiting conditions of operation.

/ A

., i c.

e2 3.2 Reactor Coolant System 16103-26045 (Sheet 4) 3.2.1 The following are valves in the IST program which the licensee intends to test to the applicable code requirement.

Valve Category PR-MGV-567 B

PR-MOV-569 8

PR-SV-584 C

PR-SV-585 C

PR-SV-585 C

PR-SV-587 C

PR-SV-538 C

3.2.2 The following are valves that were listed in the IST submittal and were agreed upon to be non-safety related (safety related as de-fined by "tJRC Staf f Guidance For Preparing Pump / Valve Testing..."

dated January 13, 1978), and were deleted from the IST program.

Valve Valve RC-MOV-501 PR-A0V-568 RC-MOV-512 PR-A0V-570 RC-MOV-513 PR-A0V-573 RC-MOV-524 PR-A0V-574 RC MOV-526 PR-MOV-596 RC-MOV-537 PR-MOV-597 RC-MOV-538 PR-MCV-598 RC-MOV-546 PR-MOV-599 3.3 Safety Injection System 3.3.1 The following are valves in the IST program which the licensee intends to test to the applicable code requirement.

Valve Category Valve Category

  • SI-MOV-861A B

SI-MOV-b53A A

  • SI-MOV-861B B

SI-MOV-863B A

  • SI-MOV-861C F

SI-MOV-863C A

  • SI-M0V-861D L

SI-MOV-863D

/

SI-RV-870 C

  • tio te : Motor operated valves SI-MOV-861A, 861B, 861C, and 8610 are in the HPSI system.

The valves are closed during normal plant operation and form part of & redundancy with check valves SI-CV-86A, 8623, 862C, 862D that isolates the HPSI system from the RCS operating pressure.

The valves are opened during an emergency condition when HPSI is re-quired.

The licensee is presently exercising these valves monthly per Tech.

Spec., without first detemining the closed integrity of the 862 series check valves.

Discussions led to the licensee agreeing tq G_

j- (s. ;

/

stroke the 851 MOV's quarterly per code preceeded by an integrity check of the 867 check valves.

In this case, the licensee would be in compliance with the NRC Staff Guidance of November 1976.

3.3.2 The following are valves that were listed in the IST submittal, and were agreed upon to be non-safety related (safety elated as defined by "NRC Staff Guidance For Preparing Pump / Valve Test-i ng...," dated January 13, 1978), and were celeted from the IST Program.

Valve FP-MOV-31 3.3.3 The following are valves that were not listed in the IST submittal and were agreed upon to be considered safety related and therefore will be added to the resubmittal as shown.

Valve Category

  • SI-MOV-24 E
  • RH-HCV-796 E
  • RH-FCV-602 E
  • Note:

These valves are physically locked valves.

3.3.4 Code Relief - Category C Check Valves 3.3.4.1 Relief Request - SI-CV-103, SI-CV-107A, SI-CV-107B, SI-CV-872A, SI-CV-872B The licensee has requested relief frc.n full or part stroke exer-cising the subject check valves every 3 months and at cold shut-downs (non-refueling).

Code Recuirenent - Check valves shall be exercised at least once every 3 montns, with the exceptions as shown in the following para-graph.

Check valves shall be exercised to the position required to fulfill their function unless such operation is not practical during plant operation.

If only limited operation is practical during plant operation the check valve shall be part stroke exercised during plant operation and full stroked during each cold shutdown.

In case of frequent cold shutdowns these check valves need not be exercised more often than once every 3 months.

Normally closed check valves that cannot be operated during normal plant operation shall be specifically identified by the Owner and shall be full stroke exer-cised during each cold shutdown.

In case of frequent cold thutdowns these check valves need not be exercised more often than once ecery 3 months. Ib

/lb b

Licensee Basis for Reauest - Quarterly testing:

During normal plant operation, it is to generate any flow through the subject check valves, as the system is not designed wi th any method to apply suf-ficient pressure to open the check valves.

Cold Shutdown Tests.

'erforming a design flow test using the LPSI pumps is the only method available (without disassembly) to full stroke exercise the subject check valves.

This requires venting the RCS, and removal of the pressurizer manway or several safety valves before a LPSI pump can be used for initiating design flow to the re -

actor (Low Pressure Overpressure Protection for Reactor Vessel re-quirements, established by the HRC).

Performing this flow test at each cold shutdown would require several days extra work, and ex-tension of what would usually be a " quickie" maintenance outage.

To partially stroke the check valves would require that the RCS be vented, and that the pressurizer level be established at a low laci and visually monitored as flow is established frcm the LPSI pumps and introduced into the RCS (pressurizer).

In both the full stroke and nart stroke cases cited, water pumped by the LPSI pumps would originate from the RWST (borated water).

Introduction of this water to the RCS would requi re addi tional waste liquid processing which is time consuming and delays startup.

Disassembly (where possible) of the check valves is impractical from a time standpoint, and would also increase the length of outages.

Refueling Interva' Testing:

Connecticut Yankee has historically had water clarity problems when its refueling water is injected to quickly into the cavi ty.

This condition has delayed the refueling more than a day.

The cavity is typically filled very siowly (ap-proximately 160 GPM) to preclude this clarity problem.

The total consequences of a rapid fill are not fully known, but the possibilities are:

a.

Delay in refueling due to water clarity (experience) b.

Increased radiation exposure for the refueling crew due to shak-ing up settled crud.

c.

When the water is placed back in the RWST, the 10 Ci per tank limi t may be exceeded.

A design flow system test which flow checked all the subject check valves was run once in 1971 and never since.

The test was acccm-plished by removal of the pressurizer nanway (RCS vented), lowering of the pressurizer level and running the LPSI pump for approximately 30 seconds.

This test is considered risky, and any error in its perfonnance could cause a large spill of reactor coolant on the containment floor and equipment.

