ML19242A304

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/79-08 & 50-425/79-08 on 790425-27 & Notice of Violation
ML19242A304
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/24/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19242A305 List:
References
NUDOCS 7908010340
Download: ML19242A304 (2)


See also: IR 05000424/1979008

Text

-

_ I /C

-

UNITED STATES

o

E'

NUCLEAR REGilLATORY COMMISSION

'

3.

o

$

" /- E

REGION ll

'

!

101 MARIETTA ST., N.W., sutTE 3100

o,

ATLANT A, G EoRGI A 30303

.....

24 O

In Reply Refer To:

RII:JRH

50-424/79-8

50-425/79-8

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by J. R. Harris of this office on

April 25-27, 1979, of activities euthorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Alvin W. Vogtle Nuclear Unit 1 and 2 facilities,

and to the discussion of our findings held with D. M. Fiquett at the conclusion

of the aspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and tepresentative records, interviews

with personne., and observations by the inspector.

1

,

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC'u " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to nithhold such information from public disclosure. Any

such application must include a full statement of the reasons on. the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the ap,1i m oion is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

o

.,

'

0

486

001

'7008010 Mo

.

M 241979

%

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you-

Sincerely,

'

C. E. Muv y, thief

a

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-424/79-8

and 50-425/79-8

cc w/ encl:

K. M. Gillespie,

Construction Project Maneger

P. O. Box 282

Waynesboro, GA 30830

E. D. Grover

QA Site Supervisor

P. O. Box 282

Waynesbero, GA 30830

48&

UUi