Forwards IE Bulletin 79-15, Deep Draft Pump Deficiencies. Action Required
ML19242A151
Person / Time
Site: Summer 
Issue date: 07/11/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 7907310386
Download: ML19242A151 (2)


Text

-

4 p2RIGu UNITED STATES

'o, NUCLEAR REGULATORY COMMISSION

., (f' 7,

/

REGION 11 p%

[

101 MARIETT A ST., N W, SUITS 3100 o, -

AT L AP.T A, GEORGI A 30303

% ' N.'

/

In Reply Refer To:

JUL 1319b RII:JP0 50-395 South Jarolina iectric ar.d Gas Company ATTN:

M. C. Johnson, Vice President Special Services and Pureilasing P. O. Box 764 Colu=bia, SC 29218 Gentlemen:

The enclosed Bulletin No. 79-15 is forwarded to you for action.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

~Qh>

n kg James P. O'Reilly Director

Enclosures:

1.

IE Bullet!.n No. 79-15 2.

Listing of IE Bulletins Issued in Last 12 Months 790733oggg is y

r:a

i South Carolina Electric and Gas Company cc w/ encl:

T. B. Conners, Jr.

Conners, Moore and Corber 1747 Pennsylvania Avenue, N W.

Waubington, D.C.

20006 A. A. Smith Quality Assurance Post Office Sox 8 Jenkinsville, Soutn Carolina 290tS

0. S. Bradham, Manager Nuclear Operations Post Office Box 8 Jenkinsv211e, South Carolina 29065 9

/ !:.r.

f UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND EhTORCEMEh"I WASHINGTON, D.C.

20555 July 11, 1979 IE Bulletin No. 79-15 DEEP DRAFI PUMP DEFICIENCIES Description of Circu= stances:

Co==onwealth Edison Co=pany reported that manufacturing On October 20, 1978, deficiencies had been identified in new high pressure core spray, low pressure core spray, and residual heat re= oval pumps manufactured by Ingersoll-Rand (

Co=pany, Cameron Pu=p Division.

Each of these pu=ps is a vertical turbine pu=p with i=pellers located in bowls The motor (pri=e mover) is located at in a su=p or a self contained barrel.

pu=p elevation to take into account maximu= flooding at the site The suction is at the lover end of the pu=p while the highest or space considerations.

Bearings supporting the vertical the discharge head is just below the driver.

shaft seg=ents (usually 5 to 10 segments) are either self lubricated, force fed (lubricated by fluid being pu= ped), or oil lubricated and maintained within These pu=ps are designated as " Deep Draft".

Figures their own isolated syste=.

11,2 show typical outlines of such pu=ps.

The internal deficiencies, identified through dimensional and visual inspections were as follows:

lov Pr essure Core Spray Pumps (I-R Model No. 29APKD-5) (Date of Manufacture -

Feburary 1973)

Loose impeller bolts and bolts i= properly staked Loose key - keyvsy fit Excessive runout cn pu=p shaft Bearing showed wear Bearing clearance exceeded recoc= ended tolerance Coupling thread galled Wear ring clearance out-of-specification I=peller-to-shaft clearance out of specification Cracks found in second-and-third-stage impellers Stuffing box bushings were severe ogpg7C

~

T

~

Bigh Pressure Core Spray Pumps (1-R Entir a

Septe=ber 1972)

"intO cument i

System under. Previous 3Y entered 4

Bearing clearance exceeded recot 0

h y

Wear ring clearance out-of-spec y Bearings showed waar q