This test is considered to unsafe to run repeatedly or ever again. g,l O 74/

J

\\

A gravity flow test is presently planned at each refueling ortage, i.e. flowing from the RWST through the LPSI system to the RCS, using the pressurizer as a resevoir.

This test will flow all the subject check valves in the LPSI system.

The flowrate will be unknown, but it is expected that this test will show at least partial stroking.

Addi tionally, at every 5 year interval, i t i s proposed to perform a LPSI test which would test check valves SI-CV-103,107A and 107B at design flow.

Thi s test requi res removal of the reactor head (wi th SI-CV-872A, 872B, and SI-M0V-871A, 871B, attached), end using the LPSI pumps to inject water into the cavity at design flow.

An attempt will be made at the February 1979 refueling outage to manually move the flappers of check valves SI-CV-872A and 8728 when the reactor head is removed.

At this time, i t is not known whether this is possible due to the piping configuration.

Disassembly of these check valves is not possible, as they are welded assemblies.

Evaluation - The LPSI Pump Di scharge check valves SI-CV-107A and 107B, LPSI Pump Descharge to RHR check val ve SI-CV-103, and Core De-luge check valves CD-CV-872A and 872B cre closed during normal plant operation, c d are required to open when LPSI flow is initiated to the reactor.

Quarterly Testing:

The subject check valve designs are such, that they can only be exercised by disassembling or by ficw.

The LPSI system configuration is such, that flow can only be initiated through the check valves by activating the LPSI pumps.

Duri ng normal plant operation, the RCS pressure is approximately 2000 psig, and acts to close CD-CV-872A and 872B (assuming CD-MOV-871 A and 871B are open).

The discharge pressure of the LPSI pumps is far lower than the RCS operating pressure, and can not open check valves 872A and 872B against tne RCS head.

SI-CV-103,107A, and 107B are in series with 872A anc 8728 and are also prevented from exercising.

It should be noted, that the mini-flow recirculation lines off the LPSI pumps are upstream of the 107A and 107B which eliminates any pcrt stroke exercise of these check valves when the LPSI pumps are run monthly.

Based on the aoove, it is agreed that full or part stroke exercising the subject valves by disassembly (where possible) or flowing is impractical on a 3 month basi s.

Cold Shutdown Tests:

The licensee's basis for relief has ade-cuately established that full or part stroke exercising the subject check valves by flow or disassembly is highly impractical from a time and operations standpoint.

Pefueling Interval Testing:

The licensee has proposed to attempt to manually exercise SI-CV-872A and 8728 at the February 1979 refueling when the reactor head is removed wi th these check val /es attached.

The degree of exercise and test frequency will be proposed in the resubmittal and be based on the results of thi s ter,t.

g<

J I C(

i. a( q u

The planned gravity flow test's effectiveness is difficult to evalu-ate because the licensee is not proposing to measure or determine fl ow.

The degree of part stroke exercise should be established to assure that the flow through the check valves is not just seat leak-age across a stuck closed flapper.

The LPSI pump / cavity fill, design flow test of SI-CV-103,107A and 107B is proposed at 5 year intervals.

It is recommended, that the licensee explore the possibility of disassembling and full stroke exercising these check valves at refueling intervals, and provide rationale if this is not considered feasible.

Summary:

It is agreed that full or part streke exercising the sub-ject check valves quarterly is i,npractical, and that exercising at cold shutdowns is also impractical.

However, based on the evalua-tion of the licensee's proposals for tests at refueling intervals, it is recommended that any request for relief from the code ex-ercising requirements be denied at this time.

This is based on the followi ng:

a.

The licensee has not proposed the degree of exercise and test frequency planned for SI-CV-87EA and 872B.

This is expected in the resubmi ttal.

b.

The licensee has not proposed how it will be determined how gravity flow through a partially stroked check valve i s di s-tinguished from leakage across a stuck closed flapper.

c.

The licensee has not acdressed the possibility of disassembling SI-CV-103,107A and 1073 at some :nterval.

3.3.4.2 Relief Recuest - SI-CV-836A and 8568 The licensee has requested re'ief from full stroke exercising the subject valves quarterly, and at cold shutdowns (non-refueling)

Code Recuirements - See Code Rt.quirement Item 3.3.4.1 Licensee's Basis for Recuest - Full stroke exercising these check valves require tMt tne RCS be vanted, and flow from the RWST be es-tablished to the RCS through the valves using the HPSI pumps.

The design flow required is approximately 1750 GPM.

A part stroke ex-ercise is perfomed on the valves monthly when the HPSI pumps are tested using the pump test recirculation line.

Flowrate through each valves at that time is expected to be approximately 1000 GPM.

Evaluation - The HPSI Pump Di scharge check valves SI-CV-856A and 856B are closed during normal plant operation, and their function is to open when the HPSI pumps are activated and supply RWST water to the RCS during the emergency condition.

The licensee proposes to part stroke the check valves during monthly HPSI pump tests, but has not proposed a full stroke exercise test t.<lb

l. g c U /

8

f reque ncy.

The licensee was requested to review the testing on the valves and provide a full stroke exercise test frequency, if pos-sible, and tha rationale behind selecting this frequency.

The licensee has agreed to provide this information in the resubmittal.

Until this information is received and reviewed, it is recommended that any request for relief from the code exercising requirements be denied at this time.

3.3.4.3 Relief Request - SI-CV-862A, SI-CV-8628, SI-CV-862C, SI-CV-862D The licensee has requested relief from full or part stroke exer-cising the subject check valves quarterly and at cold shutdown (non-refueling).

Code Reauirement - See Code Require.nent Item 3.3.4.1 Licensee's Basis for Recuest - Full or part stroke exercising these check valves require that tne RCS be vented, and flow from the RWST be established througn the valves to the RCS using the HPSI pumos.

Exercising is not possible when the RCS is at operating pressure (2000 psig).

A part stroke exercise flow test (<1 percent of design flow) is planned at refueling.

