ML19242A304
| ML19242A304 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/24/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19242A305 | List: |
| References | |
| NUDOCS 7908010340 | |
| Download: ML19242A304 (2) | |
See also: IR 05000424/1979008
Text
-
_ I /C
-
UNITED STATES
o
E'
NUCLEAR REGilLATORY COMMISSION
'
3.
o
$
" /- E
REGION ll
'
!
101 MARIETTA ST., N.W., sutTE 3100
o,
ATLANT A, G EoRGI A 30303
.....
24 O
In Reply Refer To:
RII:JRH
50-424/79-8
50-425/79-8
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by J. R. Harris of this office on
April 25-27, 1979, of activities euthorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Alvin W. Vogtle Nuclear Unit 1 and 2 facilities,
and to the discussion of our findings held with D. M. Fiquett at the conclusion
of the aspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and tepresentative records, interviews
with personne., and observations by the inspector.
1
,
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed
herewith as Appendix A.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC'u " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to nithhold such information from public disclosure. Any
such application must include a full statement of the reasons on. the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the ap,1i m oion is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
o
.,
'
0
486
001
'7008010 Mo
.
M 241979
%
Georgia Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you-
Sincerely,
'
C. E. Muv y, thief
a
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-424/79-8
and 50-425/79-8
cc w/ encl:
K. M. Gillespie,
Construction Project Maneger
P. O. Box 282
Waynesboro, GA 30830
E. D. Grover
QA Site Supervisor
P. O. Box 282
Waynesbero, GA 30830
48&
UUi