Evaluation - The safety injection valves SI-CV-862A, 862B, 862C, and 862D are in the HPSI system.

The valves are closed during normal plant operation and are part of redundancy that isolates the oper-ating RCS pressure from the lower design pressure HPSI system.

The check valves open when the HPSI pumps are activated and RWST water is supplied to the RCS during the emergency condition.

The licensee proposes to part stroke the valves at refuelings, but has.W proposed a full stroke exercise test frequency.

The licentws -vas requested to review the testing on the valves and provide a full stroke exercise test frequency, if possible, and the rationale behind selecting the frequency.

The licensee has agreed to provide this information in the resubmittal.

Until this information is received and reviewed, it is recommended that any request for relief from the code exercising requirements be denied at this time.

3.3.5 Cold Shutdown Testina of Valves The following are valves in this system that the licensee cannot ex-ercise every 3 months and intends to full stroke exercise at cold shutdowns. The valves are normally closed and therefore satisfy the code requirement.

The intent of this section is to satisfy the re-quirements of the NRC letter dated January 13, 1978, i.e., "'lRC Staff Guidance For Preparing Pump and Valve Testing Program Cescrip-tions and Associated Relief Requests Pursuant to 10 CFR 50.55 a(g),"

specifically section 5, page 7.

bib 2[b 3.3.5.1 Category B Valves 3.3.5.1.1 Code Reouirement - CD-MOV-871A, CD-MOV-871B Category B valves shall be exercised at least once every 3 months with the exceptions as shown in the following paragraph.

Valves shall be exercised to the position required to fulfill their function unless such operation is not practical during plant oper-ation.

If only limited operation is practical during plant oper-ation the valve shall be part stroke exercised during plant oper-ation and full stroked during each cold shut; in case of frequent told shutdowns these valves need not be exercised more of ten than or ce every 3 months.

Normally closed valves that cannot be operated du ing nomal plant operation shall be specifically identified by the Owner and shall be full stroke exercised during each cold shut-dowa; in case of frequent cold shutdowns these valves need not be exercised more often than once every 3 months.

Licensee's Basis for Request - Exercising the subject M0V's open quarterly during nomal plant operation would violate an t1RC Guide-line (Novemb w 1976).

Evaluation - The Core Deluge valvis CD-MOV-871A and 871B are in the LPSI system.

The valves are closed during nomal plant operation and form part of a redundancy with check valves CD-CV-872A and 8728 that isolates the lower design pressure LPSI from the RCS operating pressure (2000 psig).

The valves are openned during an emergency condi tion when LPSI i s requi red.

The licensee submittal had proposed to exercise the valves every 3 months to ccde.

The staff pointed out the flovember 1976 Guidelines concerning the exercising power operated valves in series with check valves that would interface with the RCS a operating pressure.

The licensee stated that thera were no provi sions in thi s system that would enable him to check the closed integrity of the 872A and 872B check valves prior to exercising MOV's 871A and 871B respectively.

Based on the staff guideline, the licensee is proposing to full stroke the valves at cold shutdowns and refuelings.

Based on the above, i t is concluded that the licensee has dcmon-strated the impracticality of part or full stroke exercising every 3 months and that full stroka exercising at cold shutdowns is the practical alternative that satisfies the intent of the code.

3.4 Residual

.at Removal System 3.4.1 The following are valves in the IST program which the licensee intends to test to the applicable code requirements. 6}(.

.? ? j i,

Valve

_C_at e go ry Valve Category RH-MOV-21 B

RH-RV-715 C

RH-MOV-22 B

RH-CV-788A C

RH-MOV-25 B

RH-CV-788B C

RH-MOV-26 B

RH-V-808A B

RH-MOV-27 B

RH-MOV-874 E

RH-MOV-28 B

TH-MOV-29 8

3.4.2 The following are valves that were not listed in the IST submittal and Were agreed upon to be cunsiderea safety related and, there-fore, will be aaded to the resubmittal as shown.

Valve Category

  • RHR-V-23A E
  • FH-A0V-796 E
  • RH-A0V-602 E
  • SI-MOV-24 E
  • Note:

Valve is physically locked.

3.4.3 Coce Relief - Category B Valves 3.4.3.1 Relief Reauest - RH-MOV-23 and RH-MOV-34 The licensee's submittal request ed relief to exercise these valves at reactor refuelings.

Code Reouirement - See Code Requirement, Itsa 3.3.5.1.1 Licensee Basis for Recuest - The licensee hcs stated that the Tech.

Spec. calls for tne valves to be operated in a no-flow condition.

Evaluation - The containment spray system is set up such that open-ing Containment Spray valves RH-MOV-23 and RH-MOV-34 will initiate containment spray.

In orcer to isolate these valves, RHR-V-23A woula have to be closed.

Closing 22A (manual valve insice contain-ment) would put the valve in a non-conservative position, i.e. cis-abling the Containment Spray systen during nonaal plant operation.

This condition would violate Tech. Spec. requirements an" the NRC's November 1976 guidelines.

The licensee has agreed to full strcke exercise the subject MOV's at cold shutdowns and refuelings.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of part or full streke exercising every 3 months, and that full stroke exercising at cold shutacuns anc refuelings is the practical alternative that satisfies the intent of the code.

It is recommenced that code relief be granted ta full stroke exercise tne valves at cold shutdowns and refuelings. Ii}b

//2

3.4.4 Code Relief - Categcry C Check Valves 3.4.4.1 Relief Reouest - RF-CV-783 and RH-C I-808A The licensees have requested that these valves be exercised at re-ac tor refuelings.

Code Reauirement - See Code Requirement, Item 3.3.4.1 Licensee Basis for Reauest - The subject valves must be disassembled to be exerci sed.

Evaluation - The Containment Sump Suction check valves RH-CV-783 and RH-CV-808A are in the recirculation lines to the RHR pumps.

The valves are required to open wnen the sump recirculation mcde is re-quired following the LOCA.

The valves are nct designed to be exercised by external actuators, and can only be exercised by flow or by disassemoling.

Flowi rg the vulves is impractical at any titre as the systems configuration is such that the containment sump would have to be filled with water, and the contaminated water flowed back through the RHR pumps to the reactor.

Therefore, di sassembly and exercise appear to be the practical alternative.

The licensee presently plans to di sassemble, exercise, and visually examine the condition of tne check valves during the February 1979 refueling period.

3ased on the results c'f the examination and test, the licensee will propose what exercising frecuency is planned frcm that point.

This information would be included in the resubmittai.

Until thi s information i s received and reviewed, i t i s recommended that any request for relief from the code exercising requirements be denied at thi s time.

3.4.5 Cold Shutdown Testing of Valves - See Item 3.3.5 3.4.5.1 Category B 3.4.5.1.1 Code Requirement - RH-MOV-33A and RH-MOV-33B See Code Requirement, Item 3.3.5.1.1 Licensee's 3 asis for Recuest - Opening the subject valves during normal plant operation would cause flow transients in the charging system.

Evaluation - Valves RH-MOV-33A and 33B are normally closed valves leading from the RHR pumps to the suction side of the charging pumps.

The valves are required to open to feed from the RHR to the charging pumps when this mode of recircu~ ation is required during the emergency condition.

~ ~

6l6 2/j

The licensee has indicated that the ficw transients caused in the charging system by cycling the valves could cause Reactor Coolant Pump seal damage.

Also, opening these valves opens a flow path from RWST to the charging pur.!p suction which would affect baron concen-tration in the RCS and reactivity.

Based on the above, it is concluded that the licensee has demon-stratej the impracticality of part or full stroke exercising every 3 months, and that full strcke exercising at cold shutdowns and refuelings is the practical alternative that satisfies the intent of the code.

It is recanmended that code relief be granted to full stroke exercise the valves at cold shutdowns and refuelings.

3.4.5.1.2 Code Requirement - RH-MOV-780, RH-MOV-781, RH-MOV-804, and RH-MOV-603.

See Code Requirement, Item 3.3.5.1.1 Licensee's Basis for Request - Exercising the subject valves re-quires cepressurizing the RCS.

Evaluation - The Residual Heat Removal Valves RH-MOV-780 (Inboard Stop-Loop #1), RH-MOV-781 (Outboard Stop-Locp #1), RH-MOV-804 (In-board Stop-Laop 42), and RH-MOV-803 (Outboard Stop-Loop #2) isolate the lower design pressure RHR system frca the operational pressure of the RCS (approximately 2000 psig).

The valves are openea when the RHR system is used to

move decay heat from the reactor during nonnal shutdown comdit".is.

The valves are pressure f aterlocked with the RCS, and cannot be opened when the RCS is above 375 psig.

The valves are full stroke exercised at cold shutdown conditions when the RHR system is used.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months and that cold shutdowns belcw 375 psig is the only time the valves can be opened.

3.5 Chemical and Volume Control Systen 3.5.1 The following are valves in the IST program which the licensee intends to test to the applicable code requirements.

Valve Category Valve Category LD-RV-205 C

BA-MOV-349 B

CH-CV-20' C

BA-CV-361 C

Cri-CV-27 2 C

3A-CV-370 C

CH-CV-293 C

BA-MOV-386 B

CH-CV-2928 C

  • CH-CV-399 B

CH-CV-292C C

  • Not1:

This valve will be shown in the resubmittal as satisfying the code.

3.5.2 The following are valves that were not listed in the IST submittal and were agreed upon to be considered safet;' related, and there-fore, will be adced to the esubmittal as shown.

} c,;

/ l, t Valve Category

  • CH-CV-305A AC
  • CH-CV-305B AC
  • CH-CV-3050 AC
  • CH-CV-305C AC DH-TV-1841 A

DH-TV-1847 A

FH-A0V-110 B

  • Note:

For the purposes of this review, these valves have been exempted from requiring a relief request pending the Appendix J review.

3.5.3 The following are va ves that were listed in the IST submittal, and were agreed upon to be non-safety related (safety related as defined by NRC Staff Guidance for Preparing Pump / Valve Test-i ng...," dated Janua ry 13, 1978) and were deleted fran the IST Program.

Valve Valve Valve CH-CV-260 CH-CV-268 CH-MOV-298 CH-CV-262 CH-CV-277 CH-CV-325 CH-CV-326 3.5.4 Code Relief - Category A Valves 3.5.4.1 Relief Reouest - CH-TV-334 The licensee has requested relief to exercise the subject valve at

-eactor refuelings.

Code Reouirement - Category A valves shall be exerc. 3ed at least once every 3 months with the exceptions as shown in the following paragraph.

Valves shall be exercised to the position required to fu. fill their function unless such operation is not practical during pla.'t opera-ti o n.

If only limited operation is practical during plant operation the valve shall be part stroke exercised during plant operation and full stroked during each cold shutdown; in case of frequent cold shutdowns these valves need not be exercised more often than once every 3 months.

Normally closed valves that cannot be operated during normal plant operation shall be speci fically identi fied oy the Owner and shall be full stroke exercised during each cold shut-down in case of frequent cold shutdowns these valves need not be exercised more often than once every 3 months.

Licensee's Basis for Reauest - Closing this valve isolates seal water supply to tne Reactor Coolant Pumps.

Evaluation - The Seal Water Return Line Trip Valve CV-TV-334 is in the seal water supply line from the RC pumps to the charging pumps.

The valve is open during normal plant operation and its safety re-lated function is to close to form part of containment.

The valve can only be full stroka exercised.

c C '

Closing this valve during normal plant operation stops seal water to the RC pumps and could result in pump damage.

The licenset nas agreed to test the valve at certain cold shutdown conditions and re-fuelings where the RC pumps are inactive, and operation of the seal w6 ter systen i s not requi red.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months and that full stroke exercising at cold shutdown conditions mentioned end reactor refuelings is tne practical alternative that satisfies the intent of the code. It is recommended that code relief be grante..

3.5.5 Code Relief - Catecory B Valves 3.5.5.1 Relief Reauest - LD-MOV-200 The licensee has requested relief be cranted to exercise this valve at cold shutdown.

Code Requirement - See Code Requi rement, Item 3.3.5.1.1 Licensee's Basis for Recuest - Operation of the subject valve would snutof f letdown flow.

Evaluation - The Letdown Isolation valve LD-MOV-200 is in the let-aown line and is open during nonnal plant operation.

The valve can-not be part stroked, and goes full closed when i t's required to operate.

Shutting of f the letdown line can have an affect on pres-surizer level which can result in a reactor trip.

The valve will be exercised at cold shutdown and reactor fuelings.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months, and that full stroke exercising at cold shutdowns and reactor refuelings is the practical alternative that satisfies the intent of the code.

It is recommended that code relief De granted.

3.5.5.2 Relief Recuest - CH-MOV-257 The licensee has requested that relief be granted to exercise this valve at cold shutdowns.

Code Reauirement - See Code Requirement, Item 3.3.5.1.1 Licensee's Basis for Recuest - Closing the subject valve will cause the charging pumps to cavi tate.

Evaluation - The Volume Control Tank Outlet valve is in the line from the VCT to the suction side of the chargng pumps.

The valve i s open during normal plant operation and i s in the path of the makeup and RC pump seal water flow via the charging pumps.

The valves safety related function is to close during the emergency condition.

Closing the valve during plant operation causes cavitation of the c

31c, i/e,

charging pumps, and shuts off makeup and seal water flow, the re-sults of which could be a reactor trip and RC pump seal damage.

The valve will be full stroke exercised at cold shutdown, and re-actor refueling.

Based on the above, it is concluded that the licensee has demon-strat?d the impracticality of exercising the valves every 3 months, anr1 that full stroke exercising at cold shutdowns and reactor refuelings is the practical alternative that satisfies the intent of the code.

It is recommended that code relief be granted.

3.5.5.3 Relief Request - FH-CV-296 The licensee has requested relief to exercise the subject valves at reactor refuelings.

Code Recuirement - See Code Requir ment, Item 3.3.5.1.1 Licensee's Basis for Request - The valve is in the loop fill header and i s only opened at refueling.

Evaluation - The loop fill valve FH-Cn296 is closed during nonnal plant operation and its safety related position is also closed.

The NRC staff considers the subject valves as passive, i.e. a closed valve whose function is to remain closed during the emergency con-di ti o n.

The staff has detemined that the exercising requirement of Code Section XI provides no meaningful infomation for these passive valves, and relieves the licensee from the 3 month stroke and stroke timing requi rements.

3.5.6 Cold Shutdown Testing of Valve - See Item 3.3.5 3.5.6.1 Category B Valves 3.5.6.1.1 Code Recuirement - B A-MOV-32 and BA-MOV-373 See Code Requi rement, Item 3.3.5.1.1 Licensee's Basis for Recuest - Opening the subject valves during normal plant operation would cause reactor coolant water chemistry problems.

Evaluation - BA-MOV-32 and BA-MOV-373 are in the flow path from the RWST to the suction side of the charging pumps.

The valves are closed during nomal plant operations.

Opening them would allow RWST water to flow to the RCS via the charging pumps and result in a baron concentration increase in the reactor coolant water wi th re-sultant reactivity changes.

Both valves will be full stroke exer-cised at cold shutdowns and reactor refuelings.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months and that full stroke exercising at cold shutdowns and refuelings is the practical alternative. 51,(

)

3.5.6.1.2 Code Reauirement - BA-M0V-366 See Code Requirement, Item 3,3.5.1.1 Licensee's Basis for Recuest - Operation of this valve would cause water chemistry problems.

Evaluation - Tne Boric Acid to Charging Pump Valve BA-MOV-366 is closed during normal plant operation and it's safety related func-tion is to open to provide Boric Acid from the BAT to the reactor via the charging pumps. Opening the valve during normal plant oper-ations would supply the boric acid to the RCS resulting in a boron concentration increase and reactivity decrease.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of e,;ercising the valves every 3 months, and that full stroke exercising at cold shutdowns and reactor refueling is the practical alternative.

3.5.4.2 Category A 3.5.6.2.1 Code Reouirement - LD-A0V-202, LD-A0V-203, and LD-A0V-204 See Code Requirement, Items 3.5.4.1 Licensee Basis for Reouest - Closing these valves shutsdown the let-uown line.

Evaluation - The Letdown Orife Flow Control valves LD-A0V-202, LD-A0V-203, and LD-A0V-204 are partially stroked at fecquencies higher than the code required 3 months, during normal plant oper-ation.

Full stroking the valves closed shutsoff the letdown flow and could result in a reactor trip.

The valves will be full stroke exercised at cold shutdowns and reactor refuelings.

Baned on the above, it is concluded that the licensee has demon-stra'ed the impracticality of full stroke exercising the valves every 3 months, and that full stroke exercist ag at cold shutdowns and reactor refuelings is the practical altcenative.

3.5.6.3 Category C 3.5.6.3.1 Code Recuirement - BA-CV-320 See Code Requirement, Item 3.3.4.1 Licensee Basis for Reauest - Operation of this valve would cause water chemi stry problems.

Evaluatiqn - The Boric Acid Strainer Discharge check valve BA-CV-320 is in the iiae frca the Boric Acid Tank to the suction side of the charging pumps.

The valve is requirea to open when the Boric Acid is required to be supplied to the reactor via the charging pumps during the emergency condition. 516 2/8

The valve is not designed to be exercised by an external actuator, and can only be exercised by flowing the boric acid from the BAT.

During normal plant operation, this high concentration boron solu-tion would be supplied directly to the charging pump and increase the boron concentration of the reactor coolant thereby affecting re-acti vi ty.

The check valve will be axercised at cold shutdown and reactor re-fueling.

Bred on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months, and that full stroke exercising at cold shutdtwns and reactor re-fueling is the practical alternative.

3.5.6.3.2 Code Recuirement - BA-CV-372A See Code Rt quirement, item 3.3.4.1 Licensee's Basis for Reauest - Operation of this valve would cause water chemistry problems.

Evaluation - The RWST to Charging Pump check valve BH-CV-372A is closed during normal plant operation, and its safety related func-tion is to open when BA-MOV-373 is opened and water is supplied from the RWST to the charging pumps.

Opening the check valve during normal plant operation would require opening BA-MOV-373 and flowing the relatively higher borated water from the RWST to the reactor coolant via the charging pumps.

This would increase the reac.ar coolants boron concentration, and result in a reactivity change.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months, and that full stroke exercising at cold shutdown and reactor refueling is the practical alternative.

3.5.6.3.3 Code Reauirement

  • BA-CV-387 See Code Requirement, Item 3.3.4.1
  • Note: This valve was mistakenly identified as BA-CV-381 in the IST Program submittal.

Licensee's Basis for Reauest - Operation of this valve would cause water chemistry problems.

Evaluation - The Boric Acid to Charging Pump check valve BA-CV-387 is closed during normal plant operation and its safety related func-tion is to open when BA-MOV-366 is opened and the concentrated boric acid solution is supplied from the BAT to the charging pumps.

Open-ing -387 *uring normal plant operation would require opening BA-MOV-366 and flowing the concentrated Boric Acid solution to the reactor coolant via the charging pumps. '

27h Ei[

ag/

Thir would increase the reactor coolant's boron concentration, and result in a reactivity change.

Based on the above, it is concluded that the licensee has demon-strat(d the impracticality of exercising the valves every 3 months, ec at.d that full stroke exercising at cold shutdowns and reactor

[

refueling is the practical alternative.

3.6 Containment Isolation Valves 3.6.1 Relief Reauest - The licensee has requested relief from exercising the rollowing valves per code requirements for Category A and C val ve s.

Valve Category Valve Service PW-CV-139 AC Primary Water to PRT PW-CV-140 AC Primary Water to PRT HC-V-212 AE Space deater Containment Return P U-V-24 2 AE Cavity Purification Line PU-V-242A AE Cavity Purification Line HS-CV-295 AC Containment Space Heating Supply HS-CV-295A AC Containment Space " eating Supply

  • BV-1-1B AE Containment Purge Air 'xhaust

'HCV-1101 AE Containment Purge Air 2xhaust Bypass

  • BY-1-1A AE Containment Purge Air Supply
  • P50 AE Fuel Transfer Tube SA-V-41'.A AE Air Monitor Purge SA-V-413 AE Service Air to Containment
  • Note:

These valves were categorized as 'A" in the submittal, and were revised to Category AE as a result of the SER meeting.

Code Recuirement Category A - See Code Requirement, Item 3.5.4.1 Category C - See Code Requiremeni, Item 3.3.4.1 Licensee's Basis for Reauest - The valves are closed during normal plant operation, and tneir safety related position is closed.

Evaluation - The NRC staff considers the subject valves as passive, i.e. a closed valve whose function is to remain closed during the emergency condition.

The staff has determined that the exercising requirement of Code Secticn XI provides no meaningful information for these passive valves, and reliives the licensee frcm the 3 month stroke and stroke timing requirements.

3.7 Main Steam Systen 3.7.1 Relief Reauest - The following are valves in the IST program which the licensee intends to test to the applicable code requirements. L1

, o r-

. i l U.

i. d l;

Valve Category Valve C_ategory MS-SV-11 C

MS-NRV-38 BC MS-SV-12 C

MS-SV-41 C

MS-SV-13 C

MS-SV-42 C

MS-SV-14 C

MS-SV-43 C

MS-NRV-18 BC MS-SV-44 C

MS-SV-21 C

MS-NRV-48 BC MS-SV-22 C

MS-PICV-1206A B

MS-SV-23 C

MS-PICV-12063 B

MS-SV-24 C

BD-V-506 A

MS-NRV-28 BC BD-V-515 A

MS-SV-31 C

BD-V-522 A

MS-SV-32 C

BD-V-529 A

MS-SV-33 C

MS-SV-1216 A C

MS-SV-34 C

MS-SV-1216B C

3.7.2 Code Relief - Category B 3.7.2.1 Relief Request - BD-TV-1312-1, BD-TV-1312-2, BD-TV-1312-3, and BD-TV-1312-4 The licensee has requested to full stroke exercise the subject valves at reactor refuelings.

Code Recuirement - See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Recuest - The valves are tested as containment isolation valves only.

Evaluation - The Steam Generator Blowdown valves BD-TV-1312-1,

-2,

-3, and -4 are open during normal plant operation, and their safety related function is to close and form part of containment in an cm-ergency condition.

The valves cannot be part stroke exercised, and can only be full stroke exercised together (i.e., all and simul-tar.eou sly).

Full stroke exercising during normal plant operation stops thc steam generator blowdcwn. The licensee has indicated that the code frequency could cause chemistry problems with the steam generator water which could result in tubing degradations.

The licensee has agreed to full stroke exercise the valves at cold shutdowns as well as reactor refuelings.

It is believed that the licensee has demonstrated the inpracticality of exercising every 3 months and that full stroke exercising at cold shutdcwns and reactor refuelings is the practical alternative that

~

satisfies the intent of the code.

It is recommended that code re-lief be granted to full stroke exercise at cold shutdown and reactor ref ueli ng s.

3.7.3 Cold Shutdown Testing of Valves - See Item 3.3.5 n *.

5}b ADI 3.7.3.1 Category B 3.7.3.1.1 Code Requirement - MS-TV-1211-1, MS-TV-1211-2, MS-TV-1211-3, and MS-TV-1211-4.

See Code Requirement, item 3.3.5.1.1 Licensee Basis for Reauest - Full stroke exercising each of the sub-ject vaives closed during normal plant cperation shuts off its re-spective steam line to the turbine.

Evaluation - The Main Steam Outlet valves MS-TV-1211-1,

-2,

-3, and

-4 are open during normal plant operation, and their safety related function is to close.

The valves are part stroked at a frequency that satisfies the code, and are full stroked at cold shutdowns.

Full stroking any valve nuarterly. shuts off the steam in that line, and could result in a reactor trip.

Based on this, it is concluded that the licensee has demonstrated the impracticality of full stroke exercising every 3 months, and that full stroking at cold shutdowns and reactor refuelings is the practical alternative.

3.7.3.1.2 Code Requirement - MS-NRV-11, MS-NRV-21, MS-NRV-31, and MS-NRV-41.

See Code Requirement, Iten 3.3.5.1.1 Licensee Basis fcr Reauest - Full stroke exercising the subject valves during r.ormal plant operation shutseff a steam supply line.

Evaluation - The Steam Generator Non-return valves MS-NRV-11, -21,

-31, anc -41 are open during nonnal plant operation and their safety related function is to close.

The valves are part stroke exercised quarterly and full stroked at cold shutdcwns.

Full stroking any valve quarterly shutsoff the steam in that supply line, and could result in a reactor trip.

Based on tilis, it is concluded that the licensee has demonstrated the impracticality of full stroke exercising every 3 months, and that full stroke exercising at cold shutdowns, and reactor refueling is the practical alternative.

3.8 Feedwater System 3.8.1 The following are valves in the IST program, shich the licensee intends to test to the applicable code requirement.

Valve Ca tegory FW-MOV-35 B

FW-CV-143-1 C

FW-CV-143-2 C

FW-CV-143-3 C

FW-CV-143-4 C 5}6 g,Q }-

3.8.2 Tile following are valves that were listed in the IST submittal, and were agreed upon to be non-safety related (Safety related as de-fined by "NRC Staff Guidance for Preparing Pump / Valve Testing....,"

dated January 13, 1978) and were deleted from the IST Program.

Valve Category FW-CV-135-1 C

FW-CV-135-2 C

FW-CV-135-3 C

FW-CV-135-4 C

FW-CV-182 C

3.8.3 Code Relief - Category B Valves 3.8.3.1 Relief Reauest - FW-MOV-11, FW-MOV-12, FW-MOV-13, and FW-MOV-14 The licensee has requested relief from stroking the subject valves closed every 3 monn's Code Reauirement - See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Reauest - Stroking the subject valves closed dur-ing normal plant operat on shuts off the feedwater supply to the re-spective steam g.7nerator.

Evaluation - The Steam Generator Feedwater Isolation valves FW-MOV-11, -12, -13, and -14 are normally open, full stroke only type val ve s.

The valves are required to stay open during emergency con-ditions when emergency feedwater is suppliec to the steem generators by the auxiliary stecm generated feed pump.

The NRC staff considers the subject valves as passiva, i.e. an open valve whose f Jnction is to stay open during the emergency condition.

The staff has determined that the exercising requirement of Code Sec-tica XI provides no meaningful information for these passive valves, and relieves the licensee from the 3 month stroke and stroke timing requirements.

3.P.4 Code Relief - Category C (check valves) 3.8.4.1 Relief Recuest - FW-CV-192, FW-CV-194, FW-CV-196, and FW-CV-198.

The licensee is requesting relief from exercising the subject valves at 3 month intervals.

Code Reauirement - See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Reauest - The valves are containment isolation valves and are closed curing normal plant operation.

The.cives are tested to Appendix J requirements. c, i c

,^'

.lb

.v s

_ Evaluation - The NRC staff considers check valves FW-CV-192, -194,

-196, and -198 as passive, i.e. a closed valve whose function is to remain closed, as is the case of these containment isolation valvec.

The staff has determined that the exercising requirement of code Sec-tion XI provides no meaningful information for these passive val'.es, and relieves the licensee from the quarterly stroke requirementr.

3.8.5 Cold Shutdown Testing of Valves 3.8.5.1 Category B 3.8.5.1.1 Code Reouirement - FW-FCV-1301-1, FW-FCV-1301-2, FW-FCV-1301-3, and FW-FCV-1301-4.

See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Reouest - Full stroking the subject valves to the closed position shuts of f feedwater to the respective steam genera-tor. The valves will be full stroke closed at cold shutdowns and refuelings.

Evaluation - The Feedwater Regulator Valves FW-FCV-1301-1,

-2,

-3, and -4 are control valves that are opan and in constant operation (part stroking) when the plant is in normal operation.

Exercising a valve closed, shuts off the feedwater to its respective steam generator and could cause a reactor trip.

The licensee has demonstrated the impracticality of idll stroke ex-ercising every 3 months, anc that full stroke exercising at cold shutdowns and refuelings is the practical alternative.

3.8.5.1.2 Code Reouirement - FW-HICV-1301-1, FW-HICV-1301-2, FW-HICV-1301-3, and FW-HICV-1301-4.

See Code Requi rement, Item 3.3.5.1.1 Licensee Basis for Recuest - Str'*ing the subject valves full closed quarterly during ncema; plant operation causes v3ter hammer problems.

This has been verified by operating experience.

The valves will be part stroke exercised quarterly, and full stroke exercised at cold shutdowns and refuelings.

Evaluation - The Feedwater Bypass Vd ves FW-HICV-1301-1.1301-2, 1301-3, and 1301-4 are valves in the emergency feedwater circuit and provide fl% control of emergency feedwater to the steam generators.

The valves are normally open and flow feedwater supplied by the feedwater pumps.

The licensee has stated that, frcm experience, closing the valves causes water hammer.

In that water hammer is un-desi ble in a fluid system and can have deleterious effects, it is agreed that full stroke exercising quarterly is impractical, and that full stroke exercising at cold shutdowns and reactor refueling is the practical al ternative. 5!6 294

3.8.5.2 Category C 3.8.5.2.1 Code Requirement - FW-CV-1538, FW-CV-156-1, FW CV-156-2, FW-CV-156-3, FW-CV-156-4, and FW-CV-184.

See Code Requirement, Item 3.3.4.1 Licensee Basis for Request - Opening the subject check valves during normal plant operation would thermally shock the steam generators.

The valves will be full stroke exercised at cold shutdowns and re-f uel i ngs.

Evaluation - Check valves FW-CV-153B, -156-1, -156-2, -156-3, -156-4, and -184 are in the emergency feedwater system from the auxiliary steam generated feed pumps. Part or full stroke exercising the valves would require flowing water from the demineralized water stor-age tank to the steam generators via the emergency feedwater pump.

The demineralized 9:ater is at ambient temperature, and would result in thermal shcck to the steam generators.

The licensee has demonstrated the impracticality of exercising the valves every 3 months, and that full stroke e.xercising at cold shutdowns and refuelings is the practical alter native.

3.9 Service Water 3.9.1 The following are valves in the IST progrr dich the licensee intends to test to the applicable code regt "ent.

Valve Category Jalve Category SW-A0V-8 B

SW-CV-276A C

SW-A0V-9 B

SW-CV-27f>B C

SW-A0V-129 B

SW-CV-276C C

SW-A0V-130 B

SW-CV-276D C

3.9.2 Code Relief - Category B Valves 3.9.2.1 Relief Recuest - SW-MOV-1, SW-MOV-2 The licensee has requested relief from exercising the subject vaives closed every 3 months.

Code Recuirenent - See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Recuest - Exercising the subject valves closed every 3 months disrupts cooling water flow to systems required for normal plant operation. The valves will be full stroke exercised at cold shutdowns and refuelings.

Evaluation - The east and west header isolation valves SW-MOV-1 and E4-MOV-2 respectively are open during normal plant operation and are required to close during the emergency condition to assure sufficient service water pressure is available to supply required cooling water to essential service equipment.

-4u-S}h

/

The va'.ves cannot be part strcked, and full stroking them during normal plant operation shutsdown cooling water to the turbine oil cooler, GN2 Cooler, seal oil system coolers and other cooli-sys-tems which are required for plant operation.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 nonths, and that full stroke exercising at cold shutdowns and refuelings is the practical alternative that satisfies the intent of the code.

It is recommended that code relief be granted as requested.

3.9.2.C Relief Reauest - SW-MOV-3, SW-MOV-4.

The licensee has requested relief from exercising the subject valves closed every 3 months.

Code Recuirement - See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Request - Exercising the subject valves closed ev-ery 3 months shutsdown cooling water to the component cooling system heat exchangers.

The valves will be full stroke exercised at cold shutdowns and at refuelings.

Evaluation - The Component Cooling (CC) System Heat Exchanger Di s-charge valves SW-MOV-3 and -4 are open during nomal plant operation.

The valves cannot be part stroked, and closing the valves would stop service water cooling flow through the CC heat exchangers and cause an increase in temperature of letdown water (non-regenerative heat exchanger). These heat exchanges are required to be operative during plant operations.

Based on the above, it is concluded that the licensee has demon-strated the impracticality of exercising the valves every 3 months, and that full stroke exercising at cold shutdowns and refuelings is the practical alternative that satisfies the intent of the code.

It is reccmmended that code relief be granted as requested.

3.9.2.3 Relief Reouest - SW-MOV-5, SW-MOV-6 The licensee's submittal has requested relief from exercising the subject valves open every 3 months, but has not proposed any other exercise frequency at this time.

Code Reauirement - See Code Requirement, Item 3.3.5.1.1 Licensee Basis for Recuest - The licensee expects that exercising the valves would require a maior cleanup of the residual heat exchangers after service water is i.roduced into them.

The licensee has proposed to exercise the valves at the next re-fueling outage (February 1979) and based on the problems encountered (cleanup, time, etc.) make a decision, and propose in the resubmittal the exercise frequency planned.

-.r.

.' ' ? ?.

r-L i;

Evaluation - The RHX inlet valves SW-MOV-5 and -6 are closed during normal plant operation when the component cooling system provides cooling water to the RHX's.

In the emergency mode, the CC system drops out, SW-MOV-5 and -6 open, and RHX cooling is provided by the service water system.

It is agreed that the requirement to clean the RHX's and associated plumbing af ter introduction of service water, makes it impractical to exercise the valves every 3 months as required by the code, and re-lief from this requirement is justified.

However, in that the licensee has not to date proposed an alternative test frequency witn supporting rationale, and has deferred doing so until the resubmit-tal, it is reccumended that the request for code relief be denied at thi s time. The resubmittal with the proposed test frequency and sup-porting rationale should be reviewed and an evaluation made at that time.

. C1l

't O ]

a o

Conclusion The Inservice Testing Program submitted by the Connecticut Yankee Atomic Power Company for the Connecticut Yankee (Haddam Neck Plant), and modified oy this evaluation report is in general compliance with the requirements of Sec-tion XI of the 1974 Edition and Addenda through the Summer of 1975 of the ASME Boiler and Pressure Vessel Code as required by 10 CFR 50.55 a(g), and NRC Staf f guidance letters and briefings.

Those items not found to be in compli-ance with the above, will be addressed in the CYAPC response to the SER meeting and evaluated further.

l a

o; -

e

DISTRIBUTION R. Cerbone 1

P. Check 1

C. Chenq 5

A. Conocla 1

G. Edison 1

D. Eisenhut 1

B. Grimes 1

R. Hall 2

W. Kato 1

G. Lainas

. 1 V. Lettieri 3

tloonan 1

'. Osborne 2

T. Restivo 1

V. Stello 1

T. Tel ford 1

H. Todosaw 2

A. Wana 1

PDR 2